| create or replace package PKG_P8PANELS_PROJECTS as
 | ||
| 
 | ||
|   /* Типы данных - статьи этапа проекта */
 | ||
|   type TSTAGE_ART is record
 | ||
|   (
 | ||
|     NRN                     FPDARTCL.RN%type,   -- Рег. номер статьи
 | ||
|     SCODE                   FPDARTCL.CODE%type, -- Код статьи
 | ||
|     SNAME                   FPDARTCL.NAME%type, -- Наименование статьи
 | ||
|     NPLAN                   PKG_STD.TNUMBER,    -- Плановое значение по статье
 | ||
|     NCOST_FACT              PKG_STD.TNUMBER,    -- Фактические затраты (null - не подлежит контролю затрат)
 | ||
|     NCOST_DIFF              PKG_STD.TNUMBER,    -- Отклонение по затратам (null - не подлежит контролю затрат)
 | ||
|     NCTRL_COST              PKG_STD.TNUMBER,    -- Контроль затрат (null - не подлежит контролю затрат, 0 - без отклонений, 1 - есть отклонения)
 | ||
|     NCONTR                  PKG_STD.TNUMBER,    -- Законтрактовано (null - не подлежит контролю контрактации)
 | ||
|     NCONTR_LEFT             PKG_STD.TNUMBER,    -- Остаток к контрактации (null - не подлежит контролю контрактации)
 | ||
|     NCTRL_CONTR             PKG_STD.TNUMBER     -- Контроль контрактации (null - не подлежит контролю контрактации, 0 - без отклонений, 1 - есть отклонения)
 | ||
|   );
 | ||
|   
 | ||
|   /* Типы данных - коллекция статей этапа проекта */
 | ||
|   type TSTAGE_ARTS is table of TSTAGE_ART; 
 | ||
| 
 | ||
|   /* Отбор проектов */
 | ||
|   procedure COND;
 | ||
| 
 | ||
|   /* Получение рег. номера документа основания (договора) проекта */
 | ||
|   function GET_DOC_OSN_LNK_DOCUMENT
 | ||
|   (
 | ||
|     NRN                     in number   -- Рег. номер проекта
 | ||
|   ) return                  number;     -- Рег. номер документа основания (договора)
 | ||
| 
 | ||
|   /* Подбор платежей финансирования проекта */
 | ||
|   procedure SELECT_FIN
 | ||
|   (
 | ||
|     NRN                     in number, -- Рег. номер проекта
 | ||
|     NDIRECTION              in number, -- Направление (0 - приход, 1 - расход)
 | ||
|     NIDENT                  out number -- Идентификатор буфера подобранных (списка отмеченных записей, null - не найдено)
 | ||
|   );
 | ||
|   
 | ||
|   /* Получение суммы входящего финансирования проекта */
 | ||
|   function GET_FIN_IN
 | ||
|   (
 | ||
|     NRN                     in number   -- Рег. номер проекта
 | ||
|   ) return                  number;     -- Сумма входящего финансирования проекта
 | ||
| 
 | ||
|   /* Получение суммы исходящего финансирования проекта */
 | ||
|   function GET_FIN_OUT
 | ||
|   (
 | ||
|     NRN                     in number   -- Рег. номер проекта
 | ||
|   ) return                  number;     -- Сумма исходяшего финансирования проекта
 | ||
| 
 | ||
|   /* Получение состояния финансирования проекта */
 | ||
|   function GET_CTRL_FIN
 | ||
|   (
 | ||
|     NRN                     in number   -- Рег. номер проекта
 | ||
|   ) return                  number;     -- Состояние (null - не определено, 0 - без отклонений, 1 - есть отклонения)
 | ||
| 
 | ||
|   /* Получение состояния контрактации проекта */
 | ||
|   function GET_CTRL_CONTR
 | ||
|   (
 | ||
|     NRN                     in number   -- Рег. номер проекта
 | ||
|   ) return                  number;     -- Состояние (null - не определено, 0 - без отклонений, 1 - есть отклонения)
 | ||
| 
 | ||
|   /* Получение состояния соисполнения проекта */
 | ||
|   function GET_CTRL_COEXEC
 | ||
|   (
 | ||
|     NRN                     in number   -- Рег. номер проекта
 | ||
|   ) return                  number;     -- Состояние (null - не определено, 0 - без отклонений, 1 - есть отклонения)
 | ||
| 
 | ||
|   /* Получение состояния сроков проекта */
 | ||
|   function GET_CTRL_PERIOD
 | ||
|   (
 | ||
|     NRN                     in number   -- Рег. номер проекта
 | ||
|   ) return                  number;     -- Состояние (null - не определено, 0 - без отклонений, 1 - есть отклонения)
 | ||
|   
 | ||
|   /* Получение состояния затрат проекта */
 | ||
|   function GET_CTRL_COST
 | ||
|   (
 | ||
|     NRN                     in number   -- Рег. номер проекта
 | ||
|   ) return                  number;     -- Состояние (null - не определено, 0 - без отклонений, 1 - есть отклонения)
 | ||
|   
 | ||
|   /* Получение состояния актирования проекта */
 | ||
|   function GET_CTRL_ACT
 | ||
|   (
 | ||
|     NRN                     in number   -- Рег. номер проекта
 | ||
|   ) return                  number;     -- Состояние (null - не определено, 0 - без отклонений, 1 - есть отклонения)
 | ||
| 
 | ||
|   /* Получение % готовности проекта (по затратам) */
 | ||
|   function GET_COST_READY
 | ||
|   (
 | ||
|     NRN                     in number   -- Рег. номер проекта
 | ||
|   ) return                  number;     -- % готовности
 | ||
|   
 | ||
|   /* Список проектов */
 | ||
|   procedure LIST
 | ||
|   (
 | ||
|     NPAGE_NUMBER            in number,  -- Номер страницы (игнорируется при NPAGE_SIZE=0)
 | ||
|     NPAGE_SIZE              in number,  -- Количество записей на странице (0 - все)
 | ||
|     CFILTERS                in clob,    -- Фильтры
 | ||
|     CORDERS                 in clob,    -- Сортировки
 | ||
|     NINCLUDE_DEF            in number,  -- Признак включения описания колонок таблицы в ответ
 | ||
|     COUT                    out clob    -- Сериализованная таблица данных
 | ||
|   );
 | ||
|   
 | ||
|   /* График по данным проектов - "Топ проблем" */
 | ||
|   procedure CHART_PROBLEMS
 | ||
|   (
 | ||
|     COUT                    out clob    -- Сериализованный график
 | ||
|   );
 | ||
| 
 | ||
|   /* График по данным проектов - "Топ заказчиков" */
 | ||
|   procedure CHART_CUSTOMERS
 | ||
|   (
 | ||
|     COUT                    out clob    -- Сериализованный график
 | ||
|   );
 | ||
|   
 | ||
|   /* График по данным проектов - "Затраты на проекты" */
 | ||
|   procedure CHART_FCCOSTNOTES
 | ||
|   (
 | ||
|     COUT                    out clob    -- Сериализованный график
 | ||
|   );
 | ||
|   
 | ||
|   /* График по данным проектов - "Затраты на проекты" (подбор записей журнала затрат по точке графика) */
 | ||
|   procedure CHART_FCCOSTNOTES_SELECT_COST
 | ||
|   (
 | ||
|     NYEAR                   in number,  -- Год
 | ||
|     NMONTH                  in number,  -- Месяц
 | ||
|     NIDENT                  out number  -- Идентификатор буфера подобранных (списка отмеченных записей, null - не найдено)
 | ||
|   );
 | ||
|  
 | ||
|   /* Отбор этапов проектов */
 | ||
|   procedure STAGES_COND;
 | ||
|   
 | ||
|   
 | ||
|   /* Подбор платежей финансирования этапа проекта */
 | ||
|   procedure STAGES_SELECT_FIN
 | ||
|   (
 | ||
|     NPRN                    in number := null, -- Рег. номер проекта (null - не отбирать по проекту)
 | ||
|     NRN                     in number := null, -- Рег. номер этапа проекта (null - не отбирать по этапу)
 | ||
|     NDIRECTION              in number,         -- Направление (0 - приход, 1 - расход)
 | ||
|     NIDENT                  out number         -- Идентификатор буфера подобранных (списка отмеченных записей, null - не найдено)
 | ||
|   );
 | ||
|   
 | ||
|   /* Получение суммы входящего финансирования этапа проекта */
 | ||
|   function STAGES_GET_FIN_IN
 | ||
|   (
 | ||
|     NRN                     in number   -- Рег. номер этапа проекта
 | ||
|   ) return                  number;     -- Сумма входящего финансирования проекта
 | ||
| 
 | ||
|   /* Получение суммы исходящего финансирования этапа проекта */
 | ||
|   function STAGES_GET_FIN_OUT
 | ||
|   (
 | ||
|     NRN                     in number   -- Рег. номер этапа проекта
 | ||
|   ) return                  number;     -- Сумма исходяшего финансирования проекта
 | ||
| 
 | ||
|   /* Получение состояния финансирования этапа проекта */
 | ||
|   function STAGES_GET_CTRL_FIN
 | ||
|   (
 | ||
|     NRN                     in number   -- Рег. номер этапа проекта
 | ||
|   ) return                  number;     -- Состояние (null - не определено, 0 - без отклонений, 1 - есть отклонения)
 | ||
| 
 | ||
|   /* Получение состояния контрактации этапа проекта */
 | ||
|   function STAGES_GET_CTRL_CONTR
 | ||
|   (
 | ||
|     NRN                     in number   -- Рег. номер этапа проекта
 | ||
|   ) return                  number;     -- Состояние (null - не определено, 0 - без отклонений, 1 - есть отклонения)
 | ||
| 
 | ||
|   /* Получение состояния соисполнения этапа проекта */
 | ||
|   function STAGES_GET_CTRL_COEXEC
 | ||
|   (
 | ||
|     NRN                     in number   -- Рег. номер этапа проекта
 | ||
|   ) return                  number;     -- Состояние (null - не определено, 0 - без отклонений, 1 - есть отклонения)
 | ||
|   
 | ||
|   /* Получение состояния сроков этапа проекта */
 | ||
|   function STAGES_GET_CTRL_PERIOD
 | ||
|   (
 | ||
|     NRN                     in number   -- Рег. номер этапа проекта
 | ||
|   ) return                  number;     -- Состояние (null - не определено, 0 - без отклонений, 1 - есть отклонения)
 | ||
|   
 | ||
|   /* Получение состояния затрат этапа проекта */
 | ||
|   function STAGES_GET_CTRL_COST
 | ||
|   (
 | ||
|     NRN                     in number   -- Рег. номер этапа проекта
 | ||
|   ) return                  number;     -- Состояние (null - не определено, 0 - без отклонений, 1 - есть отклонения)
 | ||
|   
 | ||
|   /* Получение состояния актирования этапа проекта */
 | ||
|   function STAGES_GET_CTRL_ACT
 | ||
|   (
 | ||
|     NRN                     in number   -- Рег. номер этапа проекта
 | ||
|   ) return                  number;     -- Состояние (null - не определено, 0 - без отклонений, 1 - есть отклонения)
 | ||
|   
 | ||
|   /* Получение остатка срока исполнения этапа проекта */
 | ||
|   function STAGES_GET_DAYS_LEFT
 | ||
|   (
 | ||
|     NRN                     in number   -- Рег. номер этапа проекта
 | ||
|   ) return                  number;     -- Количество дней (null - не определено)
 | ||
|   
 | ||
|   /* Подбор записей журнала затрат этапа проекта */
 | ||
|   procedure STAGES_SELECT_COST_FACT
 | ||
|   (
 | ||
|     NRN                     in number,  -- Рег. номер этапа проекта
 | ||
|     NIDENT                  out number  -- Идентификатор буфера подобранных (списка отмеченных записей, null - не найдено)
 | ||
|   );
 | ||
|   
 | ||
|   /* Получение суммы фактических затрат этапа проекта */
 | ||
|   function STAGES_GET_COST_FACT
 | ||
|   (
 | ||
|     NRN                     in number   -- Рег. номер этапа проекта
 | ||
|   ) return                  number;     -- Сумма фактических затрат
 | ||
| 
 | ||
|   /* Подбор записей расходных накладных на отпуск потребителям этапа проекта */
 | ||
|   procedure STAGES_SELECT_SUMM_REALIZ
 | ||
|   (
 | ||
|     NRN                     in number,  -- Рег. номер этапа проекта
 | ||
|     NIDENT                  out number  -- Идентификатор буфера подобранных (списка отмеченных записей, null - не найдено)
 | ||
|   );
 | ||
|   
 | ||
|   /* Получение суммы реализации этапа проекта */
 | ||
|   function STAGES_GET_SUMM_REALIZ
 | ||
|   (
 | ||
|     NRN                     in number,  -- Рег. номер этапа проекта
 | ||
|     NFPDARTCL_REALIZ        in number   -- Рег. номер статьи калькуляции для реализации
 | ||
|   ) return                  number;     -- Сумма реализации
 | ||
|   
 | ||
|   /* Получение % готовности этапа проекта (по затратам) */
 | ||
|   function STAGES_GET_COST_READY
 | ||
|   (
 | ||
|     NRN                     in number   -- Рег. номер этапа проекта
 | ||
|   ) return                  number;     -- Сумма реализации
 | ||
|   
 | ||
|   /* Список этапов */
 | ||
|   procedure STAGES_LIST
 | ||
|   (
 | ||
|     NPRN                    in number,  -- Рег. номер проекта
 | ||
|     NPAGE_NUMBER            in number,  -- Номер страницы (игнорируется при NPAGE_SIZE=0)
 | ||
|     NPAGE_SIZE              in number,  -- Количество записей на странице (0 - все)
 | ||
|     CFILTERS                in clob,    -- Фильтры
 | ||
|     CORDERS                 in clob,    -- Сортировки
 | ||
|     NINCLUDE_DEF            in number,  -- Признак включения описания колонок таблицы в ответ
 | ||
|     COUT                    out clob    -- Сериализованная таблица данных
 | ||
|   );
 | ||
|   
 | ||
|   /* Подбор записей журнала затрат по статье калькуляции этапа проекта */
 | ||
|   procedure STAGE_ARTS_SELECT_COST_FACT
 | ||
|   (
 | ||
|     NSTAGE                  in number,         -- Рег. номер этапа проекта
 | ||
|     NFPDARTCL               in number := null, -- Рег. номер статьи затрат (null - по всем)
 | ||
|     NFINFLOW_TYPE           in number := null, -- Вид движения по статье (null - по всем, 0 - остаток, 1 - приход, 2 - расход)
 | ||
|     NIDENT                  out number         -- Идентификатор буфера подобранных (списка отмеченных записей, null - не найдено)
 | ||
|   );
 | ||
|   
 | ||
|   /* Получение суммы-факт по статье калькуляции этапа проекта */
 | ||
|   function STAGE_ARTS_GET_COST_FACT
 | ||
|   (
 | ||
|     NSTAGE                  in number,         -- Рег. номер этапа проекта
 | ||
|     NFPDARTCL               in number := null, -- Рег. номер статьи калькуляции (null - по всем)
 | ||
|     NFINFLOW_TYPE           in number := null  -- Вид движения по статье (null - по всем, 0 - остаток, 1 - приход, 2 - расход)
 | ||
|   ) return                  number;            -- Сумма-факт по статье
 | ||
|   
 | ||
|   /* Подбор записей договоров с соисполнителями по статье калькуляции этапа проекта */
 | ||
|   procedure STAGE_ARTS_SELECT_CONTR
 | ||
|   (
 | ||
|     NSTAGE                  in number,         -- Рег. номер этапа проекта
 | ||
|     NFPDARTCL               in number := null, -- Рег. номер статьи затрат (null - по всем)
 | ||
|     NIDENT                  out number         -- Идентификатор буфера подобранных (списка отмеченных записей, null - не найдено)
 | ||
|   );
 | ||
|   
 | ||
|   /* Получение списка статей этапа проекта */
 | ||
|   procedure STAGE_ARTS_GET
 | ||
|   (
 | ||
|     NSTAGE                  in number,         -- Рег. номер этапа проекта
 | ||
|     NFPDARTCL               in number := null, -- Рег. номер статьи затрат (null - брать все)
 | ||
|     NINC_COST               in number := 0,    -- Включить сведения о затратах (0 - нет, 1 - да)
 | ||
|     NINC_CONTR              in number := 0,    -- Включить сведения о контрактации (0 - нет, 1 - да)
 | ||
|     RSTAGE_ARTS             out TSTAGE_ARTS    -- Список статей этапа проекта
 | ||
|   );
 | ||
|   
 | ||
|   /* Список статей калькуляции этапа проекта */
 | ||
|   procedure STAGE_ARTS_LIST
 | ||
|   (
 | ||
|     NSTAGE                  in number,  -- Рег. номер этапа проекта
 | ||
|     CFILTERS                in clob,    -- Фильтры
 | ||
|     NINCLUDE_DEF            in number,  -- Признак включения описания колонок таблицы в ответ
 | ||
|     COUT                    out clob    -- Сериализованная таблица данных
 | ||
|   );
 | ||
| 
 | ||
|   /* Список договоров этапа проекта */
 | ||
|   procedure STAGE_CONTRACTS_COND;
 | ||
| 
 | ||
|   /* Подбор входящих счетов на оплату соисполнителя этапа проекта */
 | ||
|   procedure STAGE_CONTRACTS_SELECT_PAY_IN
 | ||
|   (
 | ||
|     NPROJECTSTAGEPF         in number,  -- Рег. номер соисполнителя этапа проекта
 | ||
|     NIDENT                  out number  -- Идентификатор буфера подобранных (списка отмеченных записей, null - не найдено)
 | ||
|   );
 | ||
| 
 | ||
|   /* Подбор приходных накладных соисполнителя этапа проекта */
 | ||
|   procedure STAGE_CONTRACTS_SELECT_ININV
 | ||
|   (
 | ||
|     NPROJECTSTAGEPF         in number,  -- Рег. номер соисполнителя этапа проекта
 | ||
|     NIDENT                  out number  -- Идентификатор буфера подобранных (списка отмеченных записей, null - не найдено)
 | ||
|   );
 | ||
|   
 | ||
|   /* Подбор платежей финансирования соисполнителя этапа проекта */
 | ||
|   procedure STAGE_CONTRACTS_SELECT_FIN_OUT
 | ||
|   (
 | ||
|     NPROJECTSTAGEPF         in number,  -- Рег. номер соисполнителя этапа проекта
 | ||
|     NIDENT                  out number  -- Идентификатор буфера подобранных (списка отмеченных записей, null - не найдено)
 | ||
|   );
 | ||
|   
 | ||
|   /* Получение состояния финансирования по договору соисполнителя этапа проекта */
 | ||
|   function STAGE_CONTRACTS_GET_CTRL_FIN
 | ||
|   (
 | ||
|     NPROJECTSTAGEPF         in number   -- Рег. номер соисполнителя этапа проекта
 | ||
|   ) return                  number;     -- Состояние (null - не определено, 0 - без отклонений, 1 - есть отклонения)
 | ||
| 
 | ||
|   /* Получение состояния соисполнения по договору соисполнителя этапа проекта */
 | ||
|   function STAGE_CONTRACTS_GET_CTRL_COEXE
 | ||
|   (
 | ||
|     NPROJECTSTAGEPF         in number   -- Рег. номер соисполнителя этапа проекта
 | ||
|   ) return                  number;     -- Состояние (null - не определено, 0 - без отклонений, 1 - есть отклонения)
 | ||
| 
 | ||
|   /* Получение сведений по договору соисполнителя этапа проекта */
 | ||
|   procedure STAGE_CONTRACTS_GET
 | ||
|   (
 | ||
|     NPROJECTSTAGEPF         in number,      -- Рег. номер соисполнителя этапа проекта
 | ||
|     NINC_FIN                in number := 0, -- Включить сведения о финансировании (0 - нет, 1 - да)
 | ||
|     NINC_COEXEC             in number := 0, -- Включить сведения о соисполнении (0 - нет, 1 - да)
 | ||
|     NPAY_IN                 out number,     -- Сведения о финансировании - сумма акцептованных счетов на оплату
 | ||
|     NFIN_OUT                out number,     -- Сведения о финансировании - сумма оплаченных счетов на оплату
 | ||
|     NPAY_IN_REST            out number,     -- Сведения о финансировании - сумма оставшихся к оплате счетов на оплату
 | ||
|     NFIN_REST               out number,     -- Сведения о финансировании - общий остаток к оплате по договору
 | ||
|     NCTRL_FIN               out number,     -- Сведения о финансировании - состояние (null - не определено, 0 - без отклонений, 1 - есть отклонения)
 | ||
|     NCOEXEC_IN              out number,     -- Сведения о соисполнении - получено актов/накладных
 | ||
|     NCOEXEC_REST            out number,     -- Сведения о соисполнении - остаток к актированию/поставке
 | ||
|     NCTRL_COEXEC            out number      -- Сведения о соисполнении - состояние (null - не определено, 0 - без отклонений, 1 - есть отклонения)
 | ||
|   );
 | ||
|   
 | ||
|   /* Список договоров этапа проекта */
 | ||
|   procedure STAGE_CONTRACTS_LIST
 | ||
|   (
 | ||
|     NSTAGE                  in number,  -- Рег. номер этапа проекта
 | ||
|     NPAGE_NUMBER            in number,  -- Номер страницы (игнорируется при NPAGE_SIZE=0)
 | ||
|     NPAGE_SIZE              in number,  -- Количество записей на странице (0 - все)
 | ||
|     CFILTERS                in clob,    -- Фильтры
 | ||
|     CORDERS                 in clob,    -- Сортировки
 | ||
|     NINCLUDE_DEF            in number,  -- Признак включения описания колонок таблицы в ответ
 | ||
|     COUT                    out clob    -- Сериализованная таблица данных
 | ||
|   );
 | ||
| 
 | ||
|     /* Получение списка проектов */
 | ||
|   procedure JB_PRJCTS_LIST
 | ||
|   (
 | ||
|     NIDENT                  in number,  -- Идентификатор процесса
 | ||
|     COUT                    out clob    -- Список проектов
 | ||
|   );
 | ||
|   
 | ||
|   /* Изменение сроков работы в буфере балансировки */
 | ||
|   procedure JB_JOBS_MODIFY_PERIOD
 | ||
|   (
 | ||
|     NJB_JOBS                in number,  -- Рег. номер записи балансируемой работы/этапа
 | ||
|     DDATE_FROM              in date,    -- Новая дата начала
 | ||
|     DDATE_TO                in date,    -- Новая дата окончания
 | ||
|     DBEGIN                  in date,    -- Дата начала периода мониторинга загрузки ресурсов
 | ||
|     NRESOURCE_STATUS        out number  -- Состояние ресурсов (0 - без отклонений, 1 - есть отклонения)
 | ||
|   );
 | ||
|   
 | ||
|   /* Получение списка работ проектов для диаграммы Ганта */
 | ||
|   procedure JB_JOBS_LIST
 | ||
|   (
 | ||
|     NIDENT                  in number,  -- Идентификатор процесса
 | ||
|     NPRN                    in number,  -- Рег. номер родителя
 | ||
|     NINCLUDE_DEF            in number,  -- Признак включения описания диаграммы в ответ
 | ||
|     COUT                    out clob    -- Список проектов
 | ||
|   );
 | ||
|   
 | ||
|     /* Получение списка для детализации трудоёмкости по ФОТ периода балансировки */
 | ||
|   procedure JB_PERIODS_LIST_PLAN_FOT
 | ||
|   (
 | ||
|     NJB_PERIODS             in number,  -- Рег. номер записи периода в буфере балансировки
 | ||
|     NPAGE_NUMBER            in number,  -- Номер страницы (игнорируется при NPAGE_SIZE=0)
 | ||
|     NPAGE_SIZE              in number,  -- Количество записей на странице (0 - все)
 | ||
|     CORDERS                 in clob,    -- Сортировки    
 | ||
|     NINCLUDE_DEF            in number,  -- Признак включения описания колонок таблицы в ответ
 | ||
|     COUT                    out clob    -- Сериализованная таблица данных
 | ||
|   );
 | ||
|   
 | ||
|   /* Получение списка для детализации трудоёмкости периода балансировки по текущему состоянию графика */
 | ||
|   procedure JB_PERIODS_LIST_PLAN_JOBS
 | ||
|   (
 | ||
|     NJB_PERIODS             in number,  -- Рег. номер записи периода в буфере балансировки
 | ||
|     NPAGE_NUMBER            in number,  -- Номер страницы (игнорируется при NPAGE_SIZE=0)
 | ||
|     NPAGE_SIZE              in number,  -- Количество записей на странице (0 - все)
 | ||
|     CORDERS                 in clob,    -- Сортировки    
 | ||
|     NINCLUDE_DEF            in number,  -- Признак включения описания колонок таблицы в ответ
 | ||
|     COUT                    out clob    -- Сериализованная таблица данных
 | ||
|   );
 | ||
|   
 | ||
|   /* Пересчёт периодов балансировки */
 | ||
|   procedure JB_PERIODS_RECALC
 | ||
|   (
 | ||
|     NIDENT                  in number,  -- Идентификатор процесса
 | ||
|     DBEGIN                  in date,    -- Дата начала периода мониторинга загрузки ресурсов
 | ||
|     NINITIAL                in number,  -- Признак первоначального рассчёта (0 - пересчёт, 1 - первоначальный рассчёт)
 | ||
|     NRESOURCE_STATUS        out number  -- Состояние ресурсов (0 - без отклонений, 1 - есть отклонения)
 | ||
|   );
 | ||
|   
 | ||
|   /* Список периодов балансировки */
 | ||
|   procedure JB_PERIODS_LIST
 | ||
|   (
 | ||
|     NIDENT                  in number,  -- Идентификатор процесса
 | ||
|     NPAGE_NUMBER            in number,  -- Номер страницы (игнорируется при NPAGE_SIZE=0)
 | ||
|     NPAGE_SIZE              in number,  -- Количество записей на странице (0 - все)
 | ||
|     CORDERS                 in clob,    -- Сортировки    
 | ||
|     NINCLUDE_DEF            in number,  -- Признак включения описания колонок таблицы в ответ
 | ||
|     COUT                    out clob    -- Сериализованная таблица данных
 | ||
|   );
 | ||
|   
 | ||
|   /* Очистка данных балансировки */
 | ||
|   procedure JB_CLEAN
 | ||
|   (
 | ||
|     NIDENT                  in number   -- Идентификатор буфера сформированных данных
 | ||
|   );
 | ||
|   
 | ||
|   /* Формирование исходных данных для балансировки планов-графиков работ */
 | ||
|   procedure JB_INIT
 | ||
|   (
 | ||
|     DBEGIN                  in out date,     -- Дата начала периода мониторинга загрузки ресурсов
 | ||
|     DFACT                   in out date,     -- Факт по состоянию на
 | ||
|     NDURATION_MEAS          in out number,   -- Единица измерения длительности (0 - день, 1 - неделя, 2 - декада, 3 - месяц, 4 - квартал, 5 - год)
 | ||
|     SLAB_MEAS               in out varchar2, -- Единица измерения трудоёмкости
 | ||
|     NIDENT                  in out number,   -- Идентификатор буфера сформированных данных (null - сгенерировать новый, !null - удалить старые данные и пересоздать с указанным идентификатором)
 | ||
|     NRESOURCE_STATUS        out number       -- Состояние ресурсов (0 - без отклонений, 1 - есть отклонения)    
 | ||
|   );
 | ||
| 
 | ||
| end PKG_P8PANELS_PROJECTS;
 | ||
| /
 | ||
| create or replace package body PKG_P8PANELS_PROJECTS as
 | ||
| 
 | ||
| /*
 | ||
| TODO: owner="root" created="25.10.2023"
 | ||
| text="Пересчёт единиц измерения в мониторе плана-графика"
 | ||
| */
 | ||
| 
 | ||
| /*
 | ||
| TODO: owner="root" created="25.10.2023"
 | ||
| text="Буфер для хранения параметров балансировки и читать их оттуда для вызовов JB_JOBS_MODIFY_PERIOD, JB_JOBS_PERIODS_RECALC"
 | ||
| */
 | ||
| 
 | ||
| /*
 | ||
| TODO: owner="root" created="25.10.2023"
 | ||
| text="Права доступа в мониторе ресурвов при балансировке планов-графиков"
 | ||
| */
 | ||
| 
 | ||
| /*
 | ||
| TODO: owner="root" created="25.10.2023"
 | ||
| text="Признак измененности на работах, чтобы удобнее было переносить в проект"
 | ||
| */
 | ||
| 
 | ||
| /*
 | ||
| TODO: owner="root" created="25.10.2023"
 | ||
| text="Вынести расчте плановой трудоёмкости по графику (и всех её причендалов) в отдельную функцию (и), чтобы можно было включить её в динамический запрос и вернуть сортировку по полям трудоёмкости в JB_PERIODS_LIST_PLAN_JOBS"
 | ||
| */
 | ||
| 
 | ||
| /*
 | ||
| TODO: owner="root" created="25.10.2023"
 | ||
| text="Проверить, что для расчётных полей дата-гридов отключена сортировка - иначе получается ошибка, т.к. поля нет в SQL-запросе"
 | ||
| */
 | ||
| 
 | ||
| 
 | ||
|   /* Константы - предопределённые значения */
 | ||
|   SYES                        constant PKG_STD.TSTRING := 'Да';               -- Да
 | ||
|   NDAYS_LEFT_LIMIT            constant PKG_STD.TNUMBER := 30;                 -- Лимит отстатка дней для контроля сроков
 | ||
|   SFPDARTCL_REALIZ            constant PKG_STD.TSTRING := '14 Цена без НДС';  -- Мнемокод статьи калькуляции для учёта реализации
 | ||
|   SFPDARTCL_SELF_COST         constant PKG_STD.TSTRING := '10 Себестоимость'; -- Мнемокод статьи калькуляции для учёта себестоимости
 | ||
|   NGANTT_TASK_CAPTION_LEN     constant PKG_STD.TNUMBER := 50;                 -- Предельная длина (знаков) метки задачи при отображении диаграммы Ганта
 | ||
|   NJB_DURATION_MEAS           constant PKG_STD.TNUMBER := 0;                  -- Единица измерения длительности по умолчанию для интерфейса балансировки работ (0 - день, 1 - неделя, 2 - декада, 3 - месяц, 4 - квартал, 5 - год)
 | ||
|   SJB_LAB_MEAS                constant PKG_STD.TSTRING := 'Ч/Ч';              -- Единица измерения трудоёмкости по умолчанию для интерфейса балансировки работ
 | ||
| 
 | ||
|   /* Константы - дополнительные свойства */
 | ||
|   SDP_SECON_RESP              constant PKG_STD.TSTRING := 'ПУП.SECON_RESP'; -- Ответственный экономист проекта
 | ||
|   SDP_STAX_GROUP              constant PKG_STD.TSTRING := 'ПУП.TAX_GROUP';  -- Налоговая группа проекта
 | ||
|   SDP_SCTL_COST               constant PKG_STD.TSTRING := 'ПУП.CTL_COST';   -- Принзнак необходимости контроля факт. затрат по статье калькуляции
 | ||
|   SDP_SCTL_CONTR              constant PKG_STD.TSTRING := 'ПУП.CTL_CONTR';  -- Принзнак необходимости контроля контрактации по статье калькуляции
 | ||
| 
 | ||
|   /* Считывание наименование подразделения по рег. номеру */
 | ||
|   function UTL_INS_DEPARTMENT_GET_NAME
 | ||
|   (
 | ||
|     NRN                     in number        -- Рег. номер подразделения
 | ||
|   ) return                  varchar2         -- Наименование подразеления (null - если не нашли)
 | ||
|   is
 | ||
|     SRES                    PKG_STD.TSTRING; -- Буфер для результата
 | ||
|   begin
 | ||
|     select T.NAME into SRES from INS_DEPARTMENT T where T.RN = NRN;
 | ||
|     return SRES;
 | ||
|   exception
 | ||
|     when NO_DATA_FOUND then
 | ||
|       return null;
 | ||
|   end UTL_INS_DEPARTMENT_GET_NAME;   
 | ||
|      
 | ||
|   /* Считывание записи проекта */
 | ||
|   function GET
 | ||
|   (
 | ||
|     NRN                     in number        -- Рег. номер проекта
 | ||
|   ) return                  PROJECT%rowtype  -- Запись проекта
 | ||
|   is
 | ||
|     RRES                    PROJECT%rowtype; -- Буфер для результата
 | ||
|   begin
 | ||
|     select P.* into RRES from PROJECT P where P.RN = NRN;
 | ||
|     return RRES;
 | ||
|   exception
 | ||
|     when NO_DATA_FOUND then
 | ||
|       PKG_MSG.RECORD_NOT_FOUND(NFLAG_SMART => 0, NDOCUMENT => NRN, SUNIT_TABLE => 'PROJECT');
 | ||
|   end GET;
 | ||
| 
 | ||
|   /* Отбор проектов */
 | ||
|   procedure COND
 | ||
|   as
 | ||
|   begin
 | ||
|     /* Установка главной таблицы */
 | ||
|     PKG_COND_BROKER.SET_TABLE(STABLE_NAME => 'PROJECT');
 | ||
|     /* Тип проекта */
 | ||
|     PKG_COND_BROKER.ADD_CONDITION_CODE(SCOLUMN_NAME    => 'CODE',
 | ||
|                                        SCONDITION_NAME => 'EDPROJECTTYPE',
 | ||
|                                        SJOINS          => 'PRJTYPE <- RN;PRJTYPE');
 | ||
|     /* Мнемокод */
 | ||
|     PKG_COND_BROKER.ADD_CONDITION_CODE(SCOLUMN_NAME => 'CODE', SCONDITION_NAME => 'EDMNEMO');
 | ||
|     /* Наименование */
 | ||
|     PKG_COND_BROKER.ADD_CONDITION_CODE(SCOLUMN_NAME => 'NAME', SCONDITION_NAME => 'EDNAME');
 | ||
|     /* Услованое наименование */
 | ||
|     PKG_COND_BROKER.ADD_CONDITION_CODE(SCOLUMN_NAME => 'NAME_USL', SCONDITION_NAME => 'EDNAME_USL');
 | ||
|     /* Дата начала план */
 | ||
|     PKG_COND_BROKER.ADD_CONDITION_BETWEEN(SCOLUMN_NAME         => 'BEGPLAN',
 | ||
|                                           SCONDITION_NAME_FROM => 'EDPLANBEGFrom',
 | ||
|                                           SCONDITION_NAME_TO   => 'EDPLANBEGTo');
 | ||
|     /* Дата окончания план */
 | ||
|     PKG_COND_BROKER.ADD_CONDITION_BETWEEN(SCOLUMN_NAME         => 'ENDPLAN',
 | ||
|                                           SCONDITION_NAME_FROM => 'EDPLANENDFrom',
 | ||
|                                           SCONDITION_NAME_TO   => 'EDPLANENDTo');
 | ||
|     /* Состояние */
 | ||
|     PKG_COND_BROKER.ADD_CONDITION_ENUM(SCOLUMN_NAME => 'STATE', SCONDITION_NAME => 'CGSTATE');
 | ||
|     /* Заказчик */
 | ||
|     PKG_COND_BROKER.ADD_CONDITION_CODE(SCOLUMN_NAME    => 'AGNABBR',
 | ||
|                                        SCONDITION_NAME => 'EDEXT_CUST',
 | ||
|                                        SJOINS          => 'EXT_CUST <- RN;AGNLIST');
 | ||
|     /* Контроль финансирования */
 | ||
|     if (PKG_COND_BROKER.CONDITION_EXISTS(SCONDITION_NAME => 'EDCTRL_FIN') = 1) then
 | ||
|       PKG_COND_BROKER.ADD_CLAUSE(SCLAUSE => 'PKG_P8PANELS_PROJECTS.GET_CTRL_FIN(RN) = :EDCTRL_FIN');
 | ||
|       PKG_COND_BROKER.BIND_VARIABLE(SVARIABLE_NAME => 'EDCTRL_FIN',
 | ||
|                                     NVALUE         => PKG_COND_BROKER.GET_CONDITION_NUM(SCONDITION_NAME => 'EDCTRL_FIN'));
 | ||
|     end if;  
 | ||
|     /* Контроль контрактации */
 | ||
|     if (PKG_COND_BROKER.CONDITION_EXISTS(SCONDITION_NAME => 'EDCTRL_CONTR') = 1) then
 | ||
|       PKG_COND_BROKER.ADD_CLAUSE(SCLAUSE => 'PKG_P8PANELS_PROJECTS.GET_CTRL_CONTR(RN) = :EDCTRL_CONTR');
 | ||
|       PKG_COND_BROKER.BIND_VARIABLE(SVARIABLE_NAME => 'EDCTRL_CONTR',
 | ||
|                                     NVALUE         => PKG_COND_BROKER.GET_CONDITION_NUM(SCONDITION_NAME => 'EDCTRL_CONTR'));
 | ||
|     end if;
 | ||
|     /* Контроль соисполнения */
 | ||
|     if (PKG_COND_BROKER.CONDITION_EXISTS(SCONDITION_NAME => 'EDCTRL_COEXEC') = 1) then
 | ||
|       PKG_COND_BROKER.ADD_CLAUSE(SCLAUSE => 'PKG_P8PANELS_PROJECTS.GET_CTRL_COEXEC(RN) = :EDCTRL_COEXEC');
 | ||
|       PKG_COND_BROKER.BIND_VARIABLE(SVARIABLE_NAME => 'EDCTRL_COEXEC',
 | ||
|                                     NVALUE         => PKG_COND_BROKER.GET_CONDITION_NUM(SCONDITION_NAME => 'EDCTRL_COEXEC'));
 | ||
|     end if;
 | ||
|     /* Контроль сроков */
 | ||
|     if (PKG_COND_BROKER.CONDITION_EXISTS(SCONDITION_NAME => 'EDCTRL_PERIOD') = 1) then
 | ||
|       PKG_COND_BROKER.ADD_CLAUSE(SCLAUSE => 'PKG_P8PANELS_PROJECTS.GET_CTRL_PERIOD(RN) = :EDCTRL_PERIOD');
 | ||
|       PKG_COND_BROKER.BIND_VARIABLE(SVARIABLE_NAME => 'EDCTRL_PERIOD',
 | ||
|                                     NVALUE         => PKG_COND_BROKER.GET_CONDITION_NUM(SCONDITION_NAME => 'EDCTRL_PERIOD'));
 | ||
|     end if;
 | ||
|     /* Контроль затрат */
 | ||
|     if (PKG_COND_BROKER.CONDITION_EXISTS(SCONDITION_NAME => 'EDCTRL_COST') = 1) then
 | ||
|       PKG_COND_BROKER.ADD_CLAUSE(SCLAUSE => 'PKG_P8PANELS_PROJECTS.GET_CTRL_COST(RN) = :EDCTRL_COST');
 | ||
|       PKG_COND_BROKER.BIND_VARIABLE(SVARIABLE_NAME => 'EDCTRL_COST',
 | ||
|                                     NVALUE         => PKG_COND_BROKER.GET_CONDITION_NUM(SCONDITION_NAME => 'EDCTRL_COST'));
 | ||
|     end if;
 | ||
|     /* Контроль актирования */
 | ||
|     if (PKG_COND_BROKER.CONDITION_EXISTS(SCONDITION_NAME => 'EDCTRL_ACT') = 1) then
 | ||
|       PKG_COND_BROKER.ADD_CLAUSE(SCLAUSE => 'PKG_P8PANELS_PROJECTS.GET_CTRL_ACT(RN) = :EDCTRL_ACT');
 | ||
|       PKG_COND_BROKER.BIND_VARIABLE(SVARIABLE_NAME => 'EDCTRL_ACT',
 | ||
|                                     NVALUE         => PKG_COND_BROKER.GET_CONDITION_NUM(SCONDITION_NAME => 'EDCTRL_ACT'));
 | ||
|     end if;
 | ||
|     /* Готовность (%, по затратам) */
 | ||
|     if ((PKG_COND_BROKER.CONDITION_EXISTS(SCONDITION_NAME => 'EDCOST_READYFrom') = 1) and
 | ||
|        (PKG_COND_BROKER.CONDITION_EXISTS(SCONDITION_NAME => 'EDCOST_READYTo') = 0)) then
 | ||
|       PKG_COND_BROKER.ADD_CLAUSE(SCLAUSE => 'PKG_P8PANELS_PROJECTS.GET_COST_READY(RN) >= :EDCOST_READYFrom');
 | ||
|       PKG_COND_BROKER.BIND_VARIABLE(SVARIABLE_NAME => 'EDCOST_READYFrom',
 | ||
|                                     NVALUE         => PKG_COND_BROKER.GET_CONDITION_NUM(SCONDITION_NAME => 'EDCOST_READYFrom'));
 | ||
|     end if;
 | ||
|     if ((PKG_COND_BROKER.CONDITION_EXISTS(SCONDITION_NAME => 'EDCOST_READYTo') = 1) and
 | ||
|        (PKG_COND_BROKER.CONDITION_EXISTS(SCONDITION_NAME => 'EDCOST_READYFrom') = 0)) then
 | ||
|       PKG_COND_BROKER.ADD_CLAUSE(SCLAUSE => 'PKG_P8PANELS_PROJECTS.GET_COST_READY(RN) <= :EDCOST_READYTo');
 | ||
|       PKG_COND_BROKER.BIND_VARIABLE(SVARIABLE_NAME => 'EDCOST_READYTo',
 | ||
|                                     NVALUE         => PKG_COND_BROKER.GET_CONDITION_NUM(SCONDITION_NAME => 'EDCOST_READYTo'));
 | ||
|     end if;
 | ||
|     if ((PKG_COND_BROKER.CONDITION_EXISTS(SCONDITION_NAME => 'EDCOST_READYFrom') = 1) and
 | ||
|        (PKG_COND_BROKER.CONDITION_EXISTS(SCONDITION_NAME => 'EDCOST_READYTo') = 1)) then
 | ||
|       PKG_COND_BROKER.ADD_CLAUSE(SCLAUSE => 'PKG_P8PANELS_PROJECTS.GET_COST_READY(RN) between :EDCOST_READYFrom and :EDCOST_READYTo');
 | ||
|       PKG_COND_BROKER.BIND_VARIABLE(SVARIABLE_NAME => 'EDCOST_READYFrom',
 | ||
|                                     NVALUE         => PKG_COND_BROKER.GET_CONDITION_NUM(SCONDITION_NAME => 'EDCOST_READYFrom'));
 | ||
|       PKG_COND_BROKER.BIND_VARIABLE(SVARIABLE_NAME => 'EDCOST_READYTo',
 | ||
|                                     NVALUE         => PKG_COND_BROKER.GET_CONDITION_NUM(SCONDITION_NAME => 'EDCOST_READYTo'));
 | ||
|     end if;    
 | ||
|   end COND;
 | ||
|   
 | ||
|   /* Получение рег. номера документа основания (договора) проекта */
 | ||
|   function GET_DOC_OSN_LNK_DOCUMENT
 | ||
|   (
 | ||
|     NRN                     in number   -- Рег. номер проекта
 | ||
|   ) return                  number      -- Рег. номер документа основания (договора)
 | ||
|   is
 | ||
|   begin
 | ||
|     /* Подберём договор с заказчиком по ЛС этапа проекта */
 | ||
|     for C in (select CN.RN
 | ||
|                 from PROJECTSTAGE PS,
 | ||
|                      STAGES       S,
 | ||
|                      CONTRACTS    CN
 | ||
|                where PS.PRN = NRN
 | ||
|                  and PS.FACEACCCUST = S.FACEACC
 | ||
|                  and S.PRN = CN.RN
 | ||
|                  and exists (select null from V_USERPRIV UP where UP.CATALOG = PS.CRN)
 | ||
|                  and exists (select null
 | ||
|                         from V_USERPRIV UP
 | ||
|                        where UP.JUR_PERS = PS.JUR_PERS
 | ||
|                          and UP.UNITCODE = 'Projects')
 | ||
|                  and exists (select /*+ INDEX(UP I_USERPRIV_CATALOG_ROLEID) */
 | ||
|                        null
 | ||
|                         from USERPRIV UP
 | ||
|                        where UP.CATALOG = CN.CRN
 | ||
|                          and UP.ROLEID in (select /*+ INDEX(UR I_USERROLES_AUTHID_FK) */
 | ||
|                                             UR.ROLEID
 | ||
|                                              from USERROLES UR
 | ||
|                                             where UR.AUTHID = UTILIZER)
 | ||
|                       union all
 | ||
|                       select /*+ INDEX(UP I_USERPRIV_CATALOG_AUTHID) */
 | ||
|                        null
 | ||
|                         from USERPRIV UP
 | ||
|                        where UP.CATALOG = CN.CRN
 | ||
|                          and UP.AUTHID = UTILIZER)
 | ||
|                  and exists (select /*+ INDEX(UP I_USERPRIV_JUR_PERS_ROLEID) */
 | ||
|                        null
 | ||
|                         from USERPRIV UP
 | ||
|                        where UP.JUR_PERS = CN.JUR_PERS
 | ||
|                          and UP.UNITCODE = 'Contracts'
 | ||
|                          and UP.ROLEID in (select /*+ INDEX(UR I_USERROLES_AUTHID_FK) */
 | ||
|                                             UR.ROLEID
 | ||
|                                              from USERROLES UR
 | ||
|                                             where UR.AUTHID = UTILIZER)
 | ||
|                       union all
 | ||
|                       select /*+ INDEX(UP I_USERPRIV_JUR_PERS_AUTHID) */
 | ||
|                        null
 | ||
|                         from USERPRIV UP
 | ||
|                        where UP.JUR_PERS = CN.JUR_PERS
 | ||
|                          and UP.UNITCODE = 'Contracts'
 | ||
|                          and UP.AUTHID = UTILIZER)
 | ||
|                group by CN.RN)
 | ||
|     loop
 | ||
|       /* Вернём первый найденный */
 | ||
|       return C.RN;
 | ||
|     end loop;
 | ||
|     /* Ничего не нашли */
 | ||
|     return null;
 | ||
|   end GET_DOC_OSN_LNK_DOCUMENT;
 | ||
| 
 | ||
|   /* Подбор платежей финансирования проекта */
 | ||
|   procedure SELECT_FIN
 | ||
|   (
 | ||
|     NRN                     in number, -- Рег. номер проекта
 | ||
|     NDIRECTION              in number, -- Направление (0 - приход, 1 - расход)
 | ||
|     NIDENT                  out number -- Идентификатор буфера подобранных (списка отмеченных записей, null - не найдено)
 | ||
|   )
 | ||
|   is
 | ||
|   begin
 | ||
|     /* Подберём платежи */
 | ||
|     STAGES_SELECT_FIN(NPRN => NRN, NDIRECTION => NDIRECTION, NIDENT => NIDENT);
 | ||
|   end SELECT_FIN;
 | ||
| 
 | ||
|   /* Получение суммы входящего финансирования проекта */
 | ||
|   function GET_FIN_IN
 | ||
|   (
 | ||
|     NRN                     in number             -- Рег. номер проекта
 | ||
|   ) return                  number                -- Сумма входящего финансирования проекта
 | ||
|   is
 | ||
|     NRES                    PKG_STD.TNUMBER := 0; -- Буфер для результата
 | ||
|   begin
 | ||
|     /* Обходим этапы и считаем */
 | ||
|     for C in (select PS.RN from PROJECTSTAGE PS where PS.PRN = NRN)
 | ||
|     loop
 | ||
|       NRES := NRES + STAGES_GET_FIN_IN(NRN => C.RN);
 | ||
|     end loop;
 | ||
|     /* Возвращаем результат */
 | ||
|     return NRES;
 | ||
|   end GET_FIN_IN;
 | ||
| 
 | ||
|   /* Получение суммы исходящего финансирования проекта */
 | ||
|   function GET_FIN_OUT
 | ||
|   (
 | ||
|     NRN                     in number             -- Рег. номер проекта
 | ||
|   ) return                  number                -- Сумма исходяшего финансирования проекта
 | ||
|   is
 | ||
|     NRES                    PKG_STD.TNUMBER := 0; -- Буфер для результата
 | ||
|   begin
 | ||
|     /* Обходим этапы и считаем */
 | ||
|     for C in (select PS.RN from PROJECTSTAGE PS where PS.PRN = NRN)
 | ||
|     loop
 | ||
|       NRES := NRES + STAGES_GET_FIN_OUT(NRN => C.RN);
 | ||
|     end loop;
 | ||
|     /* Возвращаем результат */
 | ||
|     return NRES;
 | ||
|   end GET_FIN_OUT;
 | ||
| 
 | ||
|   /* Получение состояния финансирования проекта */
 | ||
|   function GET_CTRL_FIN
 | ||
|   (
 | ||
|     NRN                     in number            -- Рег. номер проекта
 | ||
|   ) return                  number               -- Состояние (null - не определено, 0 - без отклонений, 1 - есть отклонения)
 | ||
|   is
 | ||
|     NSTAGE_CTRL             PKG_STD.TNUMBER;     -- Состояние этапа
 | ||
|     NCNT_STAGES             PKG_STD.TNUMBER :=0; -- Количество этапов
 | ||
|     NCNT_NULL               PKG_STD.TNUMBER :=0; -- Количество "безконтрольных" этапов
 | ||
|   begin
 | ||
|     /* Обходим этапы */
 | ||
|     for C in (select PS.RN from PROJECTSTAGE PS where PS.PRN = NRN)
 | ||
|     loop
 | ||
|       /* Увеличим счётчик этапов */
 | ||
|       NCNT_STAGES := NCNT_STAGES + 1;
 | ||
|       /* Получим состояние этапа */
 | ||
|       NSTAGE_CTRL := STAGES_GET_CTRL_FIN(NRN => C.RN);
 | ||
|       /* Подсчитаем количество "безконтрольных" */
 | ||
|       if (NSTAGE_CTRL is null) then
 | ||
|         NCNT_NULL := NCNT_NULL + 1;
 | ||
|       end if;
 | ||
|       /* Если у этапа есть отклонение - оно есть и у проекта */
 | ||
|       if (NSTAGE_CTRL = 1) then
 | ||
|         return 1;
 | ||
|       end if;
 | ||
|     end loop;
 | ||
|     /* Если ни один этап не подлежит контролю - то и состояние проекта тоже */
 | ||
|     if (NCNT_NULL = NCNT_STAGES) then
 | ||
|       return null;
 | ||
|     end if;
 | ||
|     /* Если мы здесь - отклонений нет */
 | ||
|     if (NCNT_STAGES > 0) then
 | ||
|       return 0;
 | ||
|     else
 | ||
|       /* Нет этапов и нет контроля */
 | ||
|       return null;
 | ||
|     end if;
 | ||
|   end GET_CTRL_FIN;
 | ||
| 
 | ||
|   /* Получение состояния контрактации проекта */
 | ||
|   function GET_CTRL_CONTR
 | ||
|   (
 | ||
|     NRN                     in number            -- Рег. номер проекта
 | ||
|   ) return                  number               -- Состояние (null - не определено, 0 - без отклонений, 1 - есть отклонения)
 | ||
|   is
 | ||
|     NSTAGE_CTRL             PKG_STD.TNUMBER;     -- Состояние этапа
 | ||
|     NCNT_STAGES             PKG_STD.TNUMBER :=0; -- Количество этапов
 | ||
|     NCNT_NULL               PKG_STD.TNUMBER :=0; -- Количество "безконтрольных" этапов
 | ||
|   begin
 | ||
|     /* Обходим этапы */
 | ||
|     for C in (select PS.RN from PROJECTSTAGE PS where PS.PRN = NRN)
 | ||
|     loop
 | ||
|       /* Увеличим счётчик этапов */
 | ||
|       NCNT_STAGES := NCNT_STAGES + 1;
 | ||
|       /* Получим состояние этапа */
 | ||
|       NSTAGE_CTRL := STAGES_GET_CTRL_CONTR(NRN => C.RN);
 | ||
|       /* Подсчитаем количество "безконтрольных" */
 | ||
|       if (NSTAGE_CTRL is null) then
 | ||
|         NCNT_NULL := NCNT_NULL + 1;
 | ||
|       end if;
 | ||
|       /* Если у этапа есть отклонение - оно есть и у проекта */
 | ||
|       if (NSTAGE_CTRL = 1) then
 | ||
|         return 1;
 | ||
|       end if;
 | ||
|     end loop;
 | ||
|     /* Если ни один этап не подлежит контролю - то и состояние проекта тоже */
 | ||
|     if (NCNT_NULL = NCNT_STAGES) then
 | ||
|       return null;
 | ||
|     end if;
 | ||
|     /* Если мы здесь - отклонений нет */
 | ||
|     if (NCNT_STAGES > 0) then
 | ||
|       return 0;
 | ||
|     else
 | ||
|       /* Нет этапов и нет контроля */
 | ||
|       return null;
 | ||
|     end if;
 | ||
|   end GET_CTRL_CONTR;
 | ||
| 
 | ||
|   /* Получение состояния соисполнения проекта */
 | ||
|   function GET_CTRL_COEXEC
 | ||
|   (
 | ||
|     NRN                     in number            -- Рег. номер проекта
 | ||
|   ) return                  number               -- Состояние (null - не определено, 0 - без отклонений, 1 - есть отклонения)
 | ||
|   is
 | ||
|     NSTAGE_CTRL             PKG_STD.TNUMBER;     -- Состояние этапа
 | ||
|     NCNT_STAGES             PKG_STD.TNUMBER :=0; -- Количество этапов
 | ||
|     NCNT_NULL               PKG_STD.TNUMBER :=0; -- Количество "безконтрольных" этапов
 | ||
|   begin
 | ||
|     /* Обходим этапы */
 | ||
|     for C in (select PS.RN from PROJECTSTAGE PS where PS.PRN = NRN)
 | ||
|     loop
 | ||
|       /* Увеличим счётчик этапов */
 | ||
|       NCNT_STAGES := NCNT_STAGES + 1;
 | ||
|       /* Получим состояние этапа */
 | ||
|       NSTAGE_CTRL := STAGES_GET_CTRL_COEXEC(NRN => C.RN);
 | ||
|       /* Подсчитаем количество "безконтрольных" */
 | ||
|       if (NSTAGE_CTRL is null) then
 | ||
|         NCNT_NULL := NCNT_NULL + 1;
 | ||
|       end if;
 | ||
|       /* Если у этапа есть отклонение - оно есть и у проекта */
 | ||
|       if (NSTAGE_CTRL = 1) then
 | ||
|         return 1;
 | ||
|       end if;
 | ||
|     end loop;
 | ||
|     /* Если ни один этап не подлежит контролю - то и состояние проекта тоже */
 | ||
|     if (NCNT_NULL = NCNT_STAGES) then
 | ||
|       return null;
 | ||
|     end if;
 | ||
|     /* Если мы здесь - отклонений нет */
 | ||
|     if (NCNT_STAGES > 0) then
 | ||
|       return 0;
 | ||
|     else
 | ||
|       /* Нет этапов и нет контроля */
 | ||
|       return null;
 | ||
|     end if;
 | ||
|   end GET_CTRL_COEXEC;
 | ||
| 
 | ||
|   /* Получение состояния сроков проекта */
 | ||
|   function GET_CTRL_PERIOD
 | ||
|   (
 | ||
|     NRN                     in number            -- Рег. номер проекта
 | ||
|   ) return                  number               -- Состояние (null - не определено, 0 - без отклонений, 1 - есть отклонения)
 | ||
|   is
 | ||
|     NSTAGE_CTRL             PKG_STD.TNUMBER;     -- Состояние этапа
 | ||
|     NCNT_STAGES             PKG_STD.TNUMBER :=0; -- Количество этапов
 | ||
|     NCNT_NULL               PKG_STD.TNUMBER :=0; -- Количество "безконтрольных" этапов
 | ||
|   begin
 | ||
|     /* Обходим этапы */
 | ||
|     for C in (select PS.RN from PROJECTSTAGE PS where PS.PRN = NRN)
 | ||
|     loop
 | ||
|       /* Увеличим счётчик этапов */
 | ||
|       NCNT_STAGES := NCNT_STAGES + 1;
 | ||
|       /* Получим состояние этапа */
 | ||
|       NSTAGE_CTRL := STAGES_GET_CTRL_PERIOD(NRN => C.RN);
 | ||
|       /* Подсчитаем количество "безконтрольных" */
 | ||
|       if (NSTAGE_CTRL is null) then
 | ||
|         NCNT_NULL := NCNT_NULL + 1;
 | ||
|       end if;
 | ||
|       /* Если у этапа есть отклонение - оно есть и у проекта */
 | ||
|       if (NSTAGE_CTRL = 1) then
 | ||
|         return 1;
 | ||
|       end if;
 | ||
|     end loop;
 | ||
|     /* Если ни один этап не подлежит контролю - то и состояние проекта тоже */
 | ||
|     if (NCNT_NULL = NCNT_STAGES) then
 | ||
|       return null;
 | ||
|     end if;
 | ||
|     /* Если мы здесь - отклонений нет */
 | ||
|     if (NCNT_STAGES > 0) then
 | ||
|       return 0;
 | ||
|     else
 | ||
|       /* Нет этапов и нет контроля */
 | ||
|       return null;
 | ||
|     end if;
 | ||
|   end GET_CTRL_PERIOD;
 | ||
|   
 | ||
|   /* Получение состояния затрат проекта */
 | ||
|   function GET_CTRL_COST
 | ||
|   (
 | ||
|     NRN                     in number            -- Рег. номер проекта
 | ||
|   ) return                  number               -- Состояние (null - не определено, 0 - без отклонений, 1 - есть отклонения)
 | ||
|   is
 | ||
|     NSTAGE_CTRL             PKG_STD.TNUMBER;     -- Состояние этапа
 | ||
|     NCNT_STAGES             PKG_STD.TNUMBER :=0; -- Количество этапов
 | ||
|     NCNT_NULL               PKG_STD.TNUMBER :=0; -- Количество "безконтрольных" этапов
 | ||
|   begin
 | ||
|     /* Обходим этапы */
 | ||
|     for C in (select PS.RN from PROJECTSTAGE PS where PS.PRN = NRN)
 | ||
|     loop
 | ||
|       /* Увеличим счётчик этапов */
 | ||
|       NCNT_STAGES := NCNT_STAGES + 1;
 | ||
|       /* Получим состояние этапа */
 | ||
|       NSTAGE_CTRL := STAGES_GET_CTRL_COST(NRN => C.RN);
 | ||
|       /* Подсчитаем количество "безконтрольных" */
 | ||
|       if (NSTAGE_CTRL is null) then
 | ||
|         NCNT_NULL := NCNT_NULL + 1;
 | ||
|       end if;
 | ||
|       /* Если у этапа есть отклонение - оно есть и у проекта */
 | ||
|       if (NSTAGE_CTRL = 1) then
 | ||
|         return 1;
 | ||
|       end if;
 | ||
|     end loop;
 | ||
|     /* Если ни один этап не подлежит контролю - то и состояние проекта тоже */
 | ||
|     if (NCNT_NULL = NCNT_STAGES) then
 | ||
|       return null;
 | ||
|     end if;
 | ||
|     /* Если мы здесь - отклонений нет */
 | ||
|     if (NCNT_STAGES > 0) then
 | ||
|       return 0;
 | ||
|     else
 | ||
|       /* Нет этапов и нет контроля */
 | ||
|       return null;
 | ||
|     end if;
 | ||
|   end GET_CTRL_COST;
 | ||
|   
 | ||
|   /* Получение состояния актирования проекта */
 | ||
|   function GET_CTRL_ACT
 | ||
|   (
 | ||
|     NRN                     in number            -- Рег. номер проекта
 | ||
|   ) return                  number               -- Состояние (null - не определено, 0 - без отклонений, 1 - есть отклонения)
 | ||
|   is
 | ||
|     NSTAGE_CTRL             PKG_STD.TNUMBER;     -- Состояние этапа
 | ||
|     NCNT_STAGES             PKG_STD.TNUMBER :=0; -- Количество этапов
 | ||
|     NCNT_NULL               PKG_STD.TNUMBER :=0; -- Количество "безконтрольных" этапов
 | ||
|   begin
 | ||
|     /* Обходим этапы */
 | ||
|     for C in (select PS.RN from PROJECTSTAGE PS where PS.PRN = NRN)
 | ||
|     loop
 | ||
|       /* Увеличим счётчик этапов */
 | ||
|       NCNT_STAGES := NCNT_STAGES + 1;
 | ||
|       /* Получим состояние этапа */
 | ||
|       NSTAGE_CTRL := STAGES_GET_CTRL_ACT(NRN => C.RN);
 | ||
|       /* Подсчитаем количество "безконтрольных" */
 | ||
|       if (NSTAGE_CTRL is null) then
 | ||
|         NCNT_NULL := NCNT_NULL + 1;
 | ||
|       end if;
 | ||
|       /* Если у этапа есть отклонение - оно есть и у проекта */
 | ||
|       if (NSTAGE_CTRL = 1) then
 | ||
|         return 1;
 | ||
|       end if;
 | ||
|     end loop;
 | ||
|     /* Если ни один этап не подлежит контролю - то и состояние проекта тоже */
 | ||
|     if (NCNT_NULL = NCNT_STAGES) then
 | ||
|       return null;
 | ||
|     end if;
 | ||
|     /* Если мы здесь - отклонений нет */
 | ||
|     if (NCNT_STAGES > 0) then
 | ||
|       return 0;
 | ||
|     else
 | ||
|       /* Нет этапов и нет контроля */
 | ||
|       return null;
 | ||
|     end if;
 | ||
|   end GET_CTRL_ACT;
 | ||
|   
 | ||
|   /* Получение % готовности проекта (по затратам) */
 | ||
|   function GET_COST_READY
 | ||
|   (
 | ||
|     NRN                     in number             -- Рег. номер проекта
 | ||
|   ) return                  number                -- % готовности
 | ||
|   is
 | ||
|     RP                      PROJECT%rowtype;      -- Запись проекта
 | ||
|     NFPDARTCL_SELF_COST     PKG_STD.TREF;         -- Рег. номер статьи себестоимости
 | ||
|     NCOST_FACT              PKG_STD.TNUMBER := 0; -- Сумма фактических затрат по проекту
 | ||
|     NSELF_COST_PLAN         PKG_STD.TNUMBER := 0; -- Плановая себестоимость проекта
 | ||
|     RSTG_SELF_COST_PLAN     TSTAGE_ARTS;          -- Плановая себестоимость этапа
 | ||
|     NRES                    PKG_STD.TNUMBER := 0; -- Буфер для результата
 | ||
|   begin
 | ||
|     /* Читаем проект */
 | ||
|     RP := GET(NRN => NRN);
 | ||
|     /* Определим рег. номер статьи калькуляции для учёта себестоимости */
 | ||
|     FIND_FPDARTCL_CODE(NFLAG_SMART => 1,
 | ||
|                        NCOMPANY    => RP.COMPANY,
 | ||
|                        SCODE       => SFPDARTCL_SELF_COST,
 | ||
|                        NRN         => NFPDARTCL_SELF_COST);
 | ||
|     /* Обходим этапы */
 | ||
|     for C in (select PS.RN from PROJECTSTAGE PS where PS.PRN = RP.RN)
 | ||
|     loop
 | ||
|       /* Накапливаем сумму фактических затрат */
 | ||
|       NCOST_FACT := NCOST_FACT + STAGES_GET_COST_FACT(NRN => C.RN);
 | ||
|       /* Накапливаем плановую себестоимость */
 | ||
|       STAGE_ARTS_GET(NSTAGE => C.RN, NFPDARTCL => NFPDARTCL_SELF_COST, RSTAGE_ARTS => RSTG_SELF_COST_PLAN);
 | ||
|       if ((RSTG_SELF_COST_PLAN.COUNT = 1) and (RSTG_SELF_COST_PLAN(RSTG_SELF_COST_PLAN.LAST).NPLAN <> 0)) then
 | ||
|         NSELF_COST_PLAN := NSELF_COST_PLAN + RSTG_SELF_COST_PLAN(RSTG_SELF_COST_PLAN.LAST).NPLAN;
 | ||
|       end if;
 | ||
|     end loop;
 | ||
|     /* Если есть и фактические затраты и плановая себестоимость */
 | ||
|     if ((NCOST_FACT > 0) and (NSELF_COST_PLAN > 0)) then
 | ||
|       /* Отношение фактических затрат к плановой себестоимость - искомый % готовности */
 | ||
|       NRES := ROUND(NCOST_FACT / NSELF_COST_PLAN * 100, 0);
 | ||
|       /* Если затраты превысили себестоимость, то % может быть > 100, но это бессмысленно, откорректируем ситуацию */
 | ||
|       if (NRES > 100) then
 | ||
|         NRES := 100;
 | ||
|       end if;
 | ||
|     end if;
 | ||
|     /* Вернём рассчитанное */
 | ||
|     return NRES;
 | ||
|   end GET_COST_READY;
 | ||
|   
 | ||
|   /* Список проектов */
 | ||
|   procedure LIST
 | ||
|   (
 | ||
|     NPAGE_NUMBER            in number,                             -- Номер страницы (игнорируется при NPAGE_SIZE=0)
 | ||
|     NPAGE_SIZE              in number,                             -- Количество записей на странице (0 - все)
 | ||
|     CFILTERS                in clob,                               -- Фильтры
 | ||
|     CORDERS                 in clob,                               -- Сортировки
 | ||
|     NINCLUDE_DEF            in number,                             -- Признак включения описания колонок таблицы в ответ
 | ||
|     COUT                    out clob                               -- Сериализованная таблица данных
 | ||
|   )
 | ||
|   is
 | ||
|     NCOMPANY                PKG_STD.TREF := GET_SESSION_COMPANY(); -- Организация сеанса
 | ||
|     NIDENT                  PKG_STD.TREF := GEN_IDENT();           -- Идентификатор отбора
 | ||
|     RF                      PKG_P8PANELS_VISUAL.TFILTERS;          -- Фильтры
 | ||
|     RO                      PKG_P8PANELS_VISUAL.TORDERS;           -- Сортировки
 | ||
|     RDG                     PKG_P8PANELS_VISUAL.TDATA_GRID;        -- Описание таблицы
 | ||
|     RDG_ROW                 PKG_P8PANELS_VISUAL.TROW;              -- Строка таблицы
 | ||
|     RCOL_VALS               PKG_P8PANELS_VISUAL.TCOL_VALS;         -- Предопределённые значения столбцов
 | ||
|     NROW_FROM               PKG_STD.TREF;                          -- Номер строки с
 | ||
|     NROW_TO                 PKG_STD.TREF;                          -- Номер строки по
 | ||
|     CSQL                    clob;                                  -- Буфер для запроса
 | ||
|     ICURSOR                 integer;                               -- Курсор для исполнения запроса
 | ||
|     NECON_RESP_DP           PKG_STD.TREF;                          -- Рег. номер ДС "Ответственный экономист"
 | ||
|   begin
 | ||
|     /* Читаем фильтры */
 | ||
|     RF := PKG_P8PANELS_VISUAL.TFILTERS_FROM_XML(CFILTERS => CFILTERS);
 | ||
|     /* Читем сортировки */
 | ||
|     RO := PKG_P8PANELS_VISUAL.TORDERS_FROM_XML(CORDERS => CORDERS);
 | ||
|     /* Преобразуем номер и размер страницы в номер строк с и по */
 | ||
|     PKG_P8PANELS_VISUAL.UTL_ROWS_LIMITS_CALC(NPAGE_NUMBER => NPAGE_NUMBER,
 | ||
|                                              NPAGE_SIZE   => NPAGE_SIZE,
 | ||
|                                              NROW_FROM    => NROW_FROM,
 | ||
|                                              NROW_TO      => NROW_TO);
 | ||
|     /* Инициализируем таблицу данных */
 | ||
|     RDG := PKG_P8PANELS_VISUAL.TDATA_GRID_MAKE();
 | ||
|     /* Добавляем в таблицу описание колонок */
 | ||
|     PKG_P8PANELS_VISUAL.TDATA_GRID_ADD_COL_DEF(RDATA_GRID => RDG,
 | ||
|                                                SNAME      => 'NRN',
 | ||
|                                                SCAPTION   => 'Рег. номер',
 | ||
|                                                SDATA_TYPE => PKG_P8PANELS_VISUAL.SDATA_TYPE_NUMB,
 | ||
|                                                BVISIBLE   => false);
 | ||
|     PKG_P8PANELS_VISUAL.TDATA_GRID_ADD_COL_DEF(RDATA_GRID => RDG,
 | ||
|                                                SNAME      => 'SCODE',
 | ||
|                                                SCAPTION   => 'Код',
 | ||
|                                                SDATA_TYPE => PKG_P8PANELS_VISUAL.SDATA_TYPE_STR,
 | ||
|                                                SCOND_FROM => 'EDMNEMO',
 | ||
|                                                BORDER     => true,
 | ||
|                                                BFILTER    => true);
 | ||
|     PKG_P8PANELS_VISUAL.TDATA_GRID_ADD_COL_DEF(RDATA_GRID => RDG,
 | ||
|                                                SNAME      => 'SNAME',
 | ||
|                                                SCAPTION   => 'Наименование',
 | ||
|                                                SDATA_TYPE => PKG_P8PANELS_VISUAL.SDATA_TYPE_STR,
 | ||
|                                                SCOND_FROM => 'EDNAME',
 | ||
|                                                BVISIBLE   => false);
 | ||
|     PKG_P8PANELS_VISUAL.TDATA_GRID_ADD_COL_DEF(RDATA_GRID => RDG,
 | ||
|                                                SNAME      => 'SNAME_USL',
 | ||
|                                                SCAPTION   => 'Условное наименование',
 | ||
|                                                SDATA_TYPE => PKG_P8PANELS_VISUAL.SDATA_TYPE_STR,
 | ||
|                                                SCOND_FROM => 'EDNAME_USL',
 | ||
|                                                BORDER     => true,
 | ||
|                                                BFILTER    => true);
 | ||
|     PKG_P8PANELS_VISUAL.TDATA_GRID_ADD_COL_DEF(RDATA_GRID => RDG,
 | ||
|                                                SNAME      => 'SEXPECTED_RES',
 | ||
|                                                SCAPTION   => 'Ожидаемые результаты',
 | ||
|                                                SDATA_TYPE => PKG_P8PANELS_VISUAL.SDATA_TYPE_STR,
 | ||
|                                                BVISIBLE   => false);
 | ||
|     PKG_P8PANELS_VISUAL.TDATA_GRID_ADD_COL_DEF(RDATA_GRID => RDG,
 | ||
|                                                SNAME      => 'SPRJTYPE',
 | ||
|                                                SCAPTION   => 'Тип',
 | ||
|                                                SDATA_TYPE => PKG_P8PANELS_VISUAL.SDATA_TYPE_STR,
 | ||
|                                                SCOND_FROM => 'EDPROJECTTYPE',
 | ||
|                                                BVISIBLE   => false);
 | ||
|     PKG_P8PANELS_VISUAL.TDATA_GRID_ADD_COL_DEF(RDATA_GRID => RDG,
 | ||
|                                                SNAME      => 'SEXT_CUST',
 | ||
|                                                SCAPTION   => 'Заказчик',
 | ||
|                                                SDATA_TYPE => PKG_P8PANELS_VISUAL.SDATA_TYPE_STR,
 | ||
|                                                SCOND_FROM => 'EDEXT_CUST',
 | ||
|                                                BORDER     => true,
 | ||
|                                                BFILTER    => true);
 | ||
|     PKG_P8PANELS_VISUAL.TDATA_GRID_ADD_COL_DEF(RDATA_GRID => RDG,
 | ||
|                                                SNAME      => 'SGOVCNTRID',
 | ||
|                                                SCAPTION   => 'ИГК',
 | ||
|                                                SDATA_TYPE => PKG_P8PANELS_VISUAL.SDATA_TYPE_STR,
 | ||
|                                                BVISIBLE   => false);
 | ||
|     PKG_P8PANELS_VISUAL.TDATA_GRID_ADD_COL_DEF(RDATA_GRID => RDG,
 | ||
|                                                SNAME      => 'SDOC_OSN',
 | ||
|                                                SCAPTION   => 'Документ-основание',
 | ||
|                                                SDATA_TYPE => PKG_P8PANELS_VISUAL.SDATA_TYPE_STR,
 | ||
|                                                BVISIBLE   => false);
 | ||
|     PKG_P8PANELS_VISUAL.TDATA_GRID_ADD_COL_DEF(RDATA_GRID => RDG,
 | ||
|                                                SNAME      => 'SLNK_UNIT_SDOC_OSN',
 | ||
|                                                SCAPTION   => 'Документ-основание (код раздела ссылки)',
 | ||
|                                                SDATA_TYPE => PKG_P8PANELS_VISUAL.SDATA_TYPE_STR,
 | ||
|                                                BVISIBLE   => false);
 | ||
|     PKG_P8PANELS_VISUAL.TDATA_GRID_ADD_COL_DEF(RDATA_GRID => RDG,
 | ||
|                                                SNAME      => 'NLNK_DOCUMENT_SDOC_OSN',
 | ||
|                                                SCAPTION   => 'Документ-основание (документ ссылки)',
 | ||
|                                                SDATA_TYPE => PKG_P8PANELS_VISUAL.SDATA_TYPE_NUMB,
 | ||
|                                                BVISIBLE   => false);
 | ||
|     PKG_P8PANELS_VISUAL.TDATA_GRID_ADD_COL_DEF(RDATA_GRID => RDG,
 | ||
|                                                SNAME      => 'SSUBDIV_RESP',
 | ||
|                                                SCAPTION   => 'Подразделение-исполнитель',
 | ||
|                                                SDATA_TYPE => PKG_P8PANELS_VISUAL.SDATA_TYPE_STR,
 | ||
|                                                BVISIBLE   => false);
 | ||
|     PKG_P8PANELS_VISUAL.TDATA_GRID_ADD_COL_DEF(RDATA_GRID => RDG,
 | ||
|                                                SNAME      => 'SRESPONSIBLE',
 | ||
|                                                SCAPTION   => 'Ответственный исполнитель',
 | ||
|                                                SDATA_TYPE => PKG_P8PANELS_VISUAL.SDATA_TYPE_STR,
 | ||
|                                                BVISIBLE   => false);
 | ||
|     PKG_P8PANELS_VISUAL.TDATA_GRID_ADD_COL_DEF(RDATA_GRID => RDG,
 | ||
|                                                SNAME      => 'SECON_RESP',
 | ||
|                                                SCAPTION   => 'Ответственный экономист',
 | ||
|                                                SDATA_TYPE => PKG_P8PANELS_VISUAL.SDATA_TYPE_STR,
 | ||
|                                                BVISIBLE   => false);
 | ||
|     PKG_P8PANELS_VISUAL.TCOL_VALS_ADD(RCOL_VALS => RCOL_VALS, NVALUE => 0, BCLEAR => true);
 | ||
|     PKG_P8PANELS_VISUAL.TCOL_VALS_ADD(RCOL_VALS => RCOL_VALS, NVALUE => 1);
 | ||
|     PKG_P8PANELS_VISUAL.TCOL_VALS_ADD(RCOL_VALS => RCOL_VALS, NVALUE => 2);
 | ||
|     PKG_P8PANELS_VISUAL.TCOL_VALS_ADD(RCOL_VALS => RCOL_VALS, NVALUE => 3);
 | ||
|     PKG_P8PANELS_VISUAL.TCOL_VALS_ADD(RCOL_VALS => RCOL_VALS, NVALUE => 4);
 | ||
|     PKG_P8PANELS_VISUAL.TCOL_VALS_ADD(RCOL_VALS => RCOL_VALS, NVALUE => 5);
 | ||
|     PKG_P8PANELS_VISUAL.TDATA_GRID_ADD_COL_DEF(RDATA_GRID => RDG,
 | ||
|                                                SNAME      => 'NSTATE',
 | ||
|                                                SCAPTION   => 'Состояние',
 | ||
|                                                SDATA_TYPE => PKG_P8PANELS_VISUAL.SDATA_TYPE_NUMB,
 | ||
|                                                SCOND_FROM => 'CGSTATE',
 | ||
|                                                BORDER     => true,
 | ||
|                                                BFILTER    => true,
 | ||
|                                                RCOL_VALS  => RCOL_VALS);
 | ||
|     PKG_P8PANELS_VISUAL.TDATA_GRID_ADD_COL_DEF(RDATA_GRID => RDG,
 | ||
|                                                SNAME      => 'DBEGPLAN',
 | ||
|                                                SCAPTION   => 'Дата начала',
 | ||
|                                                SDATA_TYPE => PKG_P8PANELS_VISUAL.SDATA_TYPE_DATE,
 | ||
|                                                SCOND_FROM => 'EDPLANBEGFrom',
 | ||
|                                                SCOND_TO   => 'EDPLANBEGTo',
 | ||
|                                                BORDER     => true,
 | ||
|                                                BFILTER    => true);
 | ||
|     PKG_P8PANELS_VISUAL.TDATA_GRID_ADD_COL_DEF(RDATA_GRID => RDG,
 | ||
|                                                SNAME      => 'DENDPLAN',
 | ||
|                                                SCAPTION   => 'Дата окончания',
 | ||
|                                                SDATA_TYPE => PKG_P8PANELS_VISUAL.SDATA_TYPE_DATE,
 | ||
|                                                SCOND_FROM => 'EDPLANENDFrom',
 | ||
|                                                SCOND_TO   => 'EDPLANENDTo',
 | ||
|                                                BORDER     => true,
 | ||
|                                                BFILTER    => true);
 | ||
|     PKG_P8PANELS_VISUAL.TDATA_GRID_ADD_COL_DEF(RDATA_GRID => RDG,
 | ||
|                                                SNAME      => 'NCOST_SUM',
 | ||
|                                                SCAPTION   => 'Стоимость',
 | ||
|                                                SDATA_TYPE => PKG_P8PANELS_VISUAL.SDATA_TYPE_NUMB,
 | ||
|                                                BVISIBLE   => false);
 | ||
|     PKG_P8PANELS_VISUAL.TDATA_GRID_ADD_COL_DEF(RDATA_GRID => RDG,
 | ||
|                                                SNAME      => 'SCURNAMES',
 | ||
|                                                SCAPTION   => 'Валюта',
 | ||
|                                                SDATA_TYPE => PKG_P8PANELS_VISUAL.SDATA_TYPE_STR,
 | ||
|                                                BVISIBLE   => false);
 | ||
|     PKG_P8PANELS_VISUAL.TDATA_GRID_ADD_COL_DEF(RDATA_GRID => RDG,
 | ||
|                                                SNAME      => 'NFIN_IN',
 | ||
|                                                SCAPTION   => 'Входящее финансирование',
 | ||
|                                                SDATA_TYPE => PKG_P8PANELS_VISUAL.SDATA_TYPE_NUMB,
 | ||
|                                                BVISIBLE   => false);
 | ||
|     PKG_P8PANELS_VISUAL.TDATA_GRID_ADD_COL_DEF(RDATA_GRID => RDG,
 | ||
|                                                SNAME      => 'SLNK_UNIT_NFIN_IN',
 | ||
|                                                SCAPTION   => 'Входящее финансирование (код раздела ссылки)',
 | ||
|                                                SDATA_TYPE => PKG_P8PANELS_VISUAL.SDATA_TYPE_STR,
 | ||
|                                                BVISIBLE   => false);
 | ||
|     PKG_P8PANELS_VISUAL.TDATA_GRID_ADD_COL_DEF(RDATA_GRID => RDG,
 | ||
|                                                SNAME      => 'NLNK_DOCUMENT_NFIN_IN',
 | ||
|                                                SCAPTION   => 'Входящее финансирование (документ ссылки)',
 | ||
|                                                SDATA_TYPE => PKG_P8PANELS_VISUAL.SDATA_TYPE_NUMB,
 | ||
|                                                BVISIBLE   => false);
 | ||
|     PKG_P8PANELS_VISUAL.TDATA_GRID_ADD_COL_DEF(RDATA_GRID => RDG,
 | ||
|                                                SNAME      => 'NFIN_OUT',
 | ||
|                                                SCAPTION   => 'Исходящее финансирование',
 | ||
|                                                SDATA_TYPE => PKG_P8PANELS_VISUAL.SDATA_TYPE_NUMB,
 | ||
|                                                BVISIBLE   => false);
 | ||
|     PKG_P8PANELS_VISUAL.TDATA_GRID_ADD_COL_DEF(RDATA_GRID => RDG,
 | ||
|                                                SNAME      => 'SLNK_UNIT_NFIN_OUT',
 | ||
|                                                SCAPTION   => 'Исходящее финансирование (код раздела ссылки)',
 | ||
|                                                SDATA_TYPE => PKG_P8PANELS_VISUAL.SDATA_TYPE_STR,
 | ||
|                                                BVISIBLE   => false);
 | ||
|     PKG_P8PANELS_VISUAL.TDATA_GRID_ADD_COL_DEF(RDATA_GRID => RDG,
 | ||
|                                                SNAME      => 'NLNK_DOCUMENT_NFIN_OUT',
 | ||
|                                                SCAPTION   => 'Исходящее финансирование (документ ссылки)',
 | ||
|                                                SDATA_TYPE => PKG_P8PANELS_VISUAL.SDATA_TYPE_NUMB,
 | ||
|                                                BVISIBLE   => false);
 | ||
|     PKG_P8PANELS_VISUAL.TCOL_VALS_ADD(RCOL_VALS => RCOL_VALS, NVALUE => 0, BCLEAR => true);
 | ||
|     PKG_P8PANELS_VISUAL.TCOL_VALS_ADD(RCOL_VALS => RCOL_VALS, NVALUE => 1);
 | ||
|     PKG_P8PANELS_VISUAL.TDATA_GRID_ADD_COL_DEF(RDATA_GRID => RDG,
 | ||
|                                                SNAME      => 'NCTRL_FIN',
 | ||
|                                                SCAPTION   => 'Фин-е (исх.)',
 | ||
|                                                SDATA_TYPE => PKG_P8PANELS_VISUAL.SDATA_TYPE_NUMB,
 | ||
|                                                SCOND_FROM => 'EDCTRL_FIN',
 | ||
|                                                BORDER     => true,
 | ||
|                                                BFILTER    => true,
 | ||
|                                                RCOL_VALS  => RCOL_VALS,
 | ||
|                                                SHINT      => '<b>Финансирование (исходящее)</b> - контроль оплаты счетов, выставленных соисполнителями в рамках проекта.<br>' ||
 | ||
|                                                              '<b style="color:red">Требует внимания</b> - в проекте есть этапы, для которых не все выставленные соисполнителями счета оплачены.<br>' ||
 | ||
|                                                              '<b style="color:green">В норме</b> - нет этапов с отклонениями, описанными выше.<br>' ||
 | ||
|                                                              '<b style="color:gray">Пусто</b> - в Системе не хватает данных для рассчёта. Убедитесь, что для этапов задана привязка к договорам с соисполнителями.');
 | ||
|     PKG_P8PANELS_VISUAL.TDATA_GRID_ADD_COL_DEF(RDATA_GRID => RDG,
 | ||
|                                                SNAME      => 'NCTRL_CONTR',
 | ||
|                                                SCAPTION   => 'Контр-я',
 | ||
|                                                SDATA_TYPE => PKG_P8PANELS_VISUAL.SDATA_TYPE_NUMB,
 | ||
|                                                SCOND_FROM => 'EDCTRL_CONTR',
 | ||
|                                                BORDER     => true,
 | ||
|                                                BFILTER    => true,
 | ||
|                                                RCOL_VALS  => RCOL_VALS,
 | ||
|                                                SHINT      => '<b>Контрактация</b> - контроль суммы договоров, заключеных с соисполнителями в рамках проекта.<br>' ||
 | ||
|                                                              '<b style="color:red">Требует внимания</b> - в проекте есть этапы, для которых сумма договоров с соисполнителями превышает заложенные в калькуляцию плановые показатели.<br>' ||
 | ||
|                                                              '<b style="color:green">В норме</b> - нет этапов с отклонениями, описанными выше.<br>' ||
 | ||
|                                                              '<b style="color:gray">Пусто</b> - в Системе не хватает данных для рассчёта. Убедитесь, что для всех этапов заданы плановые калькуляции.');
 | ||
|     PKG_P8PANELS_VISUAL.TDATA_GRID_ADD_COL_DEF(RDATA_GRID => RDG,
 | ||
|                                                SNAME      => 'NCTRL_COEXEC',
 | ||
|                                                SCAPTION   => 'Соисп-е',
 | ||
|                                                SDATA_TYPE => PKG_P8PANELS_VISUAL.SDATA_TYPE_NUMB,
 | ||
|                                                SCOND_FROM => 'EDCTRL_COEXEC',
 | ||
|                                                BORDER     => true,
 | ||
|                                                BFILTER    => true,
 | ||
|                                                RCOL_VALS  => RCOL_VALS,
 | ||
|                                                SHINT      => '<b>Соисполнение</b> - контроль исполнения обязательств по договорам, заключеным с соисполнителями в рамках проекта.<br>' ||
 | ||
|                                                              '<b style="color:red">Требует внимания</b> - в проекте есть этапы, до окончания которых осталось менее ' || TO_CHAR(NDAYS_LEFT_LIMIT) ||
 | ||
|                                                              ' дней, при этом зафиксирован положительный остаток к поставке/актированию по договорам соисполнителей данного этапа.<br>' ||
 | ||
|                                                              '<b style="color:green">В норме</b> - нет этапов с отклонениями, описанными выше.<br>' ||
 | ||
|                                                              '<b style="color:gray">Пусто</b> - в Системе не хватает данных для рассчёта. Убедитесь, что для этапов задана привязка к договорам с соисполнителями и плановые сроки окончания.');
 | ||
|     PKG_P8PANELS_VISUAL.TDATA_GRID_ADD_COL_DEF(RDATA_GRID => RDG,
 | ||
|                                                SNAME      => 'NCTRL_PERIOD',
 | ||
|                                                SCAPTION   => 'Сроки',
 | ||
|                                                SDATA_TYPE => PKG_P8PANELS_VISUAL.SDATA_TYPE_NUMB,
 | ||
|                                                SCOND_FROM => 'EDCTRL_PERIOD',
 | ||
|                                                BORDER     => true,
 | ||
|                                                BFILTER    => true,
 | ||
|                                                RCOL_VALS  => RCOL_VALS,
 | ||
|                                                SHINT      => '<b>Сроки</b> - контроль сроков исполнения работ по проекту.<br>' ||
 | ||
|                                                              '<b style="color:red">Требует внимания</b> - в проекте есть этапы, до окончания которых осталось менее ' || TO_CHAR(NDAYS_LEFT_LIMIT) || ' дней.<br>' ||
 | ||
|                                                              '<b style="color:green">В норме</b> - нет этапов с отклонениями, описанными выше.<br>' ||
 | ||
|                                                              '<b style="color:gray">Пусто</b> - в Системе не хватает данных для рассчёта. Убедитесь, что для этапов заданы плановые сроки окончания.');
 | ||
|     PKG_P8PANELS_VISUAL.TDATA_GRID_ADD_COL_DEF(RDATA_GRID => RDG,
 | ||
|                                                SNAME      => 'NCTRL_COST',
 | ||
|                                                SCAPTION   => 'Затраты',
 | ||
|                                                SDATA_TYPE => PKG_P8PANELS_VISUAL.SDATA_TYPE_NUMB,
 | ||
|                                                SCOND_FROM => 'EDCTRL_COST',
 | ||
|                                                BORDER     => true,
 | ||
|                                                BFILTER    => true,
 | ||
|                                                RCOL_VALS  => RCOL_VALS,
 | ||
|                                                SHINT      => '<b>Затраты</b> - контроль затрат, понесённых в ходе выполнения работ по проекту.<br>' ||
 | ||
|                                                              '<b style="color:red">Требует внимания</b> - в проекте есть этапы, для которых сумма фактических затрат по статьям калькуляции превысила плановую.<br>' ||
 | ||
|                                                              '<b style="color:green">В норме</b> - нет этапов с отклонениями, описанными выше.<br>' ||
 | ||
|                                                              '<b style="color:gray">Пусто</b> - в Системе не хватает данных для рассчёта. Убедитесь, что для этапов задана действующая калькуляция с указанием плановых значений по статьям, подлежащим контролю.');
 | ||
|     PKG_P8PANELS_VISUAL.TDATA_GRID_ADD_COL_DEF(RDATA_GRID => RDG,
 | ||
|                                                SNAME      => 'NCTRL_ACT',
 | ||
|                                                SCAPTION   => 'Актир-е',
 | ||
|                                                SDATA_TYPE => PKG_P8PANELS_VISUAL.SDATA_TYPE_NUMB,
 | ||
|                                                SCOND_FROM => 'EDCTRL_ACT',
 | ||
|                                                BORDER     => true,
 | ||
|                                                BFILTER    => true,
 | ||
|                                                RCOL_VALS  => RCOL_VALS,
 | ||
|                                                SHINT      => '<b>Актирование</b> - контроль актирования работ, выполненных по проекту, со стороны заказчика.<br>' ||
 | ||
|                                                              '<b style="color:red">Требует внимания</b> - в проекте есть этапы, в состоянии "Закрыт", но при этом в Системе отсутствует утверждённая "Расходная накладная на отпуск потребителю" для данного этапа.<br>' ||
 | ||
|                                                              '<b style="color:green">В норме</b> - нет этапов с отклонениями, описанными выше.<br>' ||
 | ||
|                                                              '<b style="color:gray">Пусто</b> - в Системе не хватает данных для рассчёта. Убедитесь, что этапы, по которым завершены работы, переведены в состояние "Закрыт".');
 | ||
|     PKG_P8PANELS_VISUAL.TDATA_GRID_ADD_COL_DEF(RDATA_GRID => RDG,
 | ||
|                                                SNAME      => 'NCOST_READY',
 | ||
|                                                SCAPTION   => 'Готов (%, затраты)',
 | ||
|                                                SDATA_TYPE => PKG_P8PANELS_VISUAL.SDATA_TYPE_NUMB,
 | ||
|                                                SCOND_FROM => 'EDCOST_READYFrom',
 | ||
|                                                SCOND_TO   => 'EDCOST_READYTo',                                               
 | ||
|                                                BORDER     => true,
 | ||
|                                                BFILTER    => true);                                               
 | ||
|     /* Определим дополнительные свойства - ответственный экономист */
 | ||
|     FIND_DOCS_PROPS_CODE(NFLAG_SMART => 1, NCOMPANY => NCOMPANY, SCODE => SDP_SECON_RESP, NRN => NECON_RESP_DP);
 | ||
|     /* Обходим данные */
 | ||
|     begin
 | ||
|       /* Собираем запрос */
 | ||
|       CSQL := 'select *
 | ||
|             from (select D.*,
 | ||
|                          ROWNUM NROW
 | ||
|                     from (select P.RN NRN,
 | ||
|                                  P.CODE SCODE,
 | ||
|                                  P.NAME SNAME,
 | ||
|                                  P.NAME_USL SNAME_USL,
 | ||
|                                  P.EXPECTED_RES SEXPECTED_RES,
 | ||
|                                  PT.CODE SPRJTYPE,
 | ||
|                                  EC.AGNABBR SEXT_CUST,
 | ||
|                                  GC.CODE SGOVCNTRID,
 | ||
|                                  P.DOC_OSN SDOC_OSN,
 | ||
|                                  ''Contracts'' SLNK_UNIT_SDOC_OSN,
 | ||
|                                  PKG_P8PANELS_PROJECTS.GET_DOC_OSN_LNK_DOCUMENT(P.RN) NLNK_DOCUMENT_SDOC_OSN,
 | ||
|                                  SR.CODE SSUBDIV_RESP,
 | ||
|                                  R.AGNABBR SRESPONSIBLE,
 | ||
|                                  F_DOCS_PROPS_GET_STR_VALUE(:NECON_RESP_DP, ''Projects'', P.RN) SECON_RESP,
 | ||
|                                  P.STATE NSTATE,
 | ||
|                                  P.BEGPLAN DBEGPLAN,
 | ||
|                                  P.ENDPLAN DENDPLAN,
 | ||
|                                  P.COST_SUM_BASECURR NCOST_SUM,
 | ||
|                                  CN.INTCODE SCURNAMES,
 | ||
|                                  PKG_P8PANELS_PROJECTS.GET_FIN_IN(P.RN) NFIN_IN,
 | ||
|                                  ''Paynotes'' SLNK_UNIT_NFIN_IN,
 | ||
|                                  0 NLNK_DOCUMENT_NFIN_IN,                                 
 | ||
|                                  PKG_P8PANELS_PROJECTS.GET_FIN_OUT(P.RN) NFIN_OUT,
 | ||
|                                  ''Paynotes'' SLNK_UNIT_NFIN_OUT,
 | ||
|                                  1 NLNK_DOCUMENT_NFIN_OUT,                                 
 | ||
|                                  PKG_P8PANELS_PROJECTS.GET_CTRL_FIN(P.RN) NCTRL_FIN,
 | ||
|                                  PKG_P8PANELS_PROJECTS.GET_CTRL_CONTR(P.RN) NCTRL_CONTR,
 | ||
|                                  PKG_P8PANELS_PROJECTS.GET_CTRL_COEXEC(P.RN) NCTRL_COEXEC,
 | ||
|                                  PKG_P8PANELS_PROJECTS.GET_CTRL_PERIOD(P.RN) NCTRL_PERIOD,
 | ||
|                                  PKG_P8PANELS_PROJECTS.GET_CTRL_COST(P.RN) NCTRL_COST,
 | ||
|                                  PKG_P8PANELS_PROJECTS.GET_CTRL_ACT(P.RN) NCTRL_ACT,
 | ||
|                                  PKG_P8PANELS_PROJECTS.GET_COST_READY(P.RN) NCOST_READY
 | ||
|                             from PROJECT        P,
 | ||
|                                  PRJTYPE        PT,
 | ||
|                                  AGNLIST        EC,
 | ||
|                                  GOVCNTRID      GC,
 | ||
|                                  INS_DEPARTMENT SR,
 | ||
|                                  AGNLIST        R,
 | ||
|                                  CURNAMES       CN
 | ||
|                            where P.PRJTYPE = PT.RN
 | ||
|                              and P.EXT_CUST = EC.RN(+)
 | ||
|                              and P.GOVCNTRID = GC.RN(+)
 | ||
|                              and P.SUBDIV_RESP = SR.RN(+)
 | ||
|                              and P.RESPONSIBLE = R.RN(+)
 | ||
|                              and P.CURNAMES = CN.RN
 | ||
|                              and exists (select null from V_USERPRIV UP where UP.CATALOG = P.CRN)
 | ||
|                              and exists (select null from V_USERPRIV UP where UP.JUR_PERS = P.JUR_PERS and UP.UNITCODE = ''Projects'')
 | ||
|                              and P.RN in (select ID from COND_BROKER_IDSMART where IDENT = :NIDENT) %ORDER_BY%) D) F
 | ||
|            where F.NROW between :NROW_FROM and :NROW_TO';
 | ||
|       /* Учтём сортировки */
 | ||
|       PKG_P8PANELS_VISUAL.TORDERS_SET_QUERY(RDATA_GRID => RDG, RORDERS => RO, SPATTERN => '%ORDER_BY%', CSQL => CSQL);
 | ||
|       /* Учтём фильтры */
 | ||
|       PKG_P8PANELS_VISUAL.TFILTERS_SET_QUERY(NIDENT     => NIDENT,
 | ||
|                                              NCOMPANY   => NCOMPANY,
 | ||
|                                              SUNIT      => 'Projects',
 | ||
|                                              SPROCEDURE => 'PKG_P8PANELS_PROJECTS.COND',
 | ||
|                                              RDATA_GRID => RDG,
 | ||
|                                              RFILTERS   => RF);
 | ||
|       /* Разбираем его */
 | ||
|       ICURSOR := PKG_SQL_DML.OPEN_CURSOR(SWHAT => 'SELECT');
 | ||
|       PKG_SQL_DML.PARSE(ICURSOR => ICURSOR, SQUERY => CSQL);
 | ||
|       /* Делаем подстановку параметров */
 | ||
|       PKG_SQL_DML.BIND_VARIABLE_NUM(ICURSOR => ICURSOR, SNAME => 'NECON_RESP_DP', NVALUE => NECON_RESP_DP);
 | ||
|       PKG_SQL_DML.BIND_VARIABLE_NUM(ICURSOR => ICURSOR, SNAME => 'NIDENT', NVALUE => NIDENT);
 | ||
|       PKG_SQL_DML.BIND_VARIABLE_NUM(ICURSOR => ICURSOR, SNAME => 'NROW_FROM', NVALUE => NROW_FROM);
 | ||
|       PKG_SQL_DML.BIND_VARIABLE_NUM(ICURSOR => ICURSOR, SNAME => 'NROW_TO', NVALUE => NROW_TO);
 | ||
|       /* Описываем структуру записи курсора */
 | ||
|       PKG_SQL_DML.DEFINE_COLUMN_NUM(ICURSOR => ICURSOR, IPOSITION => 1);
 | ||
|       PKG_SQL_DML.DEFINE_COLUMN_STR(ICURSOR => ICURSOR, IPOSITION => 2);
 | ||
|       PKG_SQL_DML.DEFINE_COLUMN_STR(ICURSOR => ICURSOR, IPOSITION => 3);
 | ||
|       PKG_SQL_DML.DEFINE_COLUMN_STR(ICURSOR => ICURSOR, IPOSITION => 4);
 | ||
|       PKG_SQL_DML.DEFINE_COLUMN_STR(ICURSOR => ICURSOR, IPOSITION => 5);
 | ||
|       PKG_SQL_DML.DEFINE_COLUMN_STR(ICURSOR => ICURSOR, IPOSITION => 6);
 | ||
|       PKG_SQL_DML.DEFINE_COLUMN_STR(ICURSOR => ICURSOR, IPOSITION => 7);
 | ||
|       PKG_SQL_DML.DEFINE_COLUMN_STR(ICURSOR => ICURSOR, IPOSITION => 8);
 | ||
|       PKG_SQL_DML.DEFINE_COLUMN_STR(ICURSOR => ICURSOR, IPOSITION => 9);
 | ||
|       PKG_SQL_DML.DEFINE_COLUMN_STR(ICURSOR => ICURSOR, IPOSITION => 10);
 | ||
|       PKG_SQL_DML.DEFINE_COLUMN_NUM(ICURSOR => ICURSOR, IPOSITION => 11);
 | ||
|       PKG_SQL_DML.DEFINE_COLUMN_STR(ICURSOR => ICURSOR, IPOSITION => 12);
 | ||
|       PKG_SQL_DML.DEFINE_COLUMN_STR(ICURSOR => ICURSOR, IPOSITION => 13);
 | ||
|       PKG_SQL_DML.DEFINE_COLUMN_STR(ICURSOR => ICURSOR, IPOSITION => 14);
 | ||
|       PKG_SQL_DML.DEFINE_COLUMN_NUM(ICURSOR => ICURSOR, IPOSITION => 15);
 | ||
|       PKG_SQL_DML.DEFINE_COLUMN_DATE(ICURSOR => ICURSOR, IPOSITION => 16);
 | ||
|       PKG_SQL_DML.DEFINE_COLUMN_DATE(ICURSOR => ICURSOR, IPOSITION => 17);
 | ||
|       PKG_SQL_DML.DEFINE_COLUMN_NUM(ICURSOR => ICURSOR, IPOSITION => 18);
 | ||
|       PKG_SQL_DML.DEFINE_COLUMN_STR(ICURSOR => ICURSOR, IPOSITION => 19);
 | ||
|       PKG_SQL_DML.DEFINE_COLUMN_NUM(ICURSOR => ICURSOR, IPOSITION => 20);
 | ||
|       PKG_SQL_DML.DEFINE_COLUMN_STR(ICURSOR => ICURSOR, IPOSITION => 21);
 | ||
|       PKG_SQL_DML.DEFINE_COLUMN_NUM(ICURSOR => ICURSOR, IPOSITION => 22);
 | ||
|       PKG_SQL_DML.DEFINE_COLUMN_NUM(ICURSOR => ICURSOR, IPOSITION => 23);
 | ||
|       PKG_SQL_DML.DEFINE_COLUMN_STR(ICURSOR => ICURSOR, IPOSITION => 24);
 | ||
|       PKG_SQL_DML.DEFINE_COLUMN_NUM(ICURSOR => ICURSOR, IPOSITION => 25);
 | ||
|       PKG_SQL_DML.DEFINE_COLUMN_NUM(ICURSOR => ICURSOR, IPOSITION => 26);
 | ||
|       PKG_SQL_DML.DEFINE_COLUMN_NUM(ICURSOR => ICURSOR, IPOSITION => 27);
 | ||
|       PKG_SQL_DML.DEFINE_COLUMN_NUM(ICURSOR => ICURSOR, IPOSITION => 28);
 | ||
|       PKG_SQL_DML.DEFINE_COLUMN_NUM(ICURSOR => ICURSOR, IPOSITION => 29);
 | ||
|       PKG_SQL_DML.DEFINE_COLUMN_NUM(ICURSOR => ICURSOR, IPOSITION => 30);
 | ||
|       PKG_SQL_DML.DEFINE_COLUMN_NUM(ICURSOR => ICURSOR, IPOSITION => 31);
 | ||
|       PKG_SQL_DML.DEFINE_COLUMN_NUM(ICURSOR => ICURSOR, IPOSITION => 32);
 | ||
|       /* Делаем выборку */
 | ||
|       if (PKG_SQL_DML.EXECUTE(ICURSOR => ICURSOR) = 0) then
 | ||
|         null;
 | ||
|       end if;
 | ||
|       /* Обходим выбранные записи */
 | ||
|       while (PKG_SQL_DML.FETCH_ROWS(ICURSOR => ICURSOR) > 0)
 | ||
|       loop
 | ||
|         /* Добавляем колонки с данными */
 | ||
|         PKG_P8PANELS_VISUAL.TROW_ADD_CUR_COLN(RROW => RDG_ROW, SNAME => 'NRN', ICURSOR => ICURSOR, NPOSITION => 1, BCLEAR => true);
 | ||
|         PKG_P8PANELS_VISUAL.TROW_ADD_CUR_COLS(RROW => RDG_ROW, SNAME => 'SCODE', ICURSOR => ICURSOR, NPOSITION => 2);
 | ||
|         PKG_P8PANELS_VISUAL.TROW_ADD_CUR_COLS(RROW => RDG_ROW, SNAME => 'SNAME', ICURSOR => ICURSOR, NPOSITION => 3);
 | ||
|         PKG_P8PANELS_VISUAL.TROW_ADD_CUR_COLS(RROW      => RDG_ROW,
 | ||
|                                               SNAME     => 'SNAME_USL',
 | ||
|                                               ICURSOR   => ICURSOR,
 | ||
|                                               NPOSITION => 4);
 | ||
|         PKG_P8PANELS_VISUAL.TROW_ADD_CUR_COLS(RROW      => RDG_ROW,
 | ||
|                                               SNAME     => 'SEXPECTED_RES',
 | ||
|                                               ICURSOR   => ICURSOR,
 | ||
|                                               NPOSITION => 5);
 | ||
|         PKG_P8PANELS_VISUAL.TROW_ADD_CUR_COLS(RROW => RDG_ROW, SNAME => 'SPRJTYPE', ICURSOR => ICURSOR, NPOSITION => 6);
 | ||
|         PKG_P8PANELS_VISUAL.TROW_ADD_CUR_COLS(RROW      => RDG_ROW,
 | ||
|                                               SNAME     => 'SEXT_CUST',
 | ||
|                                               ICURSOR   => ICURSOR,
 | ||
|                                               NPOSITION => 7);
 | ||
|         PKG_P8PANELS_VISUAL.TROW_ADD_CUR_COLS(RROW      => RDG_ROW,
 | ||
|                                               SNAME     => 'SGOVCNTRID',
 | ||
|                                               ICURSOR   => ICURSOR,
 | ||
|                                               NPOSITION => 8);
 | ||
|         PKG_P8PANELS_VISUAL.TROW_ADD_CUR_COLS(RROW => RDG_ROW, SNAME => 'SDOC_OSN', ICURSOR => ICURSOR, NPOSITION => 9);
 | ||
|         PKG_P8PANELS_VISUAL.TROW_ADD_CUR_COLS(RROW      => RDG_ROW,
 | ||
|                                               SNAME     => 'SLNK_UNIT_SDOC_OSN',
 | ||
|                                               ICURSOR   => ICURSOR,
 | ||
|                                               NPOSITION => 10);
 | ||
|         PKG_P8PANELS_VISUAL.TROW_ADD_CUR_COLN(RROW      => RDG_ROW,
 | ||
|                                               SNAME     => 'NLNK_DOCUMENT_SDOC_OSN',
 | ||
|                                               ICURSOR   => ICURSOR,
 | ||
|                                               NPOSITION => 11);
 | ||
|         PKG_P8PANELS_VISUAL.TROW_ADD_CUR_COLS(RROW      => RDG_ROW,
 | ||
|                                               SNAME     => 'SSUBDIV_RESP',
 | ||
|                                               ICURSOR   => ICURSOR,
 | ||
|                                               NPOSITION => 12);
 | ||
|         PKG_P8PANELS_VISUAL.TROW_ADD_CUR_COLS(RROW      => RDG_ROW,
 | ||
|                                               SNAME     => 'SRESPONSIBLE',
 | ||
|                                               ICURSOR   => ICURSOR,
 | ||
|                                               NPOSITION => 13);
 | ||
|         PKG_P8PANELS_VISUAL.TROW_ADD_CUR_COLS(RROW      => RDG_ROW,
 | ||
|                                               SNAME     => 'SECON_RESP',
 | ||
|                                               ICURSOR   => ICURSOR,
 | ||
|                                               NPOSITION => 14);
 | ||
|         PKG_P8PANELS_VISUAL.TROW_ADD_CUR_COLN(RROW => RDG_ROW, SNAME => 'NSTATE', ICURSOR => ICURSOR, NPOSITION => 15);
 | ||
|         PKG_P8PANELS_VISUAL.TROW_ADD_CUR_COLD(RROW      => RDG_ROW,
 | ||
|                                               SNAME     => 'DBEGPLAN',
 | ||
|                                               ICURSOR   => ICURSOR,
 | ||
|                                               NPOSITION => 16);
 | ||
|         PKG_P8PANELS_VISUAL.TROW_ADD_CUR_COLD(RROW      => RDG_ROW,
 | ||
|                                               SNAME     => 'DENDPLAN',
 | ||
|                                               ICURSOR   => ICURSOR,
 | ||
|                                               NPOSITION => 17);
 | ||
|         PKG_P8PANELS_VISUAL.TROW_ADD_CUR_COLN(RROW      => RDG_ROW,
 | ||
|                                               SNAME     => 'NCOST_SUM',
 | ||
|                                               ICURSOR   => ICURSOR,
 | ||
|                                               NPOSITION => 18);
 | ||
|         PKG_P8PANELS_VISUAL.TROW_ADD_CUR_COLS(RROW      => RDG_ROW,
 | ||
|                                               SNAME     => 'SCURNAMES',
 | ||
|                                               ICURSOR   => ICURSOR,
 | ||
|                                               NPOSITION => 19);      
 | ||
|         PKG_P8PANELS_VISUAL.TROW_ADD_CUR_COLN(RROW => RDG_ROW, SNAME => 'NFIN_IN', ICURSOR => ICURSOR, NPOSITION => 20);
 | ||
|         PKG_P8PANELS_VISUAL.TROW_ADD_CUR_COLS(RROW      => RDG_ROW,
 | ||
|                                               SNAME     => 'SLNK_UNIT_NFIN_IN',
 | ||
|                                               ICURSOR   => ICURSOR,
 | ||
|                                               NPOSITION => 21);
 | ||
|         PKG_P8PANELS_VISUAL.TROW_ADD_CUR_COLN(RROW      => RDG_ROW,
 | ||
|                                               SNAME     => 'NLNK_DOCUMENT_NFIN_IN',
 | ||
|                                               ICURSOR   => ICURSOR,
 | ||
|                                               NPOSITION => 22);      
 | ||
|         PKG_P8PANELS_VISUAL.TROW_ADD_CUR_COLN(RROW      => RDG_ROW,
 | ||
|                                               SNAME     => 'NFIN_OUT',
 | ||
|                                               ICURSOR   => ICURSOR,
 | ||
|                                               NPOSITION => 23);
 | ||
|         PKG_P8PANELS_VISUAL.TROW_ADD_CUR_COLS(RROW      => RDG_ROW,
 | ||
|                                               SNAME     => 'SLNK_UNIT_NFIN_OUT',
 | ||
|                                               ICURSOR   => ICURSOR,
 | ||
|                                               NPOSITION => 24);
 | ||
|         PKG_P8PANELS_VISUAL.TROW_ADD_CUR_COLN(RROW      => RDG_ROW,
 | ||
|                                               SNAME     => 'NLNK_DOCUMENT_NFIN_OUT',
 | ||
|                                               ICURSOR   => ICURSOR,
 | ||
|                                               NPOSITION => 25);
 | ||
|         PKG_P8PANELS_VISUAL.TROW_ADD_CUR_COLN(RROW      => RDG_ROW,
 | ||
|                                               SNAME     => 'NCTRL_FIN',
 | ||
|                                               ICURSOR   => ICURSOR,
 | ||
|                                               NPOSITION => 26);
 | ||
|         PKG_P8PANELS_VISUAL.TROW_ADD_CUR_COLN(RROW      => RDG_ROW,
 | ||
|                                               SNAME     => 'NCTRL_CONTR',
 | ||
|                                               ICURSOR   => ICURSOR,
 | ||
|                                               NPOSITION => 27);
 | ||
|         PKG_P8PANELS_VISUAL.TROW_ADD_CUR_COLN(RROW      => RDG_ROW,
 | ||
|                                               SNAME     => 'NCTRL_COEXEC',
 | ||
|                                               ICURSOR   => ICURSOR,
 | ||
|                                               NPOSITION => 28);
 | ||
|         PKG_P8PANELS_VISUAL.TROW_ADD_CUR_COLN(RROW      => RDG_ROW,
 | ||
|                                               SNAME     => 'NCTRL_PERIOD',
 | ||
|                                               ICURSOR   => ICURSOR,
 | ||
|                                               NPOSITION => 29);
 | ||
|         PKG_P8PANELS_VISUAL.TROW_ADD_CUR_COLN(RROW      => RDG_ROW,
 | ||
|                                               SNAME     => 'NCTRL_COST',
 | ||
|                                               ICURSOR   => ICURSOR,
 | ||
|                                               NPOSITION => 30);
 | ||
|         PKG_P8PANELS_VISUAL.TROW_ADD_CUR_COLN(RROW      => RDG_ROW,
 | ||
|                                               SNAME     => 'NCTRL_ACT',
 | ||
|                                               ICURSOR   => ICURSOR,
 | ||
|                                               NPOSITION => 31);
 | ||
|         PKG_P8PANELS_VISUAL.TROW_ADD_CUR_COLN(RROW      => RDG_ROW,
 | ||
|                                               SNAME     => 'NCOST_READY',
 | ||
|                                               ICURSOR   => ICURSOR,
 | ||
|                                               NPOSITION => 32);
 | ||
|         /* Добавляем строку в таблицу */
 | ||
|         PKG_P8PANELS_VISUAL.TDATA_GRID_ADD_ROW(RDATA_GRID => RDG, RROW => RDG_ROW);
 | ||
|       end loop;
 | ||
|       /* Освобождаем курсор */
 | ||
|       PKG_SQL_DML.CLOSE_CURSOR(ICURSOR => ICURSOR);
 | ||
|     exception
 | ||
|       when others then
 | ||
|         PKG_SQL_DML.CLOSE_CURSOR(ICURSOR => ICURSOR);
 | ||
|         raise;
 | ||
|     end;
 | ||
|     /* Сериализуем описание */
 | ||
|     COUT := PKG_P8PANELS_VISUAL.TDATA_GRID_TO_XML(RDATA_GRID => RDG, NINCLUDE_DEF => NINCLUDE_DEF);
 | ||
|   end LIST;
 | ||
|   
 | ||
|   /* График по данным проектов - "Топ проблем" */
 | ||
|   procedure CHART_PROBLEMS
 | ||
|   (
 | ||
|     COUT                    out clob                                           -- Сериализованный график
 | ||
|   )
 | ||
|   is
 | ||
|     NCOMPANY                PKG_STD.TREF := GET_SESSION_COMPANY();             -- Организация сеанса
 | ||
|     RCH                     PKG_P8PANELS_VISUAL.TCHART;                        -- График
 | ||
|     RCH_DS                  PKG_P8PANELS_VISUAL.TCHART_DATASET;                -- Набор данных
 | ||
|     RATTR_VALS              PKG_P8PANELS_VISUAL.TCHART_DATASET_ITEM_ATTR_VALS; -- Атрибуты элемента набора данных
 | ||
|   begin
 | ||
|     /* Сформируем заголовок графика */
 | ||
|     RCH := PKG_P8PANELS_VISUAL.TCHART_MAKE(STYPE     => PKG_P8PANELS_VISUAL.SCHART_TYPE_BAR,
 | ||
|                                            STITLE    => 'Топ проблем',
 | ||
|                                            SLGND_POS => PKG_P8PANELS_VISUAL.SCHART_LGND_POS_TOP);
 | ||
|     /* Сформируем набор данных */
 | ||
|     RCH_DS := PKG_P8PANELS_VISUAL.TCHART_DATASET_MAKE(SCAPTION => 'Кол-во проектов с проблемой');
 | ||
|     /* Строим список проблем по убыванию количества */
 | ||
|     for C in (select D.SFILTER,
 | ||
|                      D.SNAME,
 | ||
|                      D.NCOUNT
 | ||
|                 from (select 'NCTRL_FIN' SFILTER,
 | ||
|                              'Финансирование' SNAME,
 | ||
|                              count(P.RN) NCOUNT
 | ||
|                         from PROJECT P
 | ||
|                        where P.COMPANY = NCOMPANY 
 | ||
|                          and PKG_P8PANELS_PROJECTS.GET_CTRL_FIN(P.RN) = 1
 | ||
|                          and exists (select null from V_USERPRIV UP where UP.CATALOG = P.CRN)
 | ||
|                          and exists (select null
 | ||
|                                 from V_USERPRIV UP
 | ||
|                                where UP.JUR_PERS = P.JUR_PERS
 | ||
|                                  and UP.UNITCODE = 'Projects')
 | ||
|                       union all
 | ||
|                       select 'NCTRL_CONTR' SFILTER,
 | ||
|                              'Контрактация' SNAME,
 | ||
|                              count(P.RN) NCOUNT
 | ||
|                         from PROJECT P
 | ||
|                        where P.COMPANY = NCOMPANY 
 | ||
|                          and PKG_P8PANELS_PROJECTS.GET_CTRL_CONTR(P.RN) = 1
 | ||
|                          and exists (select null from V_USERPRIV UP where UP.CATALOG = P.CRN)
 | ||
|                          and exists (select null
 | ||
|                                 from V_USERPRIV UP
 | ||
|                                where UP.JUR_PERS = P.JUR_PERS
 | ||
|                                  and UP.UNITCODE = 'Projects')
 | ||
|                       union all
 | ||
|                       select 'NCTRL_COEXEC' SFILTER,
 | ||
|                              'Соисполнение' SNAME,
 | ||
|                              count(P.RN) NCOUNT
 | ||
|                         from PROJECT P
 | ||
|                        where P.COMPANY = NCOMPANY 
 | ||
|                          and PKG_P8PANELS_PROJECTS.GET_CTRL_COEXEC(P.RN) = 1
 | ||
|                          and exists (select null from V_USERPRIV UP where UP.CATALOG = P.CRN)
 | ||
|                          and exists (select null
 | ||
|                                 from V_USERPRIV UP
 | ||
|                                where UP.JUR_PERS = P.JUR_PERS
 | ||
|                                  and UP.UNITCODE = 'Projects')
 | ||
|                       union all
 | ||
|                       select 'NCTRL_PERIOD' SFILTER,
 | ||
|                              'Сроки' SNAME,
 | ||
|                              count(P.RN) NCOUNT
 | ||
|                         from PROJECT P
 | ||
|                        where P.COMPANY = NCOMPANY 
 | ||
|                          and PKG_P8PANELS_PROJECTS.GET_CTRL_PERIOD(P.RN) = 1
 | ||
|                          and exists (select null from V_USERPRIV UP where UP.CATALOG = P.CRN)
 | ||
|                          and exists (select null
 | ||
|                                 from V_USERPRIV UP
 | ||
|                                where UP.JUR_PERS = P.JUR_PERS
 | ||
|                                  and UP.UNITCODE = 'Projects')
 | ||
|                       union all
 | ||
|                       select 'NCTRL_COST' SFILTER,
 | ||
|                              'Затраты' SNAME,
 | ||
|                              count(P.RN) NCOUNT
 | ||
|                         from PROJECT P
 | ||
|                        where P.COMPANY = NCOMPANY 
 | ||
|                          and PKG_P8PANELS_PROJECTS.GET_CTRL_COST(P.RN) = 1
 | ||
|                          and exists (select null from V_USERPRIV UP where UP.CATALOG = P.CRN)
 | ||
|                          and exists (select null
 | ||
|                                 from V_USERPRIV UP
 | ||
|                                where UP.JUR_PERS = P.JUR_PERS
 | ||
|                                  and UP.UNITCODE = 'Projects')
 | ||
|                       union all
 | ||
|                       select 'NCTRL_ACT' SFILTER,
 | ||
|                              'Актирование' SNAME,
 | ||
|                              count(P.RN) NCOUNT
 | ||
|                         from PROJECT P
 | ||
|                        where P.COMPANY = NCOMPANY 
 | ||
|                          and PKG_P8PANELS_PROJECTS.GET_CTRL_ACT(P.RN) = 1
 | ||
|                          and exists (select null from V_USERPRIV UP where UP.CATALOG = P.CRN)
 | ||
|                          and exists (select null
 | ||
|                                 from V_USERPRIV UP
 | ||
|                                where UP.JUR_PERS = P.JUR_PERS
 | ||
|                                  and UP.UNITCODE = 'Projects')) D
 | ||
|                order by D.NCOUNT desc)
 | ||
|     loop
 | ||
|       /* Если проблема выявлена */
 | ||
|       if (C.NCOUNT > 0) then
 | ||
|         /* Добавим метку для проблемы */
 | ||
|         PKG_P8PANELS_VISUAL.TCHART_ADD_LABEL(RCHART => RCH, SLABEL => C.SNAME);
 | ||
|         /* Добавим проблему в набор данных */
 | ||
|         PKG_P8PANELS_VISUAL.TCHART_DATASET_ITM_ATTR_VL_ADD(RATTR_VALS => RATTR_VALS,
 | ||
|                                                            SNAME      => 'SFILTER',
 | ||
|                                                            SVALUE     => C.SFILTER,
 | ||
|                                                            BCLEAR     => true);
 | ||
|         PKG_P8PANELS_VISUAL.TCHART_DATASET_ITM_ATTR_VL_ADD(RATTR_VALS => RATTR_VALS,
 | ||
|                                                            SNAME      => 'SFILTER_VALUE',
 | ||
|                                                            SVALUE     => '1');
 | ||
|         PKG_P8PANELS_VISUAL.TCHART_DATASET_ADD_ITEM(RDATASET => RCH_DS, NVALUE => C.NCOUNT, RATTR_VALS => RATTR_VALS);
 | ||
|       end if;
 | ||
|     end loop;
 | ||
|     /* Добавим набор данных в график */
 | ||
|     PKG_P8PANELS_VISUAL.TCHART_ADD_DATASET(RCHART => RCH, RDATASET => RCH_DS);
 | ||
|     /* Сериализуем описание */
 | ||
|     COUT := PKG_P8PANELS_VISUAL.TCHART_TO_XML(RCHART => RCH, NINCLUDE_DEF => 1);
 | ||
|   end CHART_PROBLEMS;
 | ||
|   
 | ||
|   /* График по данным проектов - "Топ заказчиков" */
 | ||
|   procedure CHART_CUSTOMERS
 | ||
|   (
 | ||
|     COUT                    out clob                                           -- Сериализованный график
 | ||
|   )
 | ||
|   is
 | ||
|     NCOMPANY                PKG_STD.TREF := GET_SESSION_COMPANY();             -- Организация сеанса
 | ||
|     RCH                     PKG_P8PANELS_VISUAL.TCHART;                        -- График
 | ||
|     RCH_DS                  PKG_P8PANELS_VISUAL.TCHART_DATASET;                -- Набор данных
 | ||
|     RATTR_VALS              PKG_P8PANELS_VISUAL.TCHART_DATASET_ITEM_ATTR_VALS; -- Атрибуты элемента набора данных
 | ||
|   begin
 | ||
|     /* Сформируем заголовок графика */
 | ||
|     RCH := PKG_P8PANELS_VISUAL.TCHART_MAKE(STYPE     => PKG_P8PANELS_VISUAL.SCHART_TYPE_PIE,
 | ||
|                                            STITLE    => 'Топ заказчиков',
 | ||
|                                            SLGND_POS => PKG_P8PANELS_VISUAL.SCHART_LGND_POS_RIGHT);
 | ||
|     /* Сформируем набор данных */
 | ||
|     RCH_DS := PKG_P8PANELS_VISUAL.TCHART_DATASET_MAKE(SCAPTION => 'Стоимость проектов');
 | ||
|     /* Обходим проекты, сгруппированные по внешним заказчикам */
 | ||
|     for C in (select D.SEXT_CUST,
 | ||
|                      D.NSUM
 | ||
|                 from (select EC.AGNABBR SEXT_CUST,
 | ||
|                              sum(P.COST_SUM_BASECURR) NSUM
 | ||
|                         from PROJECT P,
 | ||
|                              AGNLIST EC
 | ||
|                        where P.COMPANY = NCOMPANY
 | ||
|                          and P.EXT_CUST = EC.RN
 | ||
|                        group by EC.AGNABBR
 | ||
|                        order by 2 desc) D
 | ||
|                where ROWNUM <= 5)
 | ||
|     loop
 | ||
|       /* Добавим метку для контрагента */
 | ||
|       PKG_P8PANELS_VISUAL.TCHART_ADD_LABEL(RCHART => RCH, SLABEL => C.SEXT_CUST);
 | ||
|       /* Добавим контрагента в набор данных */
 | ||
|       PKG_P8PANELS_VISUAL.TCHART_DATASET_ITM_ATTR_VL_ADD(RATTR_VALS => RATTR_VALS,
 | ||
|                                                          SNAME      => 'SFILTER',
 | ||
|                                                          SVALUE     => 'SEXT_CUST',
 | ||
|                                                          BCLEAR     => true);
 | ||
|       PKG_P8PANELS_VISUAL.TCHART_DATASET_ITM_ATTR_VL_ADD(RATTR_VALS => RATTR_VALS,
 | ||
|                                                          SNAME      => 'SFILTER_VALUE',
 | ||
|                                                          SVALUE     => C.SEXT_CUST);
 | ||
|       PKG_P8PANELS_VISUAL.TCHART_DATASET_ADD_ITEM(RDATASET => RCH_DS, NVALUE => C.NSUM, RATTR_VALS => RATTR_VALS);
 | ||
|     end loop;
 | ||
|     /* Добавим набор данных в график */
 | ||
|     PKG_P8PANELS_VISUAL.TCHART_ADD_DATASET(RCHART => RCH, RDATASET => RCH_DS);
 | ||
|     /* Сериализуем описание */
 | ||
|     COUT := PKG_P8PANELS_VISUAL.TCHART_TO_XML(RCHART => RCH, NINCLUDE_DEF => 1);
 | ||
|   end CHART_CUSTOMERS;
 | ||
|   
 | ||
|   /* График по данным проектов - "Затраты на проекты" */
 | ||
|   procedure CHART_FCCOSTNOTES
 | ||
|   (
 | ||
|     COUT                    out clob                                           -- Сериализованный график
 | ||
|   )
 | ||
|   is
 | ||
|     NCOMPANY                PKG_STD.TREF := GET_SESSION_COMPANY();             -- Организация сеанса
 | ||
|     RCH                     PKG_P8PANELS_VISUAL.TCHART;                        -- График
 | ||
|     RCH_DS                  PKG_P8PANELS_VISUAL.TCHART_DATASET;                -- Набор данных
 | ||
|     RATTR_VALS              PKG_P8PANELS_VISUAL.TCHART_DATASET_ITEM_ATTR_VALS; -- Атрибуты элемента набора данных
 | ||
|     NYEAR                   PKG_STD.TNUMBER;                                   -- Текущий год
 | ||
|     NSUM                    PKG_STD.TNUMBER;                                   -- Сумма затрат в текущем месяце
 | ||
|   begin
 | ||
|     NYEAR := TO_NUMBER(TO_CHAR(sysdate, 'yyyy'));
 | ||
|     /* Сформируем заголовок графика */
 | ||
|     RCH := PKG_P8PANELS_VISUAL.TCHART_MAKE(STYPE     => PKG_P8PANELS_VISUAL.SCHART_TYPE_LINE,
 | ||
|                                            STITLE    => 'Затраты на проекты в ' || TO_CHAR(NYEAR) || ' году',
 | ||
|                                            SLGND_POS => PKG_P8PANELS_VISUAL.SCHART_LGND_POS_TOP);
 | ||
|     /* Сформируем набор данных */
 | ||
|     RCH_DS := PKG_P8PANELS_VISUAL.TCHART_DATASET_MAKE(SCAPTION => 'Сумма затрат (тыс. руб.)');
 | ||
|     /* Обходим месяцы года */
 | ||
|     for I in 1 .. 12
 | ||
|     loop
 | ||
|       /* Суммируем затраты этого месяца, отнесённые на проекты */
 | ||
|       select COALESCE(sum(CN.COST_BSUM) / 1000, 0)
 | ||
|         into NSUM
 | ||
|         from FCCOSTNOTES CN
 | ||
|        where CN.COMPANY = NCOMPANY
 | ||
|          and TO_NUMBER(TO_CHAR(CN.COST_DATE, 'mm')) = I
 | ||
|          and TO_NUMBER(TO_CHAR(CN.COST_DATE, 'yyyy')) = NYEAR
 | ||
|          and exists (select null from V_USERPRIV UP where UP.CATALOG = CN.CRN)
 | ||
|          and CN.PROD_ORDER in (select PS.FACEACC
 | ||
|                                  from PROJECTSTAGE PS
 | ||
|                                 where PS.COMPANY = CN.COMPANY
 | ||
|                                   and exists (select null from V_USERPRIV UP where UP.CATALOG = PS.CRN)
 | ||
|                                   and exists (select null
 | ||
|                                          from V_USERPRIV UP
 | ||
|                                         where UP.JUR_PERS = PS.JUR_PERS
 | ||
|                                           and UP.UNITCODE = 'Projects'));
 | ||
|       /* Добавим метку для месяца */
 | ||
|       PKG_P8PANELS_VISUAL.TCHART_ADD_LABEL(RCHART => RCH, SLABEL => F_GET_MONTH(NVALUE => I));
 | ||
|       /* Добавим месяц в набор данных */
 | ||
|       PKG_P8PANELS_VISUAL.TCHART_DATASET_ITM_ATTR_VL_ADD(RATTR_VALS => RATTR_VALS,
 | ||
|                                                          SNAME      => 'SUNITCODE',
 | ||
|                                                          SVALUE     => 'CostNotes',
 | ||
|                                                          BCLEAR     => true);
 | ||
|       PKG_P8PANELS_VISUAL.TCHART_DATASET_ITM_ATTR_VL_ADD(RATTR_VALS => RATTR_VALS, SNAME => 'NYEAR', SVALUE => NYEAR);
 | ||
|       PKG_P8PANELS_VISUAL.TCHART_DATASET_ITM_ATTR_VL_ADD(RATTR_VALS => RATTR_VALS, SNAME => 'NMONTH', SVALUE => I);
 | ||
|       PKG_P8PANELS_VISUAL.TCHART_DATASET_ADD_ITEM(RDATASET => RCH_DS, NVALUE => NSUM, RATTR_VALS => RATTR_VALS);
 | ||
|     end loop;
 | ||
|     /* Добавим набор данных в график */
 | ||
|     PKG_P8PANELS_VISUAL.TCHART_ADD_DATASET(RCHART => RCH, RDATASET => RCH_DS);
 | ||
|     /* Сериализуем описание */
 | ||
|     COUT := PKG_P8PANELS_VISUAL.TCHART_TO_XML(RCHART => RCH, NINCLUDE_DEF => 1);
 | ||
|   end CHART_FCCOSTNOTES;
 | ||
|   
 | ||
|   /* График по данным проектов - "Затраты на проекты" (подбор записей журнала затрат по точке графика) */
 | ||
|   procedure CHART_FCCOSTNOTES_SELECT_COST
 | ||
|   (
 | ||
|     NYEAR                   in number,                             -- Год
 | ||
|     NMONTH                  in number,                             -- Месяц
 | ||
|     NIDENT                  out number                             -- Идентификатор буфера подобранных (списка отмеченных записей, null - не найдено)
 | ||
|   )
 | ||
|   is
 | ||
|     NCOMPANY                PKG_STD.TREF := GET_SESSION_COMPANY(); -- Организация сеанса
 | ||
|     NSELECTLIST             PKG_STD.TREF;                          -- Рег. номер добавленной записи буфера подобранных
 | ||
|   begin
 | ||
|     /* Подберём записи журнала затрат */
 | ||
|     for C in (select CN.COMPANY,
 | ||
|                      CN.RN
 | ||
|                 from FCCOSTNOTES CN
 | ||
|                where CN.COMPANY = NCOMPANY
 | ||
|                  and TO_NUMBER(TO_CHAR(CN.COST_DATE, 'mm')) = NMONTH
 | ||
|                  and TO_NUMBER(TO_CHAR(CN.COST_DATE, 'yyyy')) = NYEAR
 | ||
|                  and exists
 | ||
|                (select null from V_USERPRIV UP where UP.CATALOG = CN.CRN)
 | ||
|                  and CN.PROD_ORDER in (select PS.FACEACC
 | ||
|                                          from PROJECTSTAGE PS
 | ||
|                                         where PS.COMPANY = CN.COMPANY
 | ||
|                                           and exists (select null from V_USERPRIV UP where UP.CATALOG = PS.CRN)
 | ||
|                                           and exists (select null
 | ||
|                                                  from V_USERPRIV UP
 | ||
|                                                 where UP.JUR_PERS = PS.JUR_PERS
 | ||
|                                                   and UP.UNITCODE = 'Projects')))
 | ||
|     loop
 | ||
|       /* Сформируем идентификатор буфера */
 | ||
|       if (NIDENT is null) then
 | ||
|         NIDENT := GEN_IDENT();
 | ||
|       end if;
 | ||
|       /* Добавим подобранное в список отмеченных записей */
 | ||
|       P_SELECTLIST_BASE_INSERT(NIDENT       => NIDENT,
 | ||
|                                NCOMPANY     => C.COMPANY,
 | ||
|                                NDOCUMENT    => C.RN,
 | ||
|                                SUNITCODE    => 'CostNotes',
 | ||
|                                SACTIONCODE  => null,
 | ||
|                                NCRN         => null,
 | ||
|                                NDOCUMENT1   => null,
 | ||
|                                SUNITCODE1   => null,
 | ||
|                                SACTIONCODE1 => null,
 | ||
|                                NRN          => NSELECTLIST);
 | ||
|     end loop;
 | ||
|   end CHART_FCCOSTNOTES_SELECT_COST;
 | ||
|   
 | ||
|   /* Считывание записи этапа проекта */
 | ||
|   function STAGES_GET
 | ||
|   (
 | ||
|     NRN                     in number             -- Рег. номер этапа проекта
 | ||
|   ) return                  PROJECTSTAGE%rowtype  -- Запись этапа проекта
 | ||
|   is
 | ||
|     RRES                    PROJECTSTAGE%rowtype; -- Буфер для результата
 | ||
|   begin
 | ||
|     select PS.* into RRES from PROJECTSTAGE PS where PS.RN = NRN;
 | ||
|     return RRES;
 | ||
|   exception
 | ||
|     when NO_DATA_FOUND then
 | ||
|       PKG_MSG.RECORD_NOT_FOUND(NFLAG_SMART => 0, NDOCUMENT => NRN, SUNIT_TABLE => 'PROJECTSTAGE');
 | ||
|   end STAGES_GET;
 | ||
|   
 | ||
|   /* Отбор этапов проектов */
 | ||
|   procedure STAGES_COND
 | ||
|   as
 | ||
|   begin
 | ||
|     /* Установка главной таблицы */
 | ||
|     PKG_COND_BROKER.SET_TABLE(STABLE_NAME => 'PROJECTSTAGE');
 | ||
|     /* Проект */
 | ||
|     PKG_COND_BROKER.SET_COLUMN_PRN(SCOLUMN_NAME => 'PRN');
 | ||
|     /* Номер */
 | ||
|     PKG_COND_BROKER.ADD_CONDITION_CODE(SCOLUMN_NAME => 'NUMB', SCONDITION_NAME => 'EDNUMB');
 | ||
|     /* Наименование */
 | ||
|     PKG_COND_BROKER.ADD_CONDITION_CODE(SCOLUMN_NAME => 'NAME', SCONDITION_NAME => 'EDNAME');
 | ||
|     /* Дата начала план */
 | ||
|     PKG_COND_BROKER.ADD_CONDITION_BETWEEN(SCOLUMN_NAME         => 'BEGPLAN',
 | ||
|                                           SCONDITION_NAME_FROM => 'EDPLANBEGFrom',
 | ||
|                                           SCONDITION_NAME_TO   => 'EDPLANBEGTo');
 | ||
|     /* Дата окончания план */
 | ||
|     PKG_COND_BROKER.ADD_CONDITION_BETWEEN(SCOLUMN_NAME         => 'ENDPLAN',
 | ||
|                                           SCONDITION_NAME_FROM => 'EDPLANENDFrom',
 | ||
|                                           SCONDITION_NAME_TO   => 'EDPLANENDTo');
 | ||
|     /* Состояние */
 | ||
|     PKG_COND_BROKER.ADD_CONDITION_ENUM(SCOLUMN_NAME => 'STATE', SCONDITION_NAME => 'CGSTATE');
 | ||
|     /* Контроль финансирования */
 | ||
|     if (PKG_COND_BROKER.CONDITION_EXISTS(SCONDITION_NAME => 'EDCTRL_FIN') = 1) then
 | ||
|       PKG_COND_BROKER.ADD_CLAUSE(SCLAUSE => 'PKG_P8PANELS_PROJECTS.STAGES_GET_CTRL_FIN(RN) = :EDCTRL_FIN');
 | ||
|       PKG_COND_BROKER.BIND_VARIABLE(SVARIABLE_NAME => 'EDCTRL_FIN',
 | ||
|                                     NVALUE         => PKG_COND_BROKER.GET_CONDITION_NUM(SCONDITION_NAME => 'EDCTRL_FIN'));
 | ||
|     end if;
 | ||
|     /* Контроль контрактации */
 | ||
|     if (PKG_COND_BROKER.CONDITION_EXISTS(SCONDITION_NAME => 'EDCTRL_CONTR') = 1) then
 | ||
|       PKG_COND_BROKER.ADD_CLAUSE(SCLAUSE => 'PKG_P8PANELS_PROJECTS.STAGES_GET_CTRL_CONTR(RN) = :EDCTRL_CONTR');
 | ||
|       PKG_COND_BROKER.BIND_VARIABLE(SVARIABLE_NAME => 'EDCTRL_CONTR',
 | ||
|                                     NVALUE         => PKG_COND_BROKER.GET_CONDITION_NUM(SCONDITION_NAME => 'EDCTRL_CONTR'));
 | ||
|     end if;
 | ||
|     /* Контроль соисполнения */
 | ||
|     if (PKG_COND_BROKER.CONDITION_EXISTS(SCONDITION_NAME => 'EDCTRL_COEXEC') = 1) then
 | ||
|       PKG_COND_BROKER.ADD_CLAUSE(SCLAUSE => 'PKG_P8PANELS_PROJECTS.STAGES_GET_CTRL_COEXEC(RN) = :EDCTRL_COEXEC');
 | ||
|       PKG_COND_BROKER.BIND_VARIABLE(SVARIABLE_NAME => 'EDCTRL_COEXEC',
 | ||
|                                     NVALUE         => PKG_COND_BROKER.GET_CONDITION_NUM(SCONDITION_NAME => 'EDCTRL_COEXEC'));
 | ||
|     end if;
 | ||
|     /* Контроль сроков */
 | ||
|     if (PKG_COND_BROKER.CONDITION_EXISTS(SCONDITION_NAME => 'EDCTRL_PERIOD') = 1) then
 | ||
|       PKG_COND_BROKER.ADD_CLAUSE(SCLAUSE => 'PKG_P8PANELS_PROJECTS.STAGES_GET_CTRL_PERIOD(RN) = :EDCTRL_PERIOD');
 | ||
|       PKG_COND_BROKER.BIND_VARIABLE(SVARIABLE_NAME => 'EDCTRL_PERIOD',
 | ||
|                                     NVALUE         => PKG_COND_BROKER.GET_CONDITION_NUM(SCONDITION_NAME => 'EDCTRL_PERIOD'));
 | ||
|     end if;
 | ||
|     /* Контроль затрат */
 | ||
|     if (PKG_COND_BROKER.CONDITION_EXISTS(SCONDITION_NAME => 'EDCTRL_COST') = 1) then
 | ||
|       PKG_COND_BROKER.ADD_CLAUSE(SCLAUSE => 'PKG_P8PANELS_PROJECTS.STAGES_GET_CTRL_COST(RN) = :EDCTRL_COST');
 | ||
|       PKG_COND_BROKER.BIND_VARIABLE(SVARIABLE_NAME => 'EDCTRL_COST',
 | ||
|                                     NVALUE         => PKG_COND_BROKER.GET_CONDITION_NUM(SCONDITION_NAME => 'EDCTRL_COST'));
 | ||
|     end if;
 | ||
|     /* Контроль актирования */
 | ||
|     if (PKG_COND_BROKER.CONDITION_EXISTS(SCONDITION_NAME => 'EDCTRL_ACT') = 1) then
 | ||
|       PKG_COND_BROKER.ADD_CLAUSE(SCLAUSE => 'PKG_P8PANELS_PROJECTS.STAGES_GET_CTRL_ACT(RN) = :EDCTRL_ACT');
 | ||
|       PKG_COND_BROKER.BIND_VARIABLE(SVARIABLE_NAME => 'EDCTRL_ACT',
 | ||
|                                     NVALUE         => PKG_COND_BROKER.GET_CONDITION_NUM(SCONDITION_NAME => 'EDCTRL_ACT'));
 | ||
|     end if;
 | ||
|     /* Готовность (%, по затратам) */
 | ||
|     if ((PKG_COND_BROKER.CONDITION_EXISTS(SCONDITION_NAME => 'EDCOST_READYFrom') = 1) and
 | ||
|        (PKG_COND_BROKER.CONDITION_EXISTS(SCONDITION_NAME => 'EDCOST_READYTo') = 0)) then
 | ||
|       PKG_COND_BROKER.ADD_CLAUSE(SCLAUSE => 'PKG_P8PANELS_PROJECTS.STAGES_GET_COST_READY(RN) >= :EDCOST_READYFrom');
 | ||
|       PKG_COND_BROKER.BIND_VARIABLE(SVARIABLE_NAME => 'EDCOST_READYFrom',
 | ||
|                                     NVALUE         => PKG_COND_BROKER.GET_CONDITION_NUM(SCONDITION_NAME => 'EDCOST_READYFrom'));
 | ||
|     end if;
 | ||
|     if ((PKG_COND_BROKER.CONDITION_EXISTS(SCONDITION_NAME => 'EDCOST_READYTo') = 1) and
 | ||
|        (PKG_COND_BROKER.CONDITION_EXISTS(SCONDITION_NAME => 'EDCOST_READYFrom') = 0)) then
 | ||
|       PKG_COND_BROKER.ADD_CLAUSE(SCLAUSE => 'PKG_P8PANELS_PROJECTS.STAGES_GET_COST_READY(RN) <= :EDCOST_READYTo');
 | ||
|       PKG_COND_BROKER.BIND_VARIABLE(SVARIABLE_NAME => 'EDCOST_READYTo',
 | ||
|                                     NVALUE         => PKG_COND_BROKER.GET_CONDITION_NUM(SCONDITION_NAME => 'EDCOST_READYTo'));
 | ||
|     end if;
 | ||
|     if ((PKG_COND_BROKER.CONDITION_EXISTS(SCONDITION_NAME => 'EDCOST_READYFrom') = 1) and
 | ||
|        (PKG_COND_BROKER.CONDITION_EXISTS(SCONDITION_NAME => 'EDCOST_READYTo') = 1)) then
 | ||
|       PKG_COND_BROKER.ADD_CLAUSE(SCLAUSE => 'PKG_P8PANELS_PROJECTS.STAGES_GET_COST_READY(RN) between :EDCOST_READYFrom and :EDCOST_READYTo');
 | ||
|       PKG_COND_BROKER.BIND_VARIABLE(SVARIABLE_NAME => 'EDCOST_READYFrom',
 | ||
|                                     NVALUE         => PKG_COND_BROKER.GET_CONDITION_NUM(SCONDITION_NAME => 'EDCOST_READYFrom'));
 | ||
|       PKG_COND_BROKER.BIND_VARIABLE(SVARIABLE_NAME => 'EDCOST_READYTo',
 | ||
|                                     NVALUE         => PKG_COND_BROKER.GET_CONDITION_NUM(SCONDITION_NAME => 'EDCOST_READYTo'));
 | ||
|     end if;
 | ||
|   end STAGES_COND;
 | ||
|   
 | ||
|   /* Подбор платежей финансирования этапа проекта */
 | ||
|   procedure STAGES_SELECT_FIN
 | ||
|   (
 | ||
|     NPRN                    in number := null, -- Рег. номер проекта (null - не отбирать по проекту)
 | ||
|     NRN                     in number := null, -- Рег. номер этапа проекта (null - не отбирать по этапу)
 | ||
|     NDIRECTION              in number,         -- Направление (0 - приход, 1 - расход)
 | ||
|     NIDENT                  out number         -- Идентификатор буфера подобранных (списка отмеченных записей, null - не найдено)
 | ||
|   )
 | ||
|   is
 | ||
|     NSELECTLIST             PKG_STD.TREF;      -- Рег. номер добавленной записи буфера подобранных
 | ||
|   begin
 | ||
|     /* Подберём платежи */
 | ||
|     for C in (select PN.COMPANY,
 | ||
|                      PN.RN
 | ||
|                 from PAYNOTES PN,
 | ||
|                      DICTOPER O
 | ||
|                where PN.COMPANY in (select PS.COMPANY
 | ||
|                                       from PROJECTSTAGE PS
 | ||
|                                      where ((NRN is null) or ((NRN is not null) and (PS.RN = NRN)))
 | ||
|                                        and ((NPRN is null) or ((NPRN is not null) and (PS.PRN = NPRN))))
 | ||
|                  and PN.SIGNPLAN = 0
 | ||
|                  and PN.FINOPER = O.RN
 | ||
|                  and O.TYPOPER_DIRECT = NDIRECTION
 | ||
|                  and exists (select PNC.RN
 | ||
|                         from PAYNOTESCLC  PNC,
 | ||
|                              PROJECTSTAGE PS
 | ||
|                        where PNC.PRN = PN.RN
 | ||
|                          and PNC.FACEACCOUNT = PS.FACEACC
 | ||
|                          and exists (select null from V_USERPRIV UP where UP.CATALOG = PS.CRN)
 | ||
|                          and exists (select null
 | ||
|                                 from V_USERPRIV UP
 | ||
|                                where UP.JUR_PERS = PS.JUR_PERS
 | ||
|                                  and UP.UNITCODE = 'Projects')
 | ||
|                          and ((NRN is null) or ((NRN is not null) and (PS.RN = NRN)))
 | ||
|                          and ((NPRN is null) or ((NPRN is not null) and (PS.PRN = NPRN))))
 | ||
|                  and exists (select /*+ INDEX(UP I_USERPRIV_CATALOG_ROLEID) */
 | ||
|                        null
 | ||
|                         from USERPRIV UP
 | ||
|                        where UP.CATALOG = PN.CRN
 | ||
|                          and UP.ROLEID in (select /*+ INDEX(UR I_USERROLES_AUTHID_FK) */
 | ||
|                                             UR.ROLEID
 | ||
|                                              from USERROLES UR
 | ||
|                                             where UR.AUTHID = UTILIZER)
 | ||
|                       union all
 | ||
|                       select /*+ INDEX(UP I_USERPRIV_CATALOG_AUTHID) */
 | ||
|                        null
 | ||
|                         from USERPRIV UP
 | ||
|                        where UP.CATALOG = PN.CRN
 | ||
|                          and UP.AUTHID = UTILIZER)
 | ||
|                  and exists (select /*+ INDEX(UP I_USERPRIV_JUR_PERS_ROLEID) */
 | ||
|                        null
 | ||
|                         from USERPRIV UP
 | ||
|                        where UP.JUR_PERS = PN.JUR_PERS
 | ||
|                          and UP.UNITCODE = 'PayNotes'
 | ||
|                          and UP.ROLEID in (select /*+ INDEX(UR I_USERROLES_AUTHID_FK) */
 | ||
|                                             UR.ROLEID
 | ||
|                                              from USERROLES UR
 | ||
|                                             where UR.AUTHID = UTILIZER)
 | ||
|                       union all
 | ||
|                       select /*+ INDEX(UP I_USERPRIV_JUR_PERS_AUTHID) */
 | ||
|                        null
 | ||
|                         from USERPRIV UP
 | ||
|                        where UP.JUR_PERS = PN.JUR_PERS
 | ||
|                          and UP.UNITCODE = 'PayNotes'
 | ||
|                          and UP.AUTHID = UTILIZER))
 | ||
|     loop
 | ||
|       /* Сформируем идентификатор буфера */
 | ||
|       if (NIDENT is null) then
 | ||
|         NIDENT := GEN_IDENT();
 | ||
|       end if;
 | ||
|       /* Добавим подобранное в список отмеченных записей */
 | ||
|       P_SELECTLIST_BASE_INSERT(NIDENT       => NIDENT,
 | ||
|                                NCOMPANY     => C.COMPANY,
 | ||
|                                NDOCUMENT    => C.RN,
 | ||
|                                SUNITCODE    => 'PayNotes',
 | ||
|                                SACTIONCODE  => null,
 | ||
|                                NCRN         => null,
 | ||
|                                NDOCUMENT1   => null,
 | ||
|                                SUNITCODE1   => null,
 | ||
|                                SACTIONCODE1 => null,
 | ||
|                                NRN          => NSELECTLIST);
 | ||
|     end loop;
 | ||
|   end STAGES_SELECT_FIN;
 | ||
|   
 | ||
|   /* Получение суммы финансирования этапа проекта */
 | ||
|   function STAGES_GET_FIN
 | ||
|   (
 | ||
|     NRN                     in number,       -- Рег. номер этапа проекта
 | ||
|     NDIRECTION              in number        -- Направление (0 - приход, 1 - расход)
 | ||
|   ) return                  number           -- Сумма финансирования проекта
 | ||
|   is
 | ||
|     NRES                    PKG_STD.TNUMBER; -- Буфер для рузультата
 | ||
|   begin
 | ||
|     /* Суммируем фактические платежи нужного направления по лицевому счёту затрат этапа */
 | ||
|     select COALESCE(sum(PN.PAY_SUM * (PN.CURR_RATE_BASE / PN.CURR_RATE)), 0)
 | ||
|       into NRES
 | ||
|       from PAYNOTES PN,
 | ||
|            DICTOPER O
 | ||
|      where PN.COMPANY in (select PS.COMPANY from PROJECTSTAGE PS where PS.RN = NRN)
 | ||
|        and PN.SIGNPLAN = 0
 | ||
|        and PN.FINOPER = O.RN
 | ||
|        and O.TYPOPER_DIRECT = NDIRECTION
 | ||
|        and exists (select PNC.RN
 | ||
|               from PAYNOTESCLC  PNC,
 | ||
|                    PROJECTSTAGE PS
 | ||
|              where PNC.PRN = PN.RN
 | ||
|                and PNC.FACEACCOUNT = PS.FACEACC
 | ||
|                and PS.RN = NRN);
 | ||
|     /* Возвращаем результат */
 | ||
|     return NRES;
 | ||
|   end STAGES_GET_FIN;
 | ||
|   
 | ||
|   /* Получение суммы входящего финансирования этапа проекта */
 | ||
|   function STAGES_GET_FIN_IN
 | ||
|   (
 | ||
|     NRN                     in number   -- Рег. номер этапа проекта
 | ||
|   ) return                  number      -- Сумма входящего финансирования проекта
 | ||
|   is
 | ||
|   begin
 | ||
|     return STAGES_GET_FIN(NRN => NRN, NDIRECTION => 0);
 | ||
|   end STAGES_GET_FIN_IN;
 | ||
| 
 | ||
|   /* Получение суммы исходящего финансирования этапа проекта */
 | ||
|   function STAGES_GET_FIN_OUT
 | ||
|   (
 | ||
|     NRN                     in number   -- Рег. номер этапа проекта
 | ||
|   ) return                  number      -- Сумма исходяшего финансирования проекта
 | ||
|   is
 | ||
|   begin
 | ||
|     return STAGES_GET_FIN(NRN => NRN, NDIRECTION => 1);
 | ||
|   end STAGES_GET_FIN_OUT;
 | ||
| 
 | ||
|   /* Получение состояния финансирования этапа проекта */
 | ||
|   function STAGES_GET_CTRL_FIN
 | ||
|   (
 | ||
|     NRN                     in number            -- Рег. номер этапа проекта
 | ||
|   ) return                  number               -- Состояние (null - не определено, 0 - без отклонений, 1 - есть отклонения)
 | ||
|   is
 | ||
|     NCONTR_CTRL             PKG_STD.TNUMBER;     -- Состояние соисполнителя этапа
 | ||
|     NCNT_CONTR              PKG_STD.TNUMBER :=0; -- Количество соисполнителей этапа
 | ||
|     NCNT_NULL               PKG_STD.TNUMBER :=0; -- Количество "безконтрольных" соисполнителей этапа
 | ||
|   begin
 | ||
|     /* Обходим соисполнителей этапа */
 | ||
|     for C in (select PSPF.RN from PROJECTSTAGEPF PSPF where PSPF.PRN = NRN)
 | ||
|     loop
 | ||
|       /* Увеличим счётчик соисполнителей */
 | ||
|       NCNT_CONTR := NCNT_CONTR + 1;
 | ||
|       /* Получим состояние соисполнителя */
 | ||
|       NCONTR_CTRL := STAGE_CONTRACTS_GET_CTRL_FIN(NPROJECTSTAGEPF => C.RN);
 | ||
|       /* Подсчитаем количество "безконтрольных" */
 | ||
|       if (NCONTR_CTRL is null) then
 | ||
|         NCNT_NULL := NCNT_NULL + 1;
 | ||
|       end if;
 | ||
|       /* Если у соисполнителя есть отклонение - оно есть и у этапа */
 | ||
|       if (NCONTR_CTRL = 1) then
 | ||
|         return 1;
 | ||
|       end if;
 | ||
|     end loop;
 | ||
|     /* Если ни один соисполнитель не подлежит контролю - то и состояние жтапа тоже */
 | ||
|     if (NCNT_NULL = NCNT_CONTR) then
 | ||
|       return null;
 | ||
|     end if;
 | ||
|     /* Если мы здесь - отклонений нет */
 | ||
|     if (NCNT_CONTR > 0) then
 | ||
|       return 0;
 | ||
|     else
 | ||
|       /* Нет соисполнителей и нет контроля */
 | ||
|       return null;
 | ||
|     end if;
 | ||
|   end STAGES_GET_CTRL_FIN;
 | ||
| 
 | ||
|   /* Получение состояния контрактации этапа проекта */
 | ||
|   function STAGES_GET_CTRL_CONTR
 | ||
|   (
 | ||
|     NRN                     in number             -- Рег. номер этапа проекта
 | ||
|   ) return                  number                -- Состояние (null - не определено, 0 - без отклонений, 1 - есть отклонения)
 | ||
|   is
 | ||
|     RSTAGE_ARTS             TSTAGE_ARTS;          -- Сведения о контрактации по статьям этапа
 | ||
|     NCNT_NULL               PKG_STD.TNUMBER := 0; -- Количество статей с неопределённым состоянием
 | ||
|   begin
 | ||
|     /* Получим сведения о контрактации по статьям */
 | ||
|     STAGE_ARTS_GET(NSTAGE => NRN, NINC_CONTR => 1, RSTAGE_ARTS => RSTAGE_ARTS);
 | ||
|     /* Если сведения есть - будем разбираться */
 | ||
|     if ((RSTAGE_ARTS is not null) and (RSTAGE_ARTS.COUNT > 0)) then
 | ||
|       for I in RSTAGE_ARTS.FIRST .. RSTAGE_ARTS.LAST
 | ||
|       loop
 | ||
|         if (RSTAGE_ARTS(I).NCTRL_CONTR is null) then
 | ||
|           NCNT_NULL := NCNT_NULL + 1;
 | ||
|         end if;
 | ||
|         /* Если хоть одна статья имеет отклонения */
 | ||
|         if (RSTAGE_ARTS(I).NCTRL_CONTR = 1) then
 | ||
|           /* То и этап имеет отклонение */
 | ||
|           return 1;
 | ||
|         end if;
 | ||
|       end loop;
 | ||
|       /* Если ни одна статья не подлежит контролю - то и состояние этапа тоже */
 | ||
|       if (NCNT_NULL = RSTAGE_ARTS.COUNT) then
 | ||
|         return null;
 | ||
|       end if;
 | ||
|       /* Если мы здесь - отклонений нет */
 | ||
|       return 0;
 | ||
|     else
 | ||
|       /* Нет данных по статьям */
 | ||
|       return null;
 | ||
|     end if;
 | ||
|   end STAGES_GET_CTRL_CONTR;
 | ||
| 
 | ||
|   /* Получение состояния соисполнения этапа проекта */
 | ||
|   function STAGES_GET_CTRL_COEXEC
 | ||
|   (
 | ||
|     NRN                     in number            -- Рег. номер этапа проекта
 | ||
|   ) return                  number               -- Состояние (null - не определено, 0 - без отклонений, 1 - есть отклонения)
 | ||
|   is
 | ||
|     NCONTR_CTRL             PKG_STD.TNUMBER;     -- Состояние соисполнителя этапа
 | ||
|     NCNT_CONTR              PKG_STD.TNUMBER :=0; -- Количество соисполнителей этапа
 | ||
|     NCNT_NULL               PKG_STD.TNUMBER :=0; -- Количество "безконтрольных" соисполнителей этапа
 | ||
|   begin
 | ||
|     /* Обходим соисполнителей этапа */
 | ||
|     for C in (select PSPF.RN from PROJECTSTAGEPF PSPF where PSPF.PRN = NRN)
 | ||
|     loop
 | ||
|       /* Увеличим счётчик соисполнителей */
 | ||
|       NCNT_CONTR := NCNT_CONTR + 1;
 | ||
|       /* Получим состояние соисполнителя */
 | ||
|       NCONTR_CTRL := STAGE_CONTRACTS_GET_CTRL_COEXE(NPROJECTSTAGEPF => C.RN);
 | ||
|       /* Подсчитаем количество "безконтрольных" */
 | ||
|       if (NCONTR_CTRL is null) then
 | ||
|         NCNT_NULL := NCNT_NULL + 1;
 | ||
|       end if;
 | ||
|       /* Если у соисполнителя есть отклонение - оно есть и у этапа */
 | ||
|       if (NCONTR_CTRL = 1) then
 | ||
|         return 1;
 | ||
|       end if;
 | ||
|     end loop;
 | ||
|     /* Если ни один соисполнитель не подлежит контролю - то и состояние жтапа тоже */
 | ||
|     if (NCNT_NULL = NCNT_CONTR) then
 | ||
|       return null;
 | ||
|     end if;
 | ||
|     /* Если мы здесь - отклонений нет */
 | ||
|     if (NCNT_CONTR > 0) then
 | ||
|       return 0;
 | ||
|     else
 | ||
|       /* Нет соисполнителей и нет контроля */
 | ||
|       return null;
 | ||
|     end if;
 | ||
|   end STAGES_GET_CTRL_COEXEC;
 | ||
|   
 | ||
|   /* Получение состояния сроков этапа проекта */
 | ||
|   function STAGES_GET_CTRL_PERIOD
 | ||
|   (
 | ||
|     NRN                     in number        -- Рег. номер этапа проекта
 | ||
|   ) return                  number           -- Состояние (null - не определено, 0 - без отклонений, 1 - есть отклонения)
 | ||
|   is
 | ||
|     NDAYS_LEFT              PKG_STD.TNUMBER; -- Остаток дней до завершения этапа
 | ||
|   begin
 | ||
|     /* Получим количество дней до завершения */
 | ||
|     NDAYS_LEFT := STAGES_GET_DAYS_LEFT(NRN => NRN);
 | ||
|     /* Если мы не знаем количества дней - то не можем и контролировать */
 | ||
|     if (NDAYS_LEFT is null) then
 | ||
|       return null;
 | ||
|     end if;
 | ||
|     /* Если осталось меньше определённого лимита */
 | ||
|     if (NDAYS_LEFT < NDAYS_LEFT_LIMIT) then
 | ||
|       /* На это необходимо обратить внимание */
 | ||
|       return 1;
 | ||
|     else
 | ||
|       /* Отклонений нет */
 | ||
|       return 0;
 | ||
|     end if;
 | ||
|   end STAGES_GET_CTRL_PERIOD;
 | ||
|   
 | ||
|   /* Получение состояния затрат этапа проекта */
 | ||
|   function STAGES_GET_CTRL_COST
 | ||
|   (
 | ||
|     NRN                     in number             -- Рег. номер этапа проекта
 | ||
|   ) return                  number                -- Состояние (null - не определено, 0 - без отклонений, 1 - есть отклонения)
 | ||
|   is
 | ||
|     RSTAGE_ARTS             TSTAGE_ARTS;          -- Сведения о затратах по статьям этапа
 | ||
|     NCNT_NULL               PKG_STD.TNUMBER := 0; -- Количество статей с неопределённым состоянием
 | ||
|   begin
 | ||
|     /* Получим сведения о затратах по статьям */
 | ||
|     STAGE_ARTS_GET(NSTAGE => NRN, NINC_COST => 1, RSTAGE_ARTS => RSTAGE_ARTS);
 | ||
|     /* Если сведения есть - будем разбираться */
 | ||
|     if ((RSTAGE_ARTS is not null) and (RSTAGE_ARTS.COUNT > 0)) then
 | ||
|       for I in RSTAGE_ARTS.FIRST .. RSTAGE_ARTS.LAST
 | ||
|       loop
 | ||
|         if (RSTAGE_ARTS(I).NCTRL_COST is null) then
 | ||
|           NCNT_NULL := NCNT_NULL + 1;
 | ||
|         end if;
 | ||
|         /* Если хоть одна статья имеет отклонения */
 | ||
|         if (RSTAGE_ARTS(I).NCTRL_COST = 1) then
 | ||
|           /* То и этап имеет отклонение */
 | ||
|           return 1;
 | ||
|         end if;
 | ||
|       end loop;
 | ||
|       /* Если ни одна статья не подлежит контролю - то и состояние этапа тоже */
 | ||
|       if (NCNT_NULL = RSTAGE_ARTS.COUNT) then
 | ||
|         return null;
 | ||
|       end if;
 | ||
|       /* Если мы здесь - отклонений нет */
 | ||
|       return 0;
 | ||
|     else
 | ||
|       /* Нет данных по статьям */
 | ||
|       return null;
 | ||
|     end if;
 | ||
|   end STAGES_GET_CTRL_COST;
 | ||
|   
 | ||
|   /* Получение состояния актирования этапа проекта */
 | ||
|   function STAGES_GET_CTRL_ACT
 | ||
|   (
 | ||
|     NRN                     in number             -- Рег. номер этапа проекта
 | ||
|   ) return                  number                -- Состояние (null - не определено, 0 - без отклонений, 1 - есть отклонения)
 | ||
|   is
 | ||
|     RPS                     PROJECTSTAGE%rowtype; -- Запись этапа проекта
 | ||
|     NTRANSINVCUST           PKG_STD.TREF;         -- Рег. номер РНОПотр, закрывающей этап
 | ||
|   begin
 | ||
|     /* Читаем запись этапа */
 | ||
|     RPS := STAGES_GET(NRN => NRN);
 | ||
|     /* Если этап не в состоянии "Закрыт", то нечего контролировать */
 | ||
|     if (RPS.STATE <> 2) then
 | ||
|       return null;
 | ||
|     end if;
 | ||
|     /* Проверяем наличие подписанного аката */
 | ||
|     begin
 | ||
|       select T.RN
 | ||
|         into NTRANSINVCUST
 | ||
|         from TRANSINVCUST T
 | ||
|        where T.FACEACC = RPS.FACEACCCUST
 | ||
|          and T.STATUS = 1
 | ||
|          and exists (select null
 | ||
|                 from TRINVCUSTCLC TC
 | ||
|                where TC.PRN in (select TS.RN from TRANSINVCUSTSPECS TS where TS.PRN = T.RN)
 | ||
|                  and TC.FACEACCOUNT = RPS.FACEACC);
 | ||
|     exception
 | ||
|       when NO_DATA_FOUND then
 | ||
|         null;
 | ||
|     end;
 | ||
|     /* Если мы здесь, значит этап "Закрыт", если нет закрывающего акта с заказчиком - это отклонение */
 | ||
|     if (NTRANSINVCUST is null) then
 | ||
|       return 1;
 | ||
|     end if;
 | ||
|     /* Все проверки пройдены - отклонений нет */
 | ||
|     return 0;
 | ||
|   end STAGES_GET_CTRL_ACT;
 | ||
|   
 | ||
|   /* Получение остатка срока исполнения этапа проекта */
 | ||
|   function STAGES_GET_DAYS_LEFT
 | ||
|   (
 | ||
|     NRN                     in number             -- Рег. номер этапа проекта
 | ||
|   ) return                  number                -- Количество дней (null - не определено)
 | ||
|   is
 | ||
|     RSTG                    PROJECTSTAGE%rowtype; -- Запись этапа
 | ||
|   begin
 | ||
|     /* Считаем этап */
 | ||
|     RSTG := STAGES_GET(NRN => NRN);
 | ||
|     /* Вернём остаток дней */
 | ||
|     if (RSTG.ENDPLAN is not null) then
 | ||
|       return RSTG.ENDPLAN - sysdate;
 | ||
|     else
 | ||
|       return null;
 | ||
|     end if;
 | ||
|   end STAGES_GET_DAYS_LEFT;
 | ||
|   
 | ||
|   /* Подбор записей журнала затрат этапа проекта */
 | ||
|   procedure STAGES_SELECT_COST_FACT
 | ||
|   (
 | ||
|     NRN                     in number,  -- Рег. номер этапа проекта
 | ||
|     NIDENT                  out number  -- Идентификатор буфера подобранных (списка отмеченных записей, null - не найдено)
 | ||
|   )
 | ||
|   is
 | ||
|   begin
 | ||
|     STAGE_ARTS_SELECT_COST_FACT(NSTAGE => NRN, NFINFLOW_TYPE => 2, NIDENT => NIDENT);
 | ||
|   end STAGES_SELECT_COST_FACT;
 | ||
|   
 | ||
|   /* Получение суммы фактических затрат этапа проекта */
 | ||
|   function STAGES_GET_COST_FACT
 | ||
|   (
 | ||
|     NRN                     in number   -- Рег. номер этапа проекта
 | ||
|   ) return                  number      -- Сумма фактических затрат
 | ||
|   is
 | ||
|   begin
 | ||
|     return STAGE_ARTS_GET_COST_FACT(NSTAGE => NRN, NFINFLOW_TYPE => 2);
 | ||
|   end STAGES_GET_COST_FACT;
 | ||
|     
 | ||
|   /* Подбор записей расходных накладных на отпуск потребителям этапа проекта */
 | ||
|   procedure STAGES_SELECT_SUMM_REALIZ
 | ||
|   (
 | ||
|     NRN                     in number,            -- Рег. номер этапа проекта
 | ||
|     NIDENT                  out number            -- Идентификатор буфера подобранных (списка отмеченных записей, null - не найдено)
 | ||
|   )
 | ||
|   is
 | ||
|     RSTG                    PROJECTSTAGE%rowtype; -- Запись этапа
 | ||
|     NSELECTLIST             PKG_STD.TREF;         -- Рег. номер добавленной записи буфера подобранных
 | ||
|   begin
 | ||
|     /* Читаем этап */
 | ||
|     RSTG := STAGES_GET(NRN => NRN);
 | ||
|     /* Подберём расходные накладные на отпуск потребителям */
 | ||
|     for C in (select T.COMPANY,
 | ||
|                      T.RN
 | ||
|                 from TRANSINVCUST T
 | ||
|                where T.STATUS = 1
 | ||
|                  and T.COMPANY = RSTG.COMPANY
 | ||
|                  and T.FACEACC = RSTG.FACEACCCUST
 | ||
|                  and exists (select TC.RN
 | ||
|                         from TRANSINVCUSTSPECS TS,
 | ||
|                              TRINVCUSTCLC      TC
 | ||
|                        where TS.PRN = T.RN
 | ||
|                          and TC.PRN = TS.RN
 | ||
|                          and TC.FACEACCOUNT = RSTG.FACEACC
 | ||
|                          and exists (select null from V_USERPRIV UP where UP.CATALOG = RSTG.CRN)
 | ||
|                          and exists (select null
 | ||
|                                 from V_USERPRIV UP
 | ||
|                                where UP.JUR_PERS = RSTG.JUR_PERS
 | ||
|                                  and UP.UNITCODE = 'Projects'))
 | ||
|                  and exists (select /*+ INDEX(UP I_USERPRIV_CATALOG_ROLEID) */
 | ||
|                        null
 | ||
|                         from USERPRIV UP
 | ||
|                        where UP.CATALOG = T.CRN
 | ||
|                          and UP.ROLEID in (select /*+ INDEX(UR I_USERROLES_AUTHID_FK) */
 | ||
|                                             UR.ROLEID
 | ||
|                                              from USERROLES UR
 | ||
|                                             where UR.AUTHID = UTILIZER)
 | ||
|                       union all
 | ||
|                       select /*+ INDEX(UP I_USERPRIV_CATALOG_AUTHID) */
 | ||
|                        null
 | ||
|                         from USERPRIV UP
 | ||
|                        where UP.CATALOG = T.CRN
 | ||
|                          and UP.AUTHID = UTILIZER))
 | ||
|     loop
 | ||
|       /* Сформируем идентификатор буфера */
 | ||
|       if (NIDENT is null) then
 | ||
|         NIDENT := GEN_IDENT();
 | ||
|       end if;
 | ||
|       /* Добавим подобранное в список отмеченных записей */
 | ||
|       P_SELECTLIST_BASE_INSERT(NIDENT       => NIDENT,
 | ||
|                                NCOMPANY     => C.COMPANY,
 | ||
|                                NDOCUMENT    => C.RN,
 | ||
|                                SUNITCODE    => 'GoodsTransInvoicesToConsumers',
 | ||
|                                SACTIONCODE  => null,
 | ||
|                                NCRN         => null,
 | ||
|                                NDOCUMENT1   => null,
 | ||
|                                SUNITCODE1   => null,
 | ||
|                                SACTIONCODE1 => null,
 | ||
|                                NRN          => NSELECTLIST);
 | ||
|     end loop;
 | ||
|   end STAGES_SELECT_SUMM_REALIZ;
 | ||
|   
 | ||
|   /* Получение суммы реализации этапа проекта */
 | ||
|   function STAGES_GET_SUMM_REALIZ
 | ||
|   (
 | ||
|     NRN                     in number,  -- Рег. номер этапа проекта
 | ||
|     NFPDARTCL_REALIZ        in number   -- Рег. номер статьи калькуляции для реализации
 | ||
|   ) return                  number      -- Сумма реализации
 | ||
|   is
 | ||
|   begin
 | ||
|     if (NFPDARTCL_REALIZ is not null) then
 | ||
|       return STAGE_ARTS_GET_COST_FACT(NSTAGE => NRN, NFPDARTCL => NFPDARTCL_REALIZ);
 | ||
|     else
 | ||
|       return 0;
 | ||
|     end if;
 | ||
|   end STAGES_GET_SUMM_REALIZ;
 | ||
|     
 | ||
|   /* Получение % готовности этапа проекта (по затратам) */
 | ||
|   function STAGES_GET_COST_READY
 | ||
|   (
 | ||
|     NRN                     in number             -- Рег. номер этапа проекта
 | ||
|   ) return                  number                -- % готовности
 | ||
|   is
 | ||
|     RSTG                    PROJECTSTAGE%rowtype; -- Запись этапа
 | ||
|     NFPDARTCL_SELF_COST     PKG_STD.TREF;         -- Рег. номер статьи себестоимости
 | ||
|     NCOST_FACT              PKG_STD.TNUMBER;      -- Сумма фактических затрат
 | ||
|     RSELF_COST_PLAN         TSTAGE_ARTS;          -- Плановая себестоимость
 | ||
|     NRES                    PKG_STD.TNUMBER := 0; -- Буфер для результата
 | ||
|   begin
 | ||
|     /* Читаем этап */
 | ||
|     RSTG := STAGES_GET(NRN => NRN);
 | ||
|     /* Определим рег. номер статьи калькуляции для учёта себестоимости */
 | ||
|     FIND_FPDARTCL_CODE(NFLAG_SMART => 1,
 | ||
|                        NCOMPANY    => RSTG.COMPANY,
 | ||
|                        SCODE       => SFPDARTCL_SELF_COST,
 | ||
|                        NRN         => NFPDARTCL_SELF_COST);
 | ||
|     /* Опеределим сумму фактических затрат */
 | ||
|     NCOST_FACT := STAGES_GET_COST_FACT(NRN => RSTG.RN);
 | ||
|     /* Определим плановую себестоимость */
 | ||
|     STAGE_ARTS_GET(NSTAGE => RSTG.RN, NFPDARTCL => NFPDARTCL_SELF_COST, RSTAGE_ARTS => RSELF_COST_PLAN);
 | ||
|     /* Если есть и фактические затраты и найдена плановая себестоимость */
 | ||
|     if ((NCOST_FACT > 0) and (RSELF_COST_PLAN.COUNT = 1) and (RSELF_COST_PLAN(RSELF_COST_PLAN.LAST).NPLAN <> 0)) then
 | ||
|       /* Отношение фактических затрат к плановой себестоимость - искомый % готовности */
 | ||
|       NRES := ROUND(NCOST_FACT / RSELF_COST_PLAN(RSELF_COST_PLAN.LAST).NPLAN * 100, 0);
 | ||
|       /* Если затраты превысили себестоимость, то % может быть > 100, но это бессмысленно, откорректируем ситуацию */
 | ||
|       if (NRES > 100) then
 | ||
|         NRES := 100;
 | ||
|       end if;
 | ||
|     end if;
 | ||
|     /* Вернём рассчитанное */
 | ||
|     return NRES;
 | ||
|   end STAGES_GET_COST_READY;
 | ||
|   
 | ||
|   /* Список этапов */
 | ||
|   procedure STAGES_LIST
 | ||
|   (
 | ||
|     NPRN                    in number,                             -- Рег. номер проекта
 | ||
|     NPAGE_NUMBER            in number,                             -- Номер страницы (игнорируется при NPAGE_SIZE=0)
 | ||
|     NPAGE_SIZE              in number,                             -- Количество записей на странице (0 - все)
 | ||
|     CFILTERS                in clob,                               -- Фильтры
 | ||
|     CORDERS                 in clob,                               -- Сортировки
 | ||
|     NINCLUDE_DEF            in number,                             -- Признак включения описания колонок таблицы в ответ
 | ||
|     COUT                    out clob                               -- Сериализованная таблица данных
 | ||
|   )
 | ||
|   is
 | ||
|     NCOMPANY                PKG_STD.TREF := GET_SESSION_COMPANY(); -- Организация сеанса
 | ||
|     NIDENT                  PKG_STD.TREF := GEN_IDENT();           -- Идентификатор отбора
 | ||
|     RF                      PKG_P8PANELS_VISUAL.TFILTERS;          -- Фильтры
 | ||
|     RO                      PKG_P8PANELS_VISUAL.TORDERS;           -- Сортировки
 | ||
|     RDG                     PKG_P8PANELS_VISUAL.TDATA_GRID;        -- Описание таблицы
 | ||
|     RDG_ROW                 PKG_P8PANELS_VISUAL.TROW;              -- Строка таблицы
 | ||
|     RCOL_VALS               PKG_P8PANELS_VISUAL.TCOL_VALS;         -- Предопределённые значения столбцов
 | ||
|     NROW_FROM               PKG_STD.TREF;                          -- Номер строки с
 | ||
|     NROW_TO                 PKG_STD.TREF;                          -- Номер строки по
 | ||
|     NFPDARTCL_REALIZ        PKG_STD.TREF;                          -- Рег. номер статьи калькуляции для реализации
 | ||
|     CSQL                    clob;                                  -- Буфер для запроса
 | ||
|     ICURSOR                 integer;                               -- Курсор для исполнения запроса
 | ||
|     NCOST_FACT              PKG_STD.TNUMBER;                       -- Сумма фактических затрат по этапу проекта
 | ||
|     NSUMM_REALIZ            PKG_STD.TNUMBER;                       -- Сумма реализации по этапу проекта
 | ||
|     NSUMM_INCOME            PKG_STD.TNUMBER;                       -- Сумма прибыли по этапу проекта
 | ||
|     NINCOME_PRC             PKG_STD.TNUMBER;                       -- Процент прибыли по этапу проекта
 | ||
|   begin
 | ||
|     /* Определим рег. номер статьи калькуляции для учёта реализации */    
 | ||
|     FIND_FPDARTCL_CODE(NFLAG_SMART => 1, NCOMPANY => NCOMPANY, SCODE => SFPDARTCL_REALIZ, NRN => NFPDARTCL_REALIZ);
 | ||
|     /* Читаем фильтры */
 | ||
|     RF := PKG_P8PANELS_VISUAL.TFILTERS_FROM_XML(CFILTERS => CFILTERS);
 | ||
|     /* Читем сортировки */
 | ||
|     RO := PKG_P8PANELS_VISUAL.TORDERS_FROM_XML(CORDERS => CORDERS);
 | ||
|     /* Преобразуем номер и размер страницы в номер строк с и по */
 | ||
|     PKG_P8PANELS_VISUAL.UTL_ROWS_LIMITS_CALC(NPAGE_NUMBER => NPAGE_NUMBER,
 | ||
|                                              NPAGE_SIZE   => NPAGE_SIZE,
 | ||
|                                              NROW_FROM    => NROW_FROM,
 | ||
|                                              NROW_TO      => NROW_TO);
 | ||
|     /* Инициализируем таблицу данных */
 | ||
|     RDG := PKG_P8PANELS_VISUAL.TDATA_GRID_MAKE();
 | ||
|     /* Добавляем в таблицу описание колонок */
 | ||
|     PKG_P8PANELS_VISUAL.TDATA_GRID_ADD_COL_DEF(RDATA_GRID => RDG,
 | ||
|                                                SNAME      => 'NRN',
 | ||
|                                                SCAPTION   => 'Рег. номер',
 | ||
|                                                SDATA_TYPE => PKG_P8PANELS_VISUAL.SDATA_TYPE_NUMB,
 | ||
|                                                BVISIBLE   => false);
 | ||
|     PKG_P8PANELS_VISUAL.TDATA_GRID_ADD_COL_DEF(RDATA_GRID => RDG,
 | ||
|                                                SNAME      => 'SNUMB',
 | ||
|                                                SCAPTION   => 'Номер',
 | ||
|                                                SDATA_TYPE => PKG_P8PANELS_VISUAL.SDATA_TYPE_STR,
 | ||
|                                                SCOND_FROM => 'EDNUMB',
 | ||
|                                                BORDER     => true,
 | ||
|                                                BFILTER    => true);
 | ||
|     PKG_P8PANELS_VISUAL.TDATA_GRID_ADD_COL_DEF(RDATA_GRID => RDG,
 | ||
|                                                SNAME      => 'SNAME',
 | ||
|                                                SCAPTION   => 'Наименование',
 | ||
|                                                SDATA_TYPE => PKG_P8PANELS_VISUAL.SDATA_TYPE_STR,
 | ||
|                                                SCOND_FROM => 'EDNAME',
 | ||
|                                                BORDER     => true,
 | ||
|                                                BFILTER    => true);
 | ||
|     PKG_P8PANELS_VISUAL.TDATA_GRID_ADD_COL_DEF(RDATA_GRID => RDG,
 | ||
|                                                SNAME      => 'SEXPECTED_RES',
 | ||
|                                                SCAPTION   => 'Ожидаемые результаты',
 | ||
|                                                SDATA_TYPE => PKG_P8PANELS_VISUAL.SDATA_TYPE_STR,
 | ||
|                                                BVISIBLE   => false);
 | ||
|     PKG_P8PANELS_VISUAL.TDATA_GRID_ADD_COL_DEF(RDATA_GRID => RDG,
 | ||
|                                                SNAME      => 'SFACEACC',
 | ||
|                                                SCAPTION   => 'Шифр затрат',
 | ||
|                                                SDATA_TYPE => PKG_P8PANELS_VISUAL.SDATA_TYPE_STR,
 | ||
|                                                BVISIBLE   => false);
 | ||
|     PKG_P8PANELS_VISUAL.TCOL_VALS_ADD(RCOL_VALS => RCOL_VALS, NVALUE => 0, BCLEAR => true);
 | ||
|     PKG_P8PANELS_VISUAL.TCOL_VALS_ADD(RCOL_VALS => RCOL_VALS, NVALUE => 1);
 | ||
|     PKG_P8PANELS_VISUAL.TCOL_VALS_ADD(RCOL_VALS => RCOL_VALS, NVALUE => 2);
 | ||
|     PKG_P8PANELS_VISUAL.TCOL_VALS_ADD(RCOL_VALS => RCOL_VALS, NVALUE => 3);
 | ||
|     PKG_P8PANELS_VISUAL.TCOL_VALS_ADD(RCOL_VALS => RCOL_VALS, NVALUE => 4);
 | ||
|     PKG_P8PANELS_VISUAL.TCOL_VALS_ADD(RCOL_VALS => RCOL_VALS, NVALUE => 5);
 | ||
|     PKG_P8PANELS_VISUAL.TDATA_GRID_ADD_COL_DEF(RDATA_GRID => RDG,
 | ||
|                                                SNAME      => 'NSTATE',
 | ||
|                                                SCAPTION   => 'Состояние',
 | ||
|                                                SDATA_TYPE => PKG_P8PANELS_VISUAL.SDATA_TYPE_NUMB,
 | ||
|                                                SCOND_FROM => 'CGSTATE',
 | ||
|                                                BORDER     => true,
 | ||
|                                                BFILTER    => true,
 | ||
|                                                RCOL_VALS  => RCOL_VALS);
 | ||
|     PKG_P8PANELS_VISUAL.TDATA_GRID_ADD_COL_DEF(RDATA_GRID => RDG,
 | ||
|                                                SNAME      => 'DBEGPLAN',
 | ||
|                                                SCAPTION   => 'Дата начала',
 | ||
|                                                SDATA_TYPE => PKG_P8PANELS_VISUAL.SDATA_TYPE_DATE,
 | ||
|                                                SCOND_FROM => 'EDPLANBEGFrom',
 | ||
|                                                SCOND_TO   => 'EDPLANBEGTo',
 | ||
|                                                BORDER     => true,
 | ||
|                                                BFILTER    => true);
 | ||
|     PKG_P8PANELS_VISUAL.TDATA_GRID_ADD_COL_DEF(RDATA_GRID => RDG,
 | ||
|                                                SNAME      => 'DENDPLAN',
 | ||
|                                                SCAPTION   => 'Дата окончания',
 | ||
|                                                SDATA_TYPE => PKG_P8PANELS_VISUAL.SDATA_TYPE_DATE,
 | ||
|                                                SCOND_FROM => 'EDPLANENDFrom',
 | ||
|                                                SCOND_TO   => 'EDPLANENDTo',
 | ||
|                                                BORDER     => true,
 | ||
|                                                BFILTER    => true);
 | ||
|     PKG_P8PANELS_VISUAL.TDATA_GRID_ADD_COL_DEF(RDATA_GRID => RDG,
 | ||
|                                                SNAME      => 'NCOST_SUM',
 | ||
|                                                SCAPTION   => 'Стоимость',
 | ||
|                                                SDATA_TYPE => PKG_P8PANELS_VISUAL.SDATA_TYPE_NUMB,
 | ||
|                                                BVISIBLE   => false);
 | ||
|     PKG_P8PANELS_VISUAL.TDATA_GRID_ADD_COL_DEF(RDATA_GRID => RDG,
 | ||
|                                                SNAME      => 'SCURNAMES',
 | ||
|                                                SCAPTION   => 'Валюта',
 | ||
|                                                SDATA_TYPE => PKG_P8PANELS_VISUAL.SDATA_TYPE_STR,
 | ||
|                                                BVISIBLE   => false);
 | ||
|     PKG_P8PANELS_VISUAL.TDATA_GRID_ADD_COL_DEF(RDATA_GRID => RDG,
 | ||
|                                                SNAME      => 'NFIN_IN',
 | ||
|                                                SCAPTION   => 'Входящее финансирование',
 | ||
|                                                SDATA_TYPE => PKG_P8PANELS_VISUAL.SDATA_TYPE_NUMB,
 | ||
|                                                BVISIBLE   => false);
 | ||
|     PKG_P8PANELS_VISUAL.TDATA_GRID_ADD_COL_DEF(RDATA_GRID => RDG,
 | ||
|                                                SNAME      => 'SLNK_UNIT_NFIN_IN',
 | ||
|                                                SCAPTION   => 'Входящее финансирование (код раздела ссылки)',
 | ||
|                                                SDATA_TYPE => PKG_P8PANELS_VISUAL.SDATA_TYPE_STR,
 | ||
|                                                BVISIBLE   => false);
 | ||
|     PKG_P8PANELS_VISUAL.TDATA_GRID_ADD_COL_DEF(RDATA_GRID => RDG,
 | ||
|                                                SNAME      => 'NLNK_DOCUMENT_NFIN_IN',
 | ||
|                                                SCAPTION   => 'Входящее финансирование (документ ссылки)',
 | ||
|                                                SDATA_TYPE => PKG_P8PANELS_VISUAL.SDATA_TYPE_NUMB,
 | ||
|                                                BVISIBLE   => false);
 | ||
|     PKG_P8PANELS_VISUAL.TDATA_GRID_ADD_COL_DEF(RDATA_GRID => RDG,
 | ||
|                                                SNAME      => 'NFIN_OUT',
 | ||
|                                                SCAPTION   => 'Исходящее финансирование',
 | ||
|                                                SDATA_TYPE => PKG_P8PANELS_VISUAL.SDATA_TYPE_NUMB,
 | ||
|                                                BVISIBLE   => false);
 | ||
|     PKG_P8PANELS_VISUAL.TDATA_GRID_ADD_COL_DEF(RDATA_GRID => RDG,
 | ||
|                                                SNAME      => 'SLNK_UNIT_NFIN_OUT',
 | ||
|                                                SCAPTION   => 'Исходящее финансирование (код раздела ссылки)',
 | ||
|                                                SDATA_TYPE => PKG_P8PANELS_VISUAL.SDATA_TYPE_STR,
 | ||
|                                                BVISIBLE   => false);
 | ||
|     PKG_P8PANELS_VISUAL.TDATA_GRID_ADD_COL_DEF(RDATA_GRID => RDG,
 | ||
|                                                SNAME      => 'NLNK_DOCUMENT_NFIN_OUT',
 | ||
|                                                SCAPTION   => 'Исходящее финансирование (документ ссылки)',
 | ||
|                                                SDATA_TYPE => PKG_P8PANELS_VISUAL.SDATA_TYPE_NUMB,
 | ||
|                                                BVISIBLE   => false);
 | ||
|     PKG_P8PANELS_VISUAL.TCOL_VALS_ADD(RCOL_VALS => RCOL_VALS, NVALUE => 0, BCLEAR => true);
 | ||
|     PKG_P8PANELS_VISUAL.TCOL_VALS_ADD(RCOL_VALS => RCOL_VALS, NVALUE => 1);
 | ||
|     PKG_P8PANELS_VISUAL.TDATA_GRID_ADD_COL_DEF(RDATA_GRID => RDG,
 | ||
|                                                SNAME      => 'NCTRL_FIN',
 | ||
|                                                SCAPTION   => 'Фин-е (исх.)',
 | ||
|                                                SDATA_TYPE => PKG_P8PANELS_VISUAL.SDATA_TYPE_NUMB,
 | ||
|                                                SCOND_FROM => 'EDCTRL_FIN',
 | ||
|                                                BORDER     => true,
 | ||
|                                                BFILTER    => true,
 | ||
|                                                RCOL_VALS  => RCOL_VALS,
 | ||
|                                                SHINT      => '<b>Финансирование (исходящее)</b> - контроль оплаты счетов, выставленных соисполнителями по этапу.<br>' ||
 | ||
|                                                              '<b style="color:red">Требует внимания</b> - к этапу привязаны договоры соисполнителей, для которых не все выставленные соисполнителями счета оплачены.<br>' ||
 | ||
|                                                              '<b style="color:green">В норме</b> - нет договоров соисполнения с отклонениями, описанными выше.<br>' ||
 | ||
|                                                              '<b style="color:gray">Пусто</b> - в Системе не хватает данных для рассчёта. Убедитесь, что для этапов задана привязка к договорам с соисполнителями.');
 | ||
|     PKG_P8PANELS_VISUAL.TDATA_GRID_ADD_COL_DEF(RDATA_GRID => RDG,
 | ||
|                                                SNAME      => 'NCTRL_CONTR',
 | ||
|                                                SCAPTION   => 'Контр-я',
 | ||
|                                                SDATA_TYPE => PKG_P8PANELS_VISUAL.SDATA_TYPE_NUMB,
 | ||
|                                                SCOND_FROM => 'EDCTRL_CONTR',
 | ||
|                                                BORDER     => true,
 | ||
|                                                BFILTER    => true,
 | ||
|                                                RCOL_VALS  => RCOL_VALS,
 | ||
|                                                SHINT      => '<b>Контрактация</b> - контроль суммы договоров, заключеных с соисполнителями в рамках этапа.<br>' ||
 | ||
|                                                              '<b style="color:red">Требует внимания</b> - сумма договоров с соисполнителями, привязанных к этапу, превышает заложенные в калькуляцию плановые показатели по сответствующим статьям.<br>' ||
 | ||
|                                                              '<b style="color:green">В норме</b> - нет описанных выше отклонений.<br>' ||
 | ||
|                                                              '<b style="color:gray">Пусто</b> - в Системе не хватает данных для рассчёта. Убедитесь, что для этапа задана калькуляция и для контрагентских статей указаны плановые показатели.');
 | ||
|     PKG_P8PANELS_VISUAL.TDATA_GRID_ADD_COL_DEF(RDATA_GRID => RDG,
 | ||
|                                                SNAME      => 'NCTRL_COEXEC',
 | ||
|                                                SCAPTION   => 'Соисп-е',
 | ||
|                                                SDATA_TYPE => PKG_P8PANELS_VISUAL.SDATA_TYPE_NUMB,
 | ||
|                                                SCOND_FROM => 'EDCTRL_COEXEC',
 | ||
|                                                BORDER     => true,
 | ||
|                                                BFILTER    => true,
 | ||
|                                                RCOL_VALS  => RCOL_VALS,
 | ||
|                                                SHINT      => '<b>Соисполнение</b> - контроль исполнения обязательств по договорам, заключеным с соисполнителями в рамках этапа.<br>' ||
 | ||
|                                                              '<b style="color:red">Требует внимания</b> - до окончания этапа осталось менее ' || TO_CHAR(NDAYS_LEFT_LIMIT) ||
 | ||
|                                                              ' дней, при этом зафиксирован положительный остаток к поставке/актированию по привязанным к нему договорам соисполнителей.<br>' ||
 | ||
|                                                              '<b style="color:green">В норме</b> - нет описанных выше отклонений.<br>' ||
 | ||
|                                                              '<b style="color:gray">Пусто</b> - в Системе не хватает данных для рассчёта. Убедитесь, что для этапа задана привязка к договорам с соисполнителями и плановый срок окончания.');
 | ||
|     PKG_P8PANELS_VISUAL.TDATA_GRID_ADD_COL_DEF(RDATA_GRID => RDG,
 | ||
|                                                SNAME      => 'NDAYS_LEFT',
 | ||
|                                                SCAPTION   => 'Дней до окончания',
 | ||
|                                                SDATA_TYPE => PKG_P8PANELS_VISUAL.SDATA_TYPE_NUMB,
 | ||
|                                                BVISIBLE   => false);
 | ||
|     PKG_P8PANELS_VISUAL.TDATA_GRID_ADD_COL_DEF(RDATA_GRID => RDG,
 | ||
|                                                SNAME      => 'NCTRL_PERIOD',
 | ||
|                                                SCAPTION   => 'Сроки',
 | ||
|                                                SDATA_TYPE => PKG_P8PANELS_VISUAL.SDATA_TYPE_NUMB,
 | ||
|                                                SCOND_FROM => 'EDCTRL_PERIOD',
 | ||
|                                                BORDER     => true,
 | ||
|                                                BFILTER    => true,
 | ||
|                                                RCOL_VALS  => RCOL_VALS,
 | ||
|                                                SHINT      => '<b>Сроки</b> - контроль сроков исполнения работ по этапу.<br>' ||
 | ||
|                                                              '<b style="color:red">Требует внимания</b> - до окончания этапа осталось менее ' || TO_CHAR(NDAYS_LEFT_LIMIT) || ' дней.<br>' ||
 | ||
|                                                              '<b style="color:green">В норме</b> - нет описанных выше отклонений.<br>' ||
 | ||
|                                                              '<b style="color:gray">Пусто</b> - в Системе не хватает данных для рассчёта. Убедитесь, что для этапа задан плановый срок окончания.');
 | ||
|     PKG_P8PANELS_VISUAL.TDATA_GRID_ADD_COL_DEF(RDATA_GRID => RDG,
 | ||
|                                                SNAME      => 'NCOST_FACT',
 | ||
|                                                SCAPTION   => 'Сумма фактических затрат',
 | ||
|                                                SDATA_TYPE => PKG_P8PANELS_VISUAL.SDATA_TYPE_NUMB,
 | ||
|                                                BVISIBLE   => false);
 | ||
|     PKG_P8PANELS_VISUAL.TDATA_GRID_ADD_COL_DEF(RDATA_GRID => RDG,
 | ||
|                                                SNAME      => 'SLNK_UNIT_NCOST_FACT',
 | ||
|                                                SCAPTION   => 'Сумма фактических затрат (код раздела ссылки)',
 | ||
|                                                SDATA_TYPE => PKG_P8PANELS_VISUAL.SDATA_TYPE_STR,
 | ||
|                                                BVISIBLE   => false);
 | ||
|     PKG_P8PANELS_VISUAL.TDATA_GRID_ADD_COL_DEF(RDATA_GRID => RDG,
 | ||
|                                                SNAME      => 'NLNK_DOCUMENT_NCOST_FACT',
 | ||
|                                                SCAPTION   => 'Сумма фактических затрат (документ ссылки)',
 | ||
|                                                SDATA_TYPE => PKG_P8PANELS_VISUAL.SDATA_TYPE_NUMB,
 | ||
|                                                BVISIBLE   => false);
 | ||
|     PKG_P8PANELS_VISUAL.TDATA_GRID_ADD_COL_DEF(RDATA_GRID => RDG,
 | ||
|                                                SNAME      => 'NSUMM_REALIZ',
 | ||
|                                                SCAPTION   => 'Сумма реализации',
 | ||
|                                                SDATA_TYPE => PKG_P8PANELS_VISUAL.SDATA_TYPE_NUMB,
 | ||
|                                                BVISIBLE   => false);                                              
 | ||
|     PKG_P8PANELS_VISUAL.TDATA_GRID_ADD_COL_DEF(RDATA_GRID => RDG,
 | ||
|                                                SNAME      => 'SLNK_UNIT_NSUMM_REALIZ',
 | ||
|                                                SCAPTION   => 'Сумма реализации (код раздела ссылки)',
 | ||
|                                                SDATA_TYPE => PKG_P8PANELS_VISUAL.SDATA_TYPE_STR,
 | ||
|                                                BVISIBLE   => false);
 | ||
|     PKG_P8PANELS_VISUAL.TDATA_GRID_ADD_COL_DEF(RDATA_GRID => RDG,
 | ||
|                                                SNAME      => 'NLNK_DOCUMENT_NSUMM_REALIZ',
 | ||
|                                                SCAPTION   => 'Сумма реализации (документ ссылки)',
 | ||
|                                                SDATA_TYPE => PKG_P8PANELS_VISUAL.SDATA_TYPE_NUMB,
 | ||
|                                                BVISIBLE   => false);
 | ||
|     PKG_P8PANELS_VISUAL.TDATA_GRID_ADD_COL_DEF(RDATA_GRID => RDG,
 | ||
|                                                SNAME      => 'NSUMM_INCOME',
 | ||
|                                                SCAPTION   => 'Сумма прибыли',
 | ||
|                                                SDATA_TYPE => PKG_P8PANELS_VISUAL.SDATA_TYPE_NUMB,
 | ||
|                                                BVISIBLE   => false);
 | ||
|     PKG_P8PANELS_VISUAL.TDATA_GRID_ADD_COL_DEF(RDATA_GRID => RDG,
 | ||
|                                                SNAME      => 'NINCOME_PRC',
 | ||
|                                                SCAPTION   => 'Процент прибыли',
 | ||
|                                                SDATA_TYPE => PKG_P8PANELS_VISUAL.SDATA_TYPE_NUMB,
 | ||
|                                                BVISIBLE   => false);
 | ||
|     PKG_P8PANELS_VISUAL.TDATA_GRID_ADD_COL_DEF(RDATA_GRID => RDG,
 | ||
|                                                SNAME      => 'NCTRL_COST',
 | ||
|                                                SCAPTION   => 'Затраты',
 | ||
|                                                SDATA_TYPE => PKG_P8PANELS_VISUAL.SDATA_TYPE_NUMB,
 | ||
|                                                SCOND_FROM => 'EDCTRL_COST',
 | ||
|                                                BORDER     => true,
 | ||
|                                                BFILTER    => true,
 | ||
|                                                RCOL_VALS  => RCOL_VALS,
 | ||
|                                                SHINT      => '<b>Затраты</b> - контроль затрат, понесённых в ходе выполнения работ по этапу.<br>' ||
 | ||
|                                                              '<b style="color:red">Требует внимания</b> - сумма фактических затрат этапа по некоторым статьям калькуляции превысила плановую.<br>' ||
 | ||
|                                                              '<b style="color:green">В норме</b> - нет описанных выше отклонений.<br>' ||
 | ||
|                                                              '<b style="color:gray">Пусто</b> - в Системе не хватает данных для рассчёта. Убедитесь, что для этапа задана действующая калькуляция с указанием плановых значений по статьям, подлежащим контролю.');
 | ||
|     PKG_P8PANELS_VISUAL.TDATA_GRID_ADD_COL_DEF(RDATA_GRID => RDG,
 | ||
|                                                SNAME      => 'NCTRL_ACT',
 | ||
|                                                SCAPTION   => 'Актир-е',
 | ||
|                                                SDATA_TYPE => PKG_P8PANELS_VISUAL.SDATA_TYPE_NUMB,
 | ||
|                                                SCOND_FROM => 'EDCTRL_ACT',
 | ||
|                                                BORDER     => true,
 | ||
|                                                BFILTER    => true,
 | ||
|                                                RCOL_VALS  => RCOL_VALS,
 | ||
|                                                SHINT      => '<b>Актирование</b> - контроль актирования работ, выполненных по этапу, со стороны заказчика.<br>' ||
 | ||
|                                                              '<b style="color:red">Требует внимания</b> - этап в состоянии "Закрыт", но при этом в Системе отсутствует утверждённая "Расходная накладная на отпуск потребителю" для данного этапа.<br>' ||
 | ||
|                                                              '<b style="color:green">В норме</b> - нет описанных выше отклонений.<br>' ||
 | ||
|                                                              '<b style="color:gray">Пусто</b> - в Системе не хватает данных для рассчёта. Убедитесь, что этап, если работы по нему завершены, переведен в состояние "Закрыт".');
 | ||
|     PKG_P8PANELS_VISUAL.TDATA_GRID_ADD_COL_DEF(RDATA_GRID => RDG,
 | ||
|                                                SNAME      => 'NCOST_READY',
 | ||
|                                                SCAPTION   => 'Готов (%, затраты)',
 | ||
|                                                SDATA_TYPE => PKG_P8PANELS_VISUAL.SDATA_TYPE_NUMB,
 | ||
|                                                SCOND_FROM => 'EDCOST_READYFrom',
 | ||
|                                                SCOND_TO   => 'EDCOST_READYTo',                                               
 | ||
|                                                BORDER     => true,
 | ||
|                                                BFILTER    => true);
 | ||
|     /* Обходим данные */
 | ||
|     begin
 | ||
|       /* Собираем запрос */
 | ||
|       CSQL := 'select *
 | ||
|             from (select D.*,
 | ||
|                          ROWNUM NROW
 | ||
|                     from (select PS.RN NRN,
 | ||
|                                  PS.NUMB SNUMB,
 | ||
|                                  PS.NAME SNAME,                                 
 | ||
|                                  PS.EXPECTED_RES SEXPECTED_RES,
 | ||
|                                  FAC.NUMB SFACEACC,
 | ||
|                                  PS.STATE NSTATE,
 | ||
|                                  PS.BEGPLAN DBEGPLAN,
 | ||
|                                  PS.ENDPLAN DENDPLAN,
 | ||
|                                  PS.COST_SUM_BASECURR NCOST_SUM,
 | ||
|                                  CN.INTCODE SCURNAMES,
 | ||
|                                  PKG_P8PANELS_PROJECTS.STAGES_GET_FIN_IN(PS.RN) NFIN_IN,
 | ||
|                                  ''Paynotes'' SLNK_UNIT_NFIN_IN,
 | ||
|                                  0 NLNK_DOCUMENT_NFIN_IN,
 | ||
|                                  PKG_P8PANELS_PROJECTS.STAGES_GET_FIN_OUT(PS.RN) NFIN_OUT,
 | ||
|                                  ''Paynotes'' SLNK_UNIT_NFIN_OUT,
 | ||
|                                  1 NLNK_DOCUMENT_NFIN_OUT,
 | ||
|                                  PKG_P8PANELS_PROJECTS.STAGES_GET_CTRL_FIN(PS.RN) NCTRL_FIN,
 | ||
|                                  PKG_P8PANELS_PROJECTS.STAGES_GET_CTRL_CONTR(PS.RN) NCTRL_CONTR,
 | ||
|                                  PKG_P8PANELS_PROJECTS.STAGES_GET_CTRL_COEXEC(PS.RN) NCTRL_COEXEC,
 | ||
|                                  PKG_P8PANELS_PROJECTS.STAGES_GET_DAYS_LEFT(PS.RN) NDAYS_LEFT,
 | ||
|                                  PKG_P8PANELS_PROJECTS.STAGES_GET_CTRL_PERIOD(PS.RN) NCTRL_PERIOD,
 | ||
|                                  PKG_P8PANELS_PROJECTS.STAGES_GET_COST_FACT(PS.RN) NCOST_FACT,
 | ||
|                                  ''CostNotes'' SLNK_UNIT_NCOST_FACT,
 | ||
|                                  1 NLNK_DOCUMENT_NCOST_FACT,
 | ||
|                                  PKG_P8PANELS_PROJECTS.STAGES_GET_SUMM_REALIZ(PS.RN, :NFPDARTCL_REALIZ) NSUMM_REALIZ,
 | ||
|                                  ''GoodsTransInvoicesToConsumers'' SLNK_UNIT_NSUMM_REALIZ,
 | ||
|                                  1 NLNK_DOCUMENT_NSUMM_REALIZ,                                 
 | ||
|                                  PKG_P8PANELS_PROJECTS.STAGES_GET_CTRL_COST(PS.RN) NCTRL_COST,
 | ||
|                                  PKG_P8PANELS_PROJECTS.STAGES_GET_CTRL_ACT(PS.RN) NCTRL_ACT,
 | ||
|                                  PKG_P8PANELS_PROJECTS.STAGES_GET_COST_READY(PS.RN) NCOST_READY
 | ||
|                             from PROJECTSTAGE   PS,
 | ||
|                                  PROJECT        P,
 | ||
|                                  FACEACC        FAC,
 | ||
|                                  CURNAMES       CN
 | ||
|                            where PS.PRN = P.RN
 | ||
|                              and PS.FACEACC = FAC.RN(+)
 | ||
|                              and P.CURNAMES = CN.RN
 | ||
|                              and exists (select null from V_USERPRIV UP where UP.CATALOG = PS.CRN)
 | ||
|                              and exists (select null from V_USERPRIV UP where UP.JUR_PERS = PS.JUR_PERS and UP.UNITCODE = ''Projects'')                             
 | ||
|                              and PS.RN in (select ID from COND_BROKER_IDSMART where IDENT = :NIDENT) %ORDER_BY%) D) F
 | ||
|            where F.NROW between :NROW_FROM and :NROW_TO';
 | ||
|       /* Учтём сортировки */
 | ||
|       PKG_P8PANELS_VISUAL.TORDERS_SET_QUERY(RDATA_GRID => RDG, RORDERS => RO, SPATTERN => '%ORDER_BY%', CSQL => CSQL);
 | ||
|       /* Учтём фильтры */
 | ||
|       PKG_P8PANELS_VISUAL.TFILTERS_SET_QUERY(NIDENT     => NIDENT,
 | ||
|                                              NCOMPANY   => NCOMPANY,
 | ||
|                                              NPARENT    => NPRN,
 | ||
|                                              SUNIT      => 'ProjectsStages',
 | ||
|                                              SPROCEDURE => 'PKG_P8PANELS_PROJECTS.STAGES_COND',
 | ||
|                                              RDATA_GRID => RDG,
 | ||
|                                              RFILTERS   => RF);
 | ||
|       /* Разбираем его */
 | ||
|       ICURSOR := PKG_SQL_DML.OPEN_CURSOR(SWHAT => 'SELECT');
 | ||
|       PKG_SQL_DML.PARSE(ICURSOR => ICURSOR, SQUERY => CSQL);
 | ||
|       /* Делаем подстановку параметров */
 | ||
|       PKG_SQL_DML.BIND_VARIABLE_NUM(ICURSOR => ICURSOR, SNAME => 'NIDENT', NVALUE => NIDENT);
 | ||
|       PKG_SQL_DML.BIND_VARIABLE_NUM(ICURSOR => ICURSOR, SNAME => 'NROW_FROM', NVALUE => NROW_FROM);
 | ||
|       PKG_SQL_DML.BIND_VARIABLE_NUM(ICURSOR => ICURSOR, SNAME => 'NROW_TO', NVALUE => NROW_TO);
 | ||
|       PKG_SQL_DML.BIND_VARIABLE_NUM(ICURSOR => ICURSOR, SNAME => 'NFPDARTCL_REALIZ', NVALUE => NFPDARTCL_REALIZ);
 | ||
|       /* Описываем структуру записи курсора */
 | ||
|       PKG_SQL_DML.DEFINE_COLUMN_NUM(ICURSOR => ICURSOR, IPOSITION => 1);
 | ||
|       PKG_SQL_DML.DEFINE_COLUMN_STR(ICURSOR => ICURSOR, IPOSITION => 2);
 | ||
|       PKG_SQL_DML.DEFINE_COLUMN_STR(ICURSOR => ICURSOR, IPOSITION => 3);
 | ||
|       PKG_SQL_DML.DEFINE_COLUMN_STR(ICURSOR => ICURSOR, IPOSITION => 4);
 | ||
|       PKG_SQL_DML.DEFINE_COLUMN_STR(ICURSOR => ICURSOR, IPOSITION => 5);
 | ||
|       PKG_SQL_DML.DEFINE_COLUMN_NUM(ICURSOR => ICURSOR, IPOSITION => 6);
 | ||
|       PKG_SQL_DML.DEFINE_COLUMN_DATE(ICURSOR => ICURSOR, IPOSITION => 7);
 | ||
|       PKG_SQL_DML.DEFINE_COLUMN_DATE(ICURSOR => ICURSOR, IPOSITION => 8);
 | ||
|       PKG_SQL_DML.DEFINE_COLUMN_NUM(ICURSOR => ICURSOR, IPOSITION => 9);
 | ||
|       PKG_SQL_DML.DEFINE_COLUMN_STR(ICURSOR => ICURSOR, IPOSITION => 10);
 | ||
|       PKG_SQL_DML.DEFINE_COLUMN_NUM(ICURSOR => ICURSOR, IPOSITION => 11);
 | ||
|       PKG_SQL_DML.DEFINE_COLUMN_STR(ICURSOR => ICURSOR, IPOSITION => 12);
 | ||
|       PKG_SQL_DML.DEFINE_COLUMN_NUM(ICURSOR => ICURSOR, IPOSITION => 13);
 | ||
|       PKG_SQL_DML.DEFINE_COLUMN_NUM(ICURSOR => ICURSOR, IPOSITION => 14);
 | ||
|       PKG_SQL_DML.DEFINE_COLUMN_STR(ICURSOR => ICURSOR, IPOSITION => 15);
 | ||
|       PKG_SQL_DML.DEFINE_COLUMN_NUM(ICURSOR => ICURSOR, IPOSITION => 16);
 | ||
|       PKG_SQL_DML.DEFINE_COLUMN_NUM(ICURSOR => ICURSOR, IPOSITION => 17);
 | ||
|       PKG_SQL_DML.DEFINE_COLUMN_NUM(ICURSOR => ICURSOR, IPOSITION => 18);
 | ||
|       PKG_SQL_DML.DEFINE_COLUMN_NUM(ICURSOR => ICURSOR, IPOSITION => 19);
 | ||
|       PKG_SQL_DML.DEFINE_COLUMN_NUM(ICURSOR => ICURSOR, IPOSITION => 20);
 | ||
|       PKG_SQL_DML.DEFINE_COLUMN_NUM(ICURSOR => ICURSOR, IPOSITION => 21);
 | ||
|       PKG_SQL_DML.DEFINE_COLUMN_NUM(ICURSOR => ICURSOR, IPOSITION => 22);
 | ||
|       PKG_SQL_DML.DEFINE_COLUMN_STR(ICURSOR => ICURSOR, IPOSITION => 23);
 | ||
|       PKG_SQL_DML.DEFINE_COLUMN_NUM(ICURSOR => ICURSOR, IPOSITION => 24);
 | ||
|       PKG_SQL_DML.DEFINE_COLUMN_NUM(ICURSOR => ICURSOR, IPOSITION => 25);
 | ||
|       PKG_SQL_DML.DEFINE_COLUMN_STR(ICURSOR => ICURSOR, IPOSITION => 26);
 | ||
|       PKG_SQL_DML.DEFINE_COLUMN_NUM(ICURSOR => ICURSOR, IPOSITION => 27);
 | ||
|       PKG_SQL_DML.DEFINE_COLUMN_NUM(ICURSOR => ICURSOR, IPOSITION => 28);
 | ||
|       PKG_SQL_DML.DEFINE_COLUMN_NUM(ICURSOR => ICURSOR, IPOSITION => 29);
 | ||
|       PKG_SQL_DML.DEFINE_COLUMN_NUM(ICURSOR => ICURSOR, IPOSITION => 30);
 | ||
|       /* Делаем выборку */
 | ||
|       if (PKG_SQL_DML.EXECUTE(ICURSOR => ICURSOR) = 0) then
 | ||
|         null;
 | ||
|       end if;
 | ||
|       /* Обходим выбранные записи */
 | ||
|       while (PKG_SQL_DML.FETCH_ROWS(ICURSOR => ICURSOR) > 0)
 | ||
|       loop
 | ||
|         /* Добавляем колонки с данными */
 | ||
|         PKG_P8PANELS_VISUAL.TROW_ADD_CUR_COLN(RROW      => RDG_ROW,
 | ||
|                                               SNAME     => 'NRN',
 | ||
|                                               ICURSOR   => ICURSOR,
 | ||
|                                               NPOSITION => 1,
 | ||
|                                               BCLEAR    => true);
 | ||
|         PKG_P8PANELS_VISUAL.TROW_ADD_CUR_COLS(RROW => RDG_ROW, SNAME => 'SNUMB', ICURSOR => ICURSOR, NPOSITION => 2);
 | ||
|         PKG_P8PANELS_VISUAL.TROW_ADD_CUR_COLS(RROW => RDG_ROW, SNAME => 'SNAME', ICURSOR => ICURSOR, NPOSITION => 3);
 | ||
|         PKG_P8PANELS_VISUAL.TROW_ADD_CUR_COLS(RROW      => RDG_ROW,
 | ||
|                                               SNAME     => 'SEXPECTED_RES',
 | ||
|                                               ICURSOR   => ICURSOR,
 | ||
|                                               NPOSITION => 4);
 | ||
|         PKG_P8PANELS_VISUAL.TROW_ADD_CUR_COLS(RROW => RDG_ROW, SNAME => 'SFACEACC', ICURSOR => ICURSOR, NPOSITION => 5);
 | ||
|         PKG_P8PANELS_VISUAL.TROW_ADD_CUR_COLN(RROW => RDG_ROW, SNAME => 'NSTATE', ICURSOR => ICURSOR, NPOSITION => 6);
 | ||
|         PKG_P8PANELS_VISUAL.TROW_ADD_CUR_COLD(RROW => RDG_ROW, SNAME => 'DBEGPLAN', ICURSOR => ICURSOR, NPOSITION => 7);
 | ||
|         PKG_P8PANELS_VISUAL.TROW_ADD_CUR_COLD(RROW => RDG_ROW, SNAME => 'DENDPLAN', ICURSOR => ICURSOR, NPOSITION => 8);
 | ||
|         PKG_P8PANELS_VISUAL.TROW_ADD_CUR_COLN(RROW      => RDG_ROW,
 | ||
|                                               SNAME     => 'NCOST_SUM',
 | ||
|                                               ICURSOR   => ICURSOR,
 | ||
|                                               NPOSITION => 9);
 | ||
|         PKG_P8PANELS_VISUAL.TROW_ADD_CUR_COLS(RROW      => RDG_ROW,
 | ||
|                                               SNAME     => 'SCURNAMES',
 | ||
|                                               ICURSOR   => ICURSOR,
 | ||
|                                               NPOSITION => 10);
 | ||
|         PKG_P8PANELS_VISUAL.TROW_ADD_CUR_COLN(RROW => RDG_ROW, SNAME => 'NFIN_IN', ICURSOR => ICURSOR, NPOSITION => 11);
 | ||
|         PKG_P8PANELS_VISUAL.TROW_ADD_CUR_COLS(RROW      => RDG_ROW,
 | ||
|                                               SNAME     => 'SLNK_UNIT_NFIN_IN',
 | ||
|                                               ICURSOR   => ICURSOR,
 | ||
|                                               NPOSITION => 12);
 | ||
|         PKG_P8PANELS_VISUAL.TROW_ADD_CUR_COLN(RROW      => RDG_ROW,
 | ||
|                                               SNAME     => 'NLNK_DOCUMENT_NFIN_IN',
 | ||
|                                               ICURSOR   => ICURSOR,
 | ||
|                                               NPOSITION => 13);
 | ||
|         PKG_P8PANELS_VISUAL.TROW_ADD_CUR_COLN(RROW      => RDG_ROW,
 | ||
|                                               SNAME     => 'NFIN_OUT',
 | ||
|                                               ICURSOR   => ICURSOR,
 | ||
|                                               NPOSITION => 14);
 | ||
|         PKG_P8PANELS_VISUAL.TROW_ADD_CUR_COLS(RROW      => RDG_ROW,
 | ||
|                                               SNAME     => 'SLNK_UNIT_NFIN_OUT',
 | ||
|                                               ICURSOR   => ICURSOR,
 | ||
|                                               NPOSITION => 15);
 | ||
|         PKG_P8PANELS_VISUAL.TROW_ADD_CUR_COLN(RROW      => RDG_ROW,
 | ||
|                                               SNAME     => 'NLNK_DOCUMENT_NFIN_OUT',
 | ||
|                                               ICURSOR   => ICURSOR,
 | ||
|                                               NPOSITION => 16);
 | ||
|         PKG_P8PANELS_VISUAL.TROW_ADD_CUR_COLN(RROW      => RDG_ROW,
 | ||
|                                               SNAME     => 'NCTRL_FIN',
 | ||
|                                               ICURSOR   => ICURSOR,
 | ||
|                                               NPOSITION => 17);
 | ||
|         PKG_P8PANELS_VISUAL.TROW_ADD_CUR_COLN(RROW      => RDG_ROW,
 | ||
|                                               SNAME     => 'NCTRL_CONTR',
 | ||
|                                               ICURSOR   => ICURSOR,
 | ||
|                                               NPOSITION => 18);
 | ||
|         PKG_P8PANELS_VISUAL.TROW_ADD_CUR_COLN(RROW      => RDG_ROW,
 | ||
|                                               SNAME     => 'NCTRL_COEXEC',
 | ||
|                                               ICURSOR   => ICURSOR,
 | ||
|                                               NPOSITION => 19);
 | ||
|         PKG_P8PANELS_VISUAL.TROW_ADD_CUR_COLN(RROW      => RDG_ROW,
 | ||
|                                               SNAME     => 'NDAYS_LEFT',
 | ||
|                                               ICURSOR   => ICURSOR,
 | ||
|                                               NPOSITION => 20);
 | ||
|         PKG_P8PANELS_VISUAL.TROW_ADD_CUR_COLN(RROW      => RDG_ROW,
 | ||
|                                               SNAME     => 'NCTRL_PERIOD',
 | ||
|                                               ICURSOR   => ICURSOR,
 | ||
|                                               NPOSITION => 21);
 | ||
|         PKG_SQL_DML.COLUMN_VALUE_NUM(ICURSOR => ICURSOR, IPOSITION => 22, NVALUE => NCOST_FACT);
 | ||
|         PKG_P8PANELS_VISUAL.TROW_ADD_COL(RROW => RDG_ROW, SNAME => 'NCOST_FACT', NVALUE => NCOST_FACT);
 | ||
|         PKG_P8PANELS_VISUAL.TROW_ADD_CUR_COLS(RROW      => RDG_ROW,
 | ||
|                                               SNAME     => 'SLNK_UNIT_NCOST_FACT',
 | ||
|                                               ICURSOR   => ICURSOR,
 | ||
|                                               NPOSITION => 23);
 | ||
|         PKG_P8PANELS_VISUAL.TROW_ADD_CUR_COLN(RROW      => RDG_ROW,
 | ||
|                                               SNAME     => 'NLNK_DOCUMENT_NCOST_FACT',
 | ||
|                                               ICURSOR   => ICURSOR,
 | ||
|                                               NPOSITION => 24);
 | ||
|         PKG_SQL_DML.COLUMN_VALUE_NUM(ICURSOR => ICURSOR, IPOSITION => 25, NVALUE => NSUMM_REALIZ);
 | ||
|         if (NSUMM_REALIZ = 0) then
 | ||
|           NSUMM_INCOME := 0;
 | ||
|           NINCOME_PRC  := 0;
 | ||
|         else
 | ||
|           NSUMM_INCOME := NSUMM_REALIZ - NCOST_FACT;
 | ||
|           NINCOME_PRC  := NSUMM_INCOME / NCOST_FACT * 100;
 | ||
|         end if;
 | ||
|         PKG_P8PANELS_VISUAL.TROW_ADD_COL(RROW => RDG_ROW, SNAME => 'NSUMM_REALIZ', NVALUE => NSUMM_REALIZ);
 | ||
|         PKG_P8PANELS_VISUAL.TROW_ADD_CUR_COLS(RROW      => RDG_ROW,
 | ||
|                                               SNAME     => 'SLNK_UNIT_NSUMM_REALIZ',
 | ||
|                                               ICURSOR   => ICURSOR,
 | ||
|                                               NPOSITION => 26);
 | ||
|         PKG_P8PANELS_VISUAL.TROW_ADD_CUR_COLN(RROW      => RDG_ROW,
 | ||
|                                               SNAME     => 'NLNK_DOCUMENT_NSUMM_REALIZ',
 | ||
|                                               ICURSOR   => ICURSOR,
 | ||
|                                               NPOSITION => 27);
 | ||
|         PKG_P8PANELS_VISUAL.TROW_ADD_COL(RROW => RDG_ROW, SNAME => 'NSUMM_INCOME', NVALUE => NSUMM_INCOME);
 | ||
|         PKG_P8PANELS_VISUAL.TROW_ADD_COL(RROW => RDG_ROW, SNAME => 'NINCOME_PRC', NVALUE => NINCOME_PRC);
 | ||
|         PKG_P8PANELS_VISUAL.TROW_ADD_CUR_COLN(RROW      => RDG_ROW,
 | ||
|                                               SNAME     => 'NCTRL_COST',
 | ||
|                                               ICURSOR   => ICURSOR,
 | ||
|                                               NPOSITION => 28);
 | ||
|         PKG_P8PANELS_VISUAL.TROW_ADD_CUR_COLN(RROW      => RDG_ROW,
 | ||
|                                               SNAME     => 'NCTRL_ACT',
 | ||
|                                               ICURSOR   => ICURSOR,
 | ||
|                                               NPOSITION => 29);
 | ||
|         PKG_P8PANELS_VISUAL.TROW_ADD_CUR_COLN(RROW      => RDG_ROW,
 | ||
|                                               SNAME     => 'NCOST_READY',
 | ||
|                                               ICURSOR   => ICURSOR,
 | ||
|                                               NPOSITION => 30);
 | ||
|         /* Добавляем строку в таблицу */
 | ||
|         PKG_P8PANELS_VISUAL.TDATA_GRID_ADD_ROW(RDATA_GRID => RDG, RROW => RDG_ROW);
 | ||
|       end loop;
 | ||
|       /* Освобождаем курсор */
 | ||
|       PKG_SQL_DML.CLOSE_CURSOR(ICURSOR => ICURSOR);
 | ||
|     exception
 | ||
|       when others then
 | ||
|         PKG_SQL_DML.CLOSE_CURSOR(ICURSOR => ICURSOR);
 | ||
|         raise;
 | ||
|     end;
 | ||
|     /* Сериализуем описание */
 | ||
|     COUT := PKG_P8PANELS_VISUAL.TDATA_GRID_TO_XML(RDATA_GRID => RDG, NINCLUDE_DEF => NINCLUDE_DEF);
 | ||
|   end STAGES_LIST;
 | ||
|   
 | ||
|   /* Подбор записей журнала затрат по статье калькуляции этапа проекта */
 | ||
|   procedure STAGE_ARTS_SELECT_COST_FACT
 | ||
|   (
 | ||
|     NSTAGE                  in number,         -- Рег. номер этапа проекта
 | ||
|     NFPDARTCL               in number := null, -- Рег. номер статьи калькуляции (null - по всем)
 | ||
|     NFINFLOW_TYPE           in number := null, -- Вид движения по статье (null - по всем, 0 - остаток, 1 - приход, 2 - расход)
 | ||
|     NIDENT                  out number         -- Идентификатор буфера подобранных (списка отмеченных записей, null - не найдено)
 | ||
|   )
 | ||
|   is
 | ||
|     NSELECTLIST             PKG_STD.TREF;      -- Рег. номер добавленной записи буфера подобранных
 | ||
|   begin
 | ||
|     /* Подберём записи журнала затрат */
 | ||
|     for C in (select CN.COMPANY,
 | ||
|                      CN.RN
 | ||
|                 from PROJECTSTAGE PS,
 | ||
|                      FCCOSTNOTES  CN,
 | ||
|                      FINSTATE     FS,
 | ||
|                      FPDARTCL     FA,
 | ||
|                      FINFLOWTYPE  FT
 | ||
|                where PS.RN = NSTAGE
 | ||
|                  and PS.FACEACC = CN.PROD_ORDER
 | ||
|                  and ((NFPDARTCL is null) or ((NFPDARTCL is not null) and (CN.COST_ARTICLE = NFPDARTCL)))
 | ||
|                  and CN.COST_TYPE = FS.RN
 | ||
|                  and FS.TYPE = 1
 | ||
|                  and CN.COST_ARTICLE = FA.RN
 | ||
|                  and FA.DEF_FLOW = FT.RN(+)
 | ||
|                  and ((NFINFLOW_TYPE is null) or ((NFINFLOW_TYPE is not null) and (FT.TYPE = NFINFLOW_TYPE)))
 | ||
|                  and exists (select null from V_USERPRIV UP where UP.CATALOG = PS.CRN)
 | ||
|                  and exists (select null from V_USERPRIV UP where UP.JUR_PERS = PS.JUR_PERS and UP.UNITCODE = 'Projects')
 | ||
|                  and exists (select null from V_USERPRIV UP where UP.CATALOG = CN.CRN))
 | ||
|     loop
 | ||
|       /* Сформируем идентификатор буфера */
 | ||
|       if (NIDENT is null) then
 | ||
|         NIDENT := GEN_IDENT();
 | ||
|       end if;
 | ||
|       /* Добавим подобранное в список отмеченных записей */
 | ||
|       P_SELECTLIST_BASE_INSERT(NIDENT       => NIDENT,
 | ||
|                                NCOMPANY     => C.COMPANY,
 | ||
|                                NDOCUMENT    => C.RN,
 | ||
|                                SUNITCODE    => 'CostNotes',
 | ||
|                                SACTIONCODE  => null,
 | ||
|                                NCRN         => null,
 | ||
|                                NDOCUMENT1   => null,
 | ||
|                                SUNITCODE1   => null,
 | ||
|                                SACTIONCODE1 => null,
 | ||
|                                NRN          => NSELECTLIST);
 | ||
|     end loop;
 | ||
|   end STAGE_ARTS_SELECT_COST_FACT;
 | ||
|   
 | ||
|   /* Получение суммы-факт по статье калькуляции этапа проекта */
 | ||
|   function STAGE_ARTS_GET_COST_FACT
 | ||
|   (
 | ||
|     NSTAGE                  in number,         -- Рег. номер этапа проекта
 | ||
|     NFPDARTCL               in number := null, -- Рег. номер статьи калькуляции (null - по всем)
 | ||
|     NFINFLOW_TYPE           in number := null  -- Вид движения по статье (null - по всем, 0 - остаток, 1 - приход, 2 - расход)
 | ||
|   ) return                  number             -- Сумма-факт по статье
 | ||
|   is
 | ||
|     NRES                    PKG_STD.TNUMBER;   -- Буфер для рузультата
 | ||
|   begin
 | ||
|     /* Суммируем факт по лицевому счёту затрат этапа и указанной статье */
 | ||
|     select COALESCE(sum(CN.COST_BSUM), 0)
 | ||
|       into NRES
 | ||
|       from PROJECTSTAGE PS,
 | ||
|            FCCOSTNOTES  CN,
 | ||
|            FINSTATE     FS,
 | ||
|            FPDARTCL     FA,
 | ||
|            FINFLOWTYPE  FT
 | ||
|      where PS.RN = NSTAGE
 | ||
|        and PS.FACEACC = CN.PROD_ORDER
 | ||
|        and ((NFPDARTCL is null) or ((NFPDARTCL is not null) and (CN.COST_ARTICLE = NFPDARTCL)))
 | ||
|        and CN.COST_TYPE = FS.RN
 | ||
|        and FS.TYPE = 1
 | ||
|        and CN.COST_ARTICLE = FA.RN
 | ||
|        and FA.DEF_FLOW = FT.RN(+)
 | ||
|        and ((NFINFLOW_TYPE is null) or ((NFINFLOW_TYPE is not null) and (FT.TYPE = NFINFLOW_TYPE)));
 | ||
|     /* Возвращаем результат */
 | ||
|     return NRES;
 | ||
|   end STAGE_ARTS_GET_COST_FACT;
 | ||
| 
 | ||
|   /* Подбор записей договоров с соисполнителями по статье калькуляции этапа проекта */
 | ||
|   procedure STAGE_ARTS_SELECT_CONTR
 | ||
|   (
 | ||
|     NSTAGE                  in number,         -- Рег. номер этапа проекта
 | ||
|     NFPDARTCL               in number := null, -- Рег. номер статьи затрат (null - по всем)
 | ||
|     NIDENT                  out number         -- Идентификатор буфера подобранных (списка отмеченных записей, null - не найдено)
 | ||
|   )
 | ||
|   is
 | ||
|     NSELECTLIST             PKG_STD.TREF;      -- Рег. номер добавленной записи буфера подобранных
 | ||
|   begin
 | ||
|     /* Подберём записи договоров */
 | ||
|     for C in (select distinct S.COMPANY NCOMPANY,
 | ||
|                               S.PRN     NRN
 | ||
|                 from PROJECTSTAGEPF EPF,
 | ||
|                      STAGES         S
 | ||
|                where EPF.PRN = NSTAGE
 | ||
|                  and EPF.FACEACC = S.FACEACC
 | ||
|                  and ((NFPDARTCL is null) or ((NFPDARTCL is not null) and (EPF.COST_ARTICLE = NFPDARTCL)))
 | ||
|                  and exists (select null from V_USERPRIV UP where UP.CATALOG = EPF.CRN)
 | ||
|                  and exists (select null from V_USERPRIV UP where UP.JUR_PERS = EPF.JUR_PERS and UP.UNITCODE = 'Projects')
 | ||
|                  and exists (select null from V_USERPRIV UP where UP.CATALOG = S.CRN)
 | ||
|                  and exists (select null from V_USERPRIV UP where UP.JUR_PERS = S.JUR_PERS and UP.UNITCODE = 'Contracts'))
 | ||
|     loop
 | ||
|       /* Сформируем идентификатор буфера */
 | ||
|       if (NIDENT is null) then
 | ||
|         NIDENT := GEN_IDENT();
 | ||
|       end if;
 | ||
|       /* Добавим подобранное в список отмеченных записей */
 | ||
|       P_SELECTLIST_BASE_INSERT(NIDENT       => NIDENT,
 | ||
|                                NCOMPANY     => C.NCOMPANY,
 | ||
|                                NDOCUMENT    => C.NRN,
 | ||
|                                SUNITCODE    => 'Contracts',
 | ||
|                                SACTIONCODE  => null,
 | ||
|                                NCRN         => null,
 | ||
|                                NDOCUMENT1   => null,
 | ||
|                                SUNITCODE1   => null,
 | ||
|                                SACTIONCODE1 => null,
 | ||
|                                NRN          => NSELECTLIST);
 | ||
|     end loop;
 | ||
|   end STAGE_ARTS_SELECT_CONTR;
 | ||
| 
 | ||
|   /* Получение законтрактованной суммы по статье калькуляции этапа проекта */
 | ||
|   function STAGE_ARTS_GET_CONTR
 | ||
|   (
 | ||
|     NSTAGE                  in number,            -- Рег. номер этапа проекта
 | ||
|     NFPDARTCL               in number :=null      -- Рег. номер статьи затрат (null - по всем)
 | ||
|   ) return                  number                -- Сумма контрактов по статье
 | ||
|   is
 | ||
|     RSTG                    PROJECTSTAGE%rowtype; -- Запись этапа
 | ||
|     NTAX_GROUP_DP           PKG_STD.TREF;         -- Рег. номер доп. свойства для налоговой группы проекта
 | ||
|     SPRJ_TAX_GROUP          PKG_STD.TSTRING;      -- Налоговая группа проекта
 | ||
|     NSUM                    PKG_STD.TNUMBER;      -- Сумма контрактов (без налогов)
 | ||
|     NSUM_TAX                PKG_STD.TNUMBER;      -- Сумма контрактов (с налогами)
 | ||
|   begin
 | ||
|     /* Считаем запись этапа */
 | ||
|     begin
 | ||
|       RSTG := STAGES_GET(NRN => NSTAGE);
 | ||
|     exception
 | ||
|       when others then
 | ||
|         null;
 | ||
|     end;
 | ||
|     /* Если считано успешно - будем искать данные */
 | ||
|     if (RSTG.RN is not null) then
 | ||
|       /* Определим рег. номер доп. свойства для налоговой группы проекта */
 | ||
|       FIND_DOCS_PROPS_CODE(NFLAG_SMART => 1,
 | ||
|                            NCOMPANY    => RSTG.COMPANY,
 | ||
|                            SCODE       => SDP_STAX_GROUP,
 | ||
|                            NRN         => NTAX_GROUP_DP);
 | ||
|       /* Считаем налоговую группу проекта */
 | ||
|       SPRJ_TAX_GROUP := F_DOCS_PROPS_GET_STR_VALUE(NPROPERTY => NTAX_GROUP_DP,
 | ||
|                                                    SUNITCODE => 'Projects',
 | ||
|                                                    NDOCUMENT => RSTG.PRN);
 | ||
|       /* Считаем сумму этапов договоров с соисполнителями */
 | ||
|       select COALESCE(sum(S.STAGE_SUM), 0),
 | ||
|              COALESCE(sum(S.STAGE_SUMTAX), 0)
 | ||
|         into NSUM,
 | ||
|              NSUM_TAX
 | ||
|         from PROJECTSTAGEPF EPF,
 | ||
|              STAGES         S
 | ||
|        where EPF.PRN = RSTG.RN
 | ||
|          and EPF.FACEACC = S.FACEACC
 | ||
|          and ((NFPDARTCL is null) or ((NFPDARTCL is not null) and (EPF.COST_ARTICLE = NFPDARTCL)));
 | ||
|       /* Вернём сумму в зависимости от налоговой группы проекта */
 | ||
|       if (SPRJ_TAX_GROUP is not null) then
 | ||
|         return NSUM;
 | ||
|       else
 | ||
|         return NSUM_TAX;
 | ||
|       end if;
 | ||
|     else
 | ||
|       return 0;
 | ||
|     end if;
 | ||
|   end STAGE_ARTS_GET_CONTR;
 | ||
|   
 | ||
|   /* Получение списка статей этапа проекта */
 | ||
|   procedure STAGE_ARTS_GET
 | ||
|   (
 | ||
|     NSTAGE                  in number,            -- Рег. номер этапа проекта  
 | ||
|     NFPDARTCL               in number := null,    -- Рег. номер статьи затрат (null - брать все)
 | ||
|     NINC_COST               in number := 0,       -- Включить сведения о затратах (0 - нет, 1 - да)
 | ||
|     NINC_CONTR              in number := 0,       -- Включить сведения о контрактации (0 - нет, 1 - да)
 | ||
|     RSTAGE_ARTS             out TSTAGE_ARTS       -- Список статей этапа проекта
 | ||
|   )
 | ||
|   is
 | ||
|     RSTG                    PROJECTSTAGE%rowtype; -- Запись этапа проекта
 | ||
|     NCTL_COST_DP            PKG_STD.TREF;         -- Рег. номер доп. свойства, определяющего необходимость контроля затрат по статье
 | ||
|     NCTL_CONTR_DP           PKG_STD.TREF;         -- Рег. номер доп. свойства, определяющего необходимость контроля контрактации по статье
 | ||
|     I                       PKG_STD.TNUMBER;      -- Счётчик статей в результирующей коллекции
 | ||
|   begin
 | ||
|     /* Читаем этап */
 | ||
|     RSTG := STAGES_GET(NRN => NSTAGE);
 | ||
|     /* Определим дополнительные свойства - контроль затрат */
 | ||
|     if (NINC_COST = 1) then
 | ||
|       FIND_DOCS_PROPS_CODE(NFLAG_SMART => 1, NCOMPANY => RSTG.COMPANY, SCODE => SDP_SCTL_COST, NRN => NCTL_COST_DP);
 | ||
|     end if;
 | ||
|     /* Определим дополнительные свойства - контроль контрактации */
 | ||
|     if (NINC_CONTR = 1) then
 | ||
|       FIND_DOCS_PROPS_CODE(NFLAG_SMART => 1, NCOMPANY => RSTG.COMPANY, SCODE => SDP_SCTL_CONTR, NRN => NCTL_CONTR_DP);
 | ||
|     end if;
 | ||
|     /* Инициализируем коллекцию */
 | ||
|     RSTAGE_ARTS := TSTAGE_ARTS();
 | ||
|     /* Подбираем активную структуру цены этапа проекта и её обходим статьи */
 | ||
|     for C in (select CSPA.NUMB     SNUMB,
 | ||
|                      A.RN          NARTICLE,
 | ||
|                      A.NAME        SARTICLE,
 | ||
|                      CSPA.COST_SUM NCOST_SUM
 | ||
|                 from PROJECTSTAGE  PS,
 | ||
|                      STAGES        CS,
 | ||
|                      CONTRPRSTRUCT CSP,
 | ||
|                      CONTRPRCLC    CSPA,
 | ||
|                      FPDARTCL      A
 | ||
|                where PS.RN = RSTG.RN
 | ||
|                  and PS.FACEACCCUST = CS.FACEACC
 | ||
|                  and CSP.PRN = CS.RN
 | ||
|                  and CSP.SIGN_ACT = 1
 | ||
|                  and CSPA.PRN = CSP.RN
 | ||
|                  and CSPA.COST_ARTICLE = A.RN
 | ||
|                  and ((NFPDARTCL is null) or ((NFPDARTCL is not null) and (A.RN = NFPDARTCL)))
 | ||
|                  and exists (select null from V_USERPRIV UP where UP.CATALOG = PS.CRN)
 | ||
|                  and exists (select null from V_USERPRIV UP where UP.JUR_PERS = PS.JUR_PERS and UP.UNITCODE = 'Projects')
 | ||
|                  and exists (select null from V_USERPRIV UP where UP.CATALOG = CS.CRN)
 | ||
|                  and exists (select null from V_USERPRIV UP where UP.JUR_PERS = CS.JUR_PERS and UP.UNITCODE = 'Contracts')
 | ||
|                order by CSPA.NUMB)
 | ||
|     loop
 | ||
|       /* Добавим строку в коллекцию */
 | ||
|       RSTAGE_ARTS.EXTEND();
 | ||
|       I := RSTAGE_ARTS.LAST;
 | ||
|       /* Наполним её значениями из хранилища */
 | ||
|       RSTAGE_ARTS(I).NRN := C.NARTICLE;
 | ||
|       RSTAGE_ARTS(I).SCODE := C.SNUMB;
 | ||
|       RSTAGE_ARTS(I).SNAME := C.SARTICLE;
 | ||
|       RSTAGE_ARTS(I).NPLAN := C.NCOST_SUM;
 | ||
|       /* Если просили включить сведения о затратах и статья поддерживает это  */
 | ||
|       if ((NINC_COST = 1) and
 | ||
|          (UPPER(F_DOCS_PROPS_GET_STR_VALUE(NPROPERTY => NCTL_COST_DP,
 | ||
|                                             SUNITCODE => 'FinPlanArticles',
 | ||
|                                             NDOCUMENT => RSTAGE_ARTS(I).NRN)) = UPPER(SYES)) and
 | ||
|          (RSTAGE_ARTS(I).NPLAN is not null)) then
 | ||
|         /* Фактические затраты по статье */
 | ||
|         RSTAGE_ARTS(I).NCOST_FACT := STAGE_ARTS_GET_COST_FACT(NSTAGE => NSTAGE, NFPDARTCL => RSTAGE_ARTS(I).NRN);
 | ||
|         /* Отклонение затрат (план-факт) */
 | ||
|         RSTAGE_ARTS(I).NCOST_DIFF := RSTAGE_ARTS(I).NPLAN - RSTAGE_ARTS(I).NCOST_FACT;
 | ||
|         /* Контроль затрат */
 | ||
|         if (RSTAGE_ARTS(I).NCOST_DIFF >= 0) then
 | ||
|           RSTAGE_ARTS(I).NCTRL_COST := 0;
 | ||
|         else
 | ||
|           RSTAGE_ARTS(I).NCTRL_COST := 1;
 | ||
|         end if;
 | ||
|       end if;
 | ||
|       /* Если просили включить сведения о контрактах и статья поддерживает это */
 | ||
|       if ((NINC_CONTR = 1) and
 | ||
|          (UPPER(F_DOCS_PROPS_GET_STR_VALUE(NPROPERTY => NCTL_CONTR_DP,
 | ||
|                                             SUNITCODE => 'FinPlanArticles',
 | ||
|                                             NDOCUMENT => RSTAGE_ARTS(I).NRN)) = UPPER(SYES)) and
 | ||
|          (RSTAGE_ARTS(I).NPLAN is not null)) then
 | ||
|         /* Законтрактовано */
 | ||
|         RSTAGE_ARTS(I).NCONTR := STAGE_ARTS_GET_CONTR(NSTAGE => NSTAGE, NFPDARTCL => RSTAGE_ARTS(I).NRN);
 | ||
|         /* Осталось законтрактовать */
 | ||
|         RSTAGE_ARTS(I).NCONTR_LEFT := RSTAGE_ARTS(I).NPLAN - RSTAGE_ARTS(I).NCONTR;
 | ||
|         /* Контроль контрактации */
 | ||
|         if (RSTAGE_ARTS(I).NCONTR_LEFT >= 0) then
 | ||
|           RSTAGE_ARTS(I).NCTRL_CONTR := 0;
 | ||
|         else
 | ||
|           RSTAGE_ARTS(I).NCTRL_CONTR := 1;
 | ||
|         end if;
 | ||
|       end if;
 | ||
|     end loop;
 | ||
|   end STAGE_ARTS_GET;
 | ||
|   
 | ||
|   /* Список статей калькуляции этапа проекта */
 | ||
|   procedure STAGE_ARTS_LIST
 | ||
|   (
 | ||
|     NSTAGE                  in number,                      -- Рег. номер этапа проекта
 | ||
|     CFILTERS                in clob,                        -- Фильтры
 | ||
|     NINCLUDE_DEF            in number,                      -- Признак включения описания колонок таблицы в ответ
 | ||
|     COUT                    out clob                        -- Сериализованная таблица данных
 | ||
|   )
 | ||
|   is
 | ||
|     RF                      PKG_P8PANELS_VISUAL.TFILTERS;   -- Фильтры
 | ||
|     RF_CTRL_COST            PKG_P8PANELS_VISUAL.TFILTER;    -- Фильтр по колонке "Контроль (затраты)"
 | ||
|     NCTRL_COST_FROM         PKG_STD.TNUMBER;                -- Нижняя граница диапазона фильтра по колонке "Контроль (затраты)"
 | ||
|     NCTRL_COST_TO           PKG_STD.TNUMBER;                -- Верхняя граница диапазона фильтра по колонке "Контроль (затраты)"
 | ||
|     RF_CTRL_CONTR           PKG_P8PANELS_VISUAL.TFILTER;    -- Фильтр по колонке "Контроль (контрактация)"
 | ||
|     NCTRL_CONTR_FROM        PKG_STD.TNUMBER;                -- Нижняя граница диапазона фильтра по колонке "Контроль (контрактация)"
 | ||
|     NCTRL_CONTR_TO          PKG_STD.TNUMBER;                -- Верхняя граница диапазона фильтра по колонке "Контроль (контрактация)"
 | ||
|     RDG                     PKG_P8PANELS_VISUAL.TDATA_GRID; -- Описание таблицы
 | ||
|     RDG_ROW                 PKG_P8PANELS_VISUAL.TROW;       -- Строка таблицы
 | ||
|     RCOL_VALS               PKG_P8PANELS_VISUAL.TCOL_VALS;  -- Предопределённые значения столбцов
 | ||
|     RSTAGE_ARTS             TSTAGE_ARTS;                    -- Список статей этапа проекта
 | ||
|   begin
 | ||
|     /* Читаем фильтры */
 | ||
|     RF := PKG_P8PANELS_VISUAL.TFILTERS_FROM_XML(CFILTERS => CFILTERS);
 | ||
|     /* Найдем фильтр по контролю затрат */
 | ||
|     RF_CTRL_COST := PKG_P8PANELS_VISUAL.TFILTERS_FIND(RFILTERS => RF, SNAME => 'NCTRL_COST');
 | ||
|     PKG_P8PANELS_VISUAL.TFILTER_TO_NUMBER(RFILTER => RF_CTRL_COST, NFROM => NCTRL_COST_FROM, NTO => NCTRL_COST_TO);
 | ||
|     /* Найдем фильтр по контролю контрактации */
 | ||
|     RF_CTRL_CONTR := PKG_P8PANELS_VISUAL.TFILTERS_FIND(RFILTERS => RF, SNAME => 'NCTRL_CONTR');
 | ||
|     PKG_P8PANELS_VISUAL.TFILTER_TO_NUMBER(RFILTER => RF_CTRL_CONTR, NFROM => NCTRL_CONTR_FROM, NTO => NCTRL_CONTR_TO);
 | ||
|     /* Инициализируем таблицу данных */
 | ||
|     RDG := PKG_P8PANELS_VISUAL.TDATA_GRID_MAKE();
 | ||
|     /* Добавляем в таблицу описание колонок */
 | ||
|     PKG_P8PANELS_VISUAL.TDATA_GRID_ADD_COL_DEF(RDATA_GRID => RDG,
 | ||
|                                                SNAME      => 'NRN',
 | ||
|                                                SCAPTION   => 'Рег. номер',
 | ||
|                                                SDATA_TYPE => PKG_P8PANELS_VISUAL.SDATA_TYPE_NUMB,
 | ||
|                                                BVISIBLE   => false);
 | ||
|     PKG_P8PANELS_VISUAL.TDATA_GRID_ADD_COL_DEF(RDATA_GRID => RDG,
 | ||
|                                                SNAME      => 'SNUMB',
 | ||
|                                                SCAPTION   => 'Номер',
 | ||
|                                                SDATA_TYPE => PKG_P8PANELS_VISUAL.SDATA_TYPE_STR);
 | ||
|     PKG_P8PANELS_VISUAL.TDATA_GRID_ADD_COL_DEF(RDATA_GRID => RDG,
 | ||
|                                                SNAME      => 'SNAME',
 | ||
|                                                SCAPTION   => 'Наименование статьи',
 | ||
|                                                SDATA_TYPE => PKG_P8PANELS_VISUAL.SDATA_TYPE_STR);
 | ||
|     PKG_P8PANELS_VISUAL.TDATA_GRID_ADD_COL_DEF(RDATA_GRID => RDG,
 | ||
|                                                SNAME      => 'NPLAN',
 | ||
|                                                SCAPTION   => 'План',
 | ||
|                                                SDATA_TYPE => PKG_P8PANELS_VISUAL.SDATA_TYPE_NUMB);
 | ||
|     PKG_P8PANELS_VISUAL.TDATA_GRID_ADD_COL_DEF(RDATA_GRID => RDG,
 | ||
|                                                SNAME      => 'NCOST_FACT',
 | ||
|                                                SCAPTION   => 'Фактические затраты',
 | ||
|                                                SDATA_TYPE => PKG_P8PANELS_VISUAL.SDATA_TYPE_NUMB);
 | ||
|     PKG_P8PANELS_VISUAL.TDATA_GRID_ADD_COL_DEF(RDATA_GRID => RDG,
 | ||
|                                                SNAME      => 'NCOST_DIFF',
 | ||
|                                                SCAPTION   => 'Отклонение по затратам',
 | ||
|                                                SDATA_TYPE => PKG_P8PANELS_VISUAL.SDATA_TYPE_NUMB,
 | ||
|                                                BVISIBLE   => false);
 | ||
|     PKG_P8PANELS_VISUAL.TCOL_VALS_ADD(RCOL_VALS => RCOL_VALS, NVALUE => 0, BCLEAR => true);
 | ||
|     PKG_P8PANELS_VISUAL.TCOL_VALS_ADD(RCOL_VALS => RCOL_VALS, NVALUE => 1);
 | ||
|     PKG_P8PANELS_VISUAL.TDATA_GRID_ADD_COL_DEF(RDATA_GRID => RDG,
 | ||
|                                                SNAME      => 'NCTRL_COST',
 | ||
|                                                SCAPTION   => 'Контроль (затраты)',
 | ||
|                                                SDATA_TYPE => PKG_P8PANELS_VISUAL.SDATA_TYPE_NUMB,
 | ||
|                                                BFILTER    => true,
 | ||
|                                                RCOL_VALS  => RCOL_VALS);
 | ||
|     PKG_P8PANELS_VISUAL.TDATA_GRID_ADD_COL_DEF(RDATA_GRID => RDG,
 | ||
|                                                SNAME      => 'NCONTR',
 | ||
|                                                SCAPTION   => 'Законтрактовано',
 | ||
|                                                SDATA_TYPE => PKG_P8PANELS_VISUAL.SDATA_TYPE_NUMB);
 | ||
|     PKG_P8PANELS_VISUAL.TDATA_GRID_ADD_COL_DEF(RDATA_GRID => RDG,
 | ||
|                                                SNAME      => 'NCONTR_LEFT',
 | ||
|                                                SCAPTION   => 'Осталось законтрактовать',
 | ||
|                                                SDATA_TYPE => PKG_P8PANELS_VISUAL.SDATA_TYPE_NUMB,
 | ||
|                                                BVISIBLE   => false);
 | ||
|     PKG_P8PANELS_VISUAL.TDATA_GRID_ADD_COL_DEF(RDATA_GRID => RDG,
 | ||
|                                                SNAME      => 'NCTRL_CONTR',
 | ||
|                                                SCAPTION   => 'Контроль (контрактация)',
 | ||
|                                                SDATA_TYPE => PKG_P8PANELS_VISUAL.SDATA_TYPE_NUMB,
 | ||
|                                                BFILTER    => true,
 | ||
|                                                RCOL_VALS  => RCOL_VALS);
 | ||
|     /* Сформируем сведения по статям этапа проекта  */
 | ||
|     STAGE_ARTS_GET(NSTAGE => NSTAGE, NINC_COST => 1, NINC_CONTR => 1, RSTAGE_ARTS => RSTAGE_ARTS);
 | ||
|     /* Обходим собранные статьи */
 | ||
|     if ((RSTAGE_ARTS is not null) and (RSTAGE_ARTS.COUNT > 0)) then
 | ||
|       for I in RSTAGE_ARTS.FIRST .. RSTAGE_ARTS.LAST
 | ||
|       loop
 | ||
|         /* Если прошли фильтр */
 | ||
|         if (((NCTRL_COST_FROM is null) or
 | ||
|            ((NCTRL_COST_FROM is not null) and (NCTRL_COST_FROM = RSTAGE_ARTS(I).NCTRL_COST))) and
 | ||
|            ((NCTRL_CONTR_FROM is null) or
 | ||
|            ((NCTRL_CONTR_FROM is not null) and (NCTRL_CONTR_FROM = RSTAGE_ARTS(I).NCTRL_CONTR)))) then
 | ||
|           /* Добавляем колонки с данными */
 | ||
|           PKG_P8PANELS_VISUAL.TROW_ADD_COL(RROW   => RDG_ROW,
 | ||
|                                            SNAME  => 'NRN',
 | ||
|                                            NVALUE => RSTAGE_ARTS(I).NRN,
 | ||
|                                            BCLEAR => true);
 | ||
|           PKG_P8PANELS_VISUAL.TROW_ADD_COL(RROW => RDG_ROW, SNAME => 'SNUMB', SVALUE => RSTAGE_ARTS(I).SCODE);
 | ||
|           PKG_P8PANELS_VISUAL.TROW_ADD_COL(RROW => RDG_ROW, SNAME => 'SNAME', SVALUE => RSTAGE_ARTS(I).SNAME);
 | ||
|           PKG_P8PANELS_VISUAL.TROW_ADD_COL(RROW => RDG_ROW, SNAME => 'NPLAN', NVALUE => RSTAGE_ARTS(I).NPLAN);
 | ||
|           PKG_P8PANELS_VISUAL.TROW_ADD_COL(RROW => RDG_ROW, SNAME => 'NCOST_FACT', NVALUE => RSTAGE_ARTS(I).NCOST_FACT);
 | ||
|           PKG_P8PANELS_VISUAL.TROW_ADD_COL(RROW => RDG_ROW, SNAME => 'NCOST_DIFF', NVALUE => RSTAGE_ARTS(I).NCOST_DIFF);
 | ||
|           PKG_P8PANELS_VISUAL.TROW_ADD_COL(RROW => RDG_ROW, SNAME => 'NCTRL_COST', NVALUE => RSTAGE_ARTS(I).NCTRL_COST);
 | ||
|           PKG_P8PANELS_VISUAL.TROW_ADD_COL(RROW => RDG_ROW, SNAME => 'NCONTR', NVALUE => RSTAGE_ARTS(I).NCONTR);
 | ||
|           PKG_P8PANELS_VISUAL.TROW_ADD_COL(RROW   => RDG_ROW,
 | ||
|                                            SNAME  => 'NCONTR_LEFT',
 | ||
|                                            NVALUE => RSTAGE_ARTS(I).NCONTR_LEFT);
 | ||
|           PKG_P8PANELS_VISUAL.TROW_ADD_COL(RROW   => RDG_ROW,
 | ||
|                                            SNAME  => 'NCTRL_CONTR',
 | ||
|                                            NVALUE => RSTAGE_ARTS(I).NCTRL_CONTR);
 | ||
|           /* Добавляем строку в таблицу */
 | ||
|           PKG_P8PANELS_VISUAL.TDATA_GRID_ADD_ROW(RDATA_GRID => RDG, RROW => RDG_ROW);
 | ||
|         end if;
 | ||
|       end loop;
 | ||
|     end if;
 | ||
|     /* Сериализуем описание */
 | ||
|     COUT := PKG_P8PANELS_VISUAL.TDATA_GRID_TO_XML(RDATA_GRID => RDG, NINCLUDE_DEF => NINCLUDE_DEF);
 | ||
|   end STAGE_ARTS_LIST;
 | ||
| 
 | ||
|   /* Считывание записи соисполнителя этапа проекта */
 | ||
|   function STAGE_CONTRACTS_GET_PSPF
 | ||
|   (
 | ||
|     NPROJECTSTAGEPF         in number               -- Рег. номер соисполнителя этапа проекта
 | ||
|   ) return                  PROJECTSTAGEPF%rowtype  -- Запись соисполнителя этапа проекта
 | ||
|   is
 | ||
|     RRES                    PROJECTSTAGEPF%rowtype; -- Буфер для результата
 | ||
|   begin
 | ||
|     select PS.* into RRES from PROJECTSTAGEPF PS where PS.RN = NPROJECTSTAGEPF;
 | ||
|     return RRES;
 | ||
|   exception
 | ||
|     when NO_DATA_FOUND then
 | ||
|       PKG_MSG.RECORD_NOT_FOUND(NFLAG_SMART => 0, NDOCUMENT => NPROJECTSTAGEPF, SUNIT_TABLE => 'PROJECTSTAGEPF');
 | ||
|   end STAGE_CONTRACTS_GET_PSPF;
 | ||
|   
 | ||
|   /* Список договоров этапа проекта */
 | ||
|   procedure STAGE_CONTRACTS_COND
 | ||
|   is
 | ||
|   begin
 | ||
|     /* Установка главной таблицы */
 | ||
|     PKG_COND_BROKER.SET_TABLE(STABLE_NAME => 'PROJECTSTAGEPF');
 | ||
|     /* Этап проекта */
 | ||
|     PKG_COND_BROKER.SET_COLUMN_PRN(SCOLUMN_NAME => 'PRN');
 | ||
|     /* Соисполнитель */
 | ||
|     PKG_COND_BROKER.ADD_CONDITION_CODE(SCOLUMN_NAME    => 'AGNNAME',
 | ||
|                                        SCONDITION_NAME => 'EDAGENT',
 | ||
|                                        SJOINS          => 'PERFORMER <- RN;AGNLIST');
 | ||
|     /* Статья затрат */
 | ||
|     PKG_COND_BROKER.ADD_CONDITION_CODE(SCOLUMN_NAME    => 'CODE',
 | ||
|                                        SCONDITION_NAME => 'EDSCOST_ART',
 | ||
|                                        SJOINS          => 'COST_ARTICLE <- RN;FPDARTCL');
 | ||
|     /* Группа - этап договора */
 | ||
|     PKG_COND_BROKER.SET_GROUP(SGROUP_NAME         => 'STAGES',
 | ||
|                               STABLE_NAME         => 'STAGES',
 | ||
|                               SCOLUMN_NAME        => 'FACEACC',
 | ||
|                               SPARENT_COLUMN_NAME => 'FACEACC');
 | ||
|     /* Этап договора - номер этапа */
 | ||
|     PKG_COND_BROKER.ADD_GROUP_CONDITION_CODE(SGROUP_NAME     => 'STAGES',
 | ||
|                                              SCOLUMN_NAME    => 'NUMB',
 | ||
|                                              SCONDITION_NAME => 'EDSTAGE',
 | ||
|                                              IALIGN          => 20);
 | ||
|     /* Этап договора - дата начала этапа */
 | ||
|     PKG_COND_BROKER.ADD_GROUP_CONDITION_BETWEEN(SGROUP_NAME          => 'STAGES',
 | ||
|                                                 SCOLUMN_NAME         => 'BEGIN_DATE',
 | ||
|                                                 SCONDITION_NAME_FROM => 'EDCSTAGE_BEGIN_DATEFrom',
 | ||
|                                                 SCONDITION_NAME_TO   => 'EDCSTAGE_BEGIN_DATETo');
 | ||
|     /* Этап договора - дата окончания этапа */
 | ||
|     PKG_COND_BROKER.ADD_GROUP_CONDITION_BETWEEN(SGROUP_NAME          => 'STAGES',
 | ||
|                                                 SCOLUMN_NAME         => 'END_DATE',
 | ||
|                                                 SCONDITION_NAME_FROM => 'EDCSTAGE_END_DATEFrom',
 | ||
|                                                 SCONDITION_NAME_TO   => 'EDCSTAGE_END_DATETo');
 | ||
|     /* Этап договора - префикс договора */
 | ||
|     PKG_COND_BROKER.ADD_GROUP_CONDITION_CODE(SGROUP_NAME     => 'STAGES',
 | ||
|                                              SCOLUMN_NAME    => 'DOC_PREF',
 | ||
|                                              SCONDITION_NAME => 'EDDOC_PREF',
 | ||
|                                              SJOINS          => 'PRN <- RN;CONTRACTS',
 | ||
|                                              IALIGN          => 80);
 | ||
|     /* Этап договора - номер договора */
 | ||
|     PKG_COND_BROKER.ADD_GROUP_CONDITION_CODE(SGROUP_NAME     => 'STAGES',
 | ||
|                                              SCOLUMN_NAME    => 'DOC_NUMB',
 | ||
|                                              SCONDITION_NAME => 'EDDOC_NUMB',
 | ||
|                                              SJOINS          => 'PRN <- RN;CONTRACTS',
 | ||
|                                              IALIGN          => 80);
 | ||
|     /* Этап договора - дата договора */
 | ||
|     PKG_COND_BROKER.ADD_GROUP_CONDITION_BETWEEN(SGROUP_NAME          => 'STAGES',
 | ||
|                                                 SCOLUMN_NAME         => 'DOC_DATE',
 | ||
|                                                 SCONDITION_NAME_FROM => 'EDDOC_DATEFrom',
 | ||
|                                                 SCONDITION_NAME_TO   => 'EDDOC_DATETo',
 | ||
|                                                 SJOINS               => 'PRN <- RN;CONTRACTS');
 | ||
|     /* Контроль финансирования */
 | ||
|     if (PKG_COND_BROKER.CONDITION_EXISTS(SCONDITION_NAME => 'EDCTRL_FIN') = 1) then
 | ||
|       PKG_COND_BROKER.ADD_CLAUSE(SCLAUSE => 'PKG_P8PANELS_PROJECTS.STAGE_CONTRACTS_GET_CTRL_FIN(RN) = :EDCTRL_FIN');
 | ||
|       PKG_COND_BROKER.BIND_VARIABLE(SVARIABLE_NAME => 'EDCTRL_FIN',
 | ||
|                                     NVALUE         => PKG_COND_BROKER.GET_CONDITION_NUM(SCONDITION_NAME => 'EDCTRL_FIN'));
 | ||
|     end if;
 | ||
|     /* Контроль соисполнения */
 | ||
|     if (PKG_COND_BROKER.CONDITION_EXISTS(SCONDITION_NAME => 'EDCTRL_COEXEC') = 1) then
 | ||
|       PKG_COND_BROKER.ADD_CLAUSE(SCLAUSE => 'PKG_P8PANELS_PROJECTS.STAGE_CONTRACTS_GET_CTRL_COEXE(RN) = :EDCTRL_COEXEC');
 | ||
|       PKG_COND_BROKER.BIND_VARIABLE(SVARIABLE_NAME => 'EDCTRL_COEXEC',
 | ||
|                                     NVALUE         => PKG_COND_BROKER.GET_CONDITION_NUM(SCONDITION_NAME => 'EDCTRL_COEXEC'));
 | ||
|     end if;
 | ||
|   end STAGE_CONTRACTS_COND;
 | ||
| 
 | ||
|   /* Подбор входящих счетов на оплату соисполнителя этапа проекта */
 | ||
|   procedure STAGE_CONTRACTS_SELECT_PAY_IN
 | ||
|   (
 | ||
|     NPROJECTSTAGEPF         in number,    -- Рег. номер соисполнителя этапа проекта
 | ||
|     NIDENT                  out number    -- Идентификатор буфера подобранных (списка отмеченных записей, null - не найдено)
 | ||
|   )
 | ||
|   is
 | ||
|     NSELECTLIST             PKG_STD.TREF; -- Рег. номер добавленной записи буфера подобранных
 | ||
|   begin
 | ||
|     /* Подберём счета */
 | ||
|     for C in (select PAI.COMPANY,
 | ||
|                      PAI.RN
 | ||
|                 from PROJECTSTAGEPF PSPF,
 | ||
|                      PROJECTSTAGE   PS,
 | ||
|                      PAYACCIN       PAI
 | ||
|                where PSPF.RN = NPROJECTSTAGEPF
 | ||
|                  and PSPF.PRN = PS.RN
 | ||
|                  and PSPF.FACEACC = PAI.FACEACC
 | ||
|                  and PAI.DOC_STATE = 1
 | ||
|                  and exists (select null
 | ||
|                         from PAYACCINSPCLC PCLC
 | ||
|                        where PCLC.PRN in (select PAIS.RN from PAYACCINSPEC PAIS where PAIS.PRN = PAI.RN)
 | ||
|                          and PCLC.FACEACCOUNT = PS.FACEACC)
 | ||
|                  and exists (select null from V_USERPRIV UP where UP.CATALOG = PSPF.CRN)
 | ||
|                  and exists (select null
 | ||
|                         from V_USERPRIV UP
 | ||
|                        where UP.JUR_PERS = PSPF.JUR_PERS
 | ||
|                          and UP.UNITCODE = 'Projects')
 | ||
|                  and exists (select null from V_USERPRIV UP where UP.CATALOG = PAI.CRN))
 | ||
|     loop
 | ||
|       /* Сформируем идентификатор буфера */
 | ||
|       if (NIDENT is null) then
 | ||
|         NIDENT := GEN_IDENT();
 | ||
|       end if;
 | ||
|       /* Добавим подобранное в список отмеченных записей */
 | ||
|       P_SELECTLIST_BASE_INSERT(NIDENT       => NIDENT,
 | ||
|                                NCOMPANY     => C.COMPANY,
 | ||
|                                NDOCUMENT    => C.RN,
 | ||
|                                SUNITCODE    => 'PaymentAccountsIn',
 | ||
|                                SACTIONCODE  => null,
 | ||
|                                NCRN         => null,
 | ||
|                                NDOCUMENT1   => null,
 | ||
|                                SUNITCODE1   => null,
 | ||
|                                SACTIONCODE1 => null,
 | ||
|                                NRN          => NSELECTLIST);
 | ||
|     end loop;
 | ||
|   end STAGE_CONTRACTS_SELECT_PAY_IN;
 | ||
|   
 | ||
|   /* Подбор приходных накладных соисполнителя этапа проекта */
 | ||
|   procedure STAGE_CONTRACTS_SELECT_ININV
 | ||
|   (
 | ||
|     NPROJECTSTAGEPF         in number,    -- Рег. номер соисполнителя этапа проекта
 | ||
|     NIDENT                  out number    -- Идентификатор буфера подобранных (списка отмеченных записей, null - не найдено)
 | ||
|   )
 | ||
|   is
 | ||
|     NSELECTLIST             PKG_STD.TREF; -- Рег. номер добавленной записи буфера подобранных
 | ||
|   begin
 | ||
|     /* Подберём счета */
 | ||
|     for C in (select I.COMPANY,
 | ||
|                      I.RN
 | ||
|                 from PROJECTSTAGEPF PSPF,
 | ||
|                      PROJECTSTAGE   PS,
 | ||
|                      ININVOICES     I
 | ||
|                where PSPF.RN = NPROJECTSTAGEPF
 | ||
|                  and PSPF.PRN = PS.RN
 | ||
|                  and PSPF.FACEACC = I.FACEACC
 | ||
|                  and I.STATUS = 2
 | ||
|                  and exists (select null
 | ||
|                         from ININVOICESSPC ICLC
 | ||
|                        where ICLC.PRN in (select ISP.RN from ININVOICESSPECS ISP where ISP.PRN = I.RN)
 | ||
|                          and ICLC.FACEACCOUNT = PS.FACEACC)
 | ||
|                  and exists (select null from V_USERPRIV UP where UP.CATALOG = PSPF.CRN)
 | ||
|                  and exists (select null
 | ||
|                         from V_USERPRIV UP
 | ||
|                        where UP.JUR_PERS = PSPF.JUR_PERS
 | ||
|                          and UP.UNITCODE = 'Projects')
 | ||
|                  and exists (select /*+ INDEX(UP I_USERPRIV_CATALOG_ROLEID) */
 | ||
|                        null
 | ||
|                         from USERPRIV UP
 | ||
|                        where UP.CATALOG = I.CRN
 | ||
|                          and UP.ROLEID in (select /*+ INDEX(UR I_USERROLES_AUTHID_FK) */
 | ||
|                                             UR.ROLEID
 | ||
|                                              from USERROLES UR
 | ||
|                                             where UR.AUTHID = UTILIZER)
 | ||
|                       union all
 | ||
|                       select /*+ INDEX(UP I_USERPRIV_CATALOG_AUTHID) */
 | ||
|                        null
 | ||
|                         from USERPRIV UP
 | ||
|                        where UP.CATALOG = I.CRN
 | ||
|                          and UP.AUTHID = UTILIZER))
 | ||
|     loop
 | ||
|       /* Сформируем идентификатор буфера */
 | ||
|       if (NIDENT is null) then
 | ||
|         NIDENT := GEN_IDENT();
 | ||
|       end if;
 | ||
|       /* Добавим подобранное в список отмеченных записей */
 | ||
|       P_SELECTLIST_BASE_INSERT(NIDENT       => NIDENT,
 | ||
|                                NCOMPANY     => C.COMPANY,
 | ||
|                                NDOCUMENT    => C.RN,
 | ||
|                                SUNITCODE    => 'IncomingInvoices',
 | ||
|                                SACTIONCODE  => null,
 | ||
|                                NCRN         => null,
 | ||
|                                NDOCUMENT1   => null,
 | ||
|                                SUNITCODE1   => null,
 | ||
|                                SACTIONCODE1 => null,
 | ||
|                                NRN          => NSELECTLIST);
 | ||
|     end loop;
 | ||
|   end STAGE_CONTRACTS_SELECT_ININV;
 | ||
| 
 | ||
|   /* Подбор платежей финансирования соисполнителя этапа проекта */
 | ||
|   procedure STAGE_CONTRACTS_SELECT_FIN_OUT
 | ||
|   (
 | ||
|     NPROJECTSTAGEPF         in number,    -- Рег. номер соисполнителя этапа проекта
 | ||
|     NIDENT                  out number    -- Идентификатор буфера подобранных (списка отмеченных записей, null - не найдено)
 | ||
|   )
 | ||
|   is
 | ||
|     NSELECTLIST             PKG_STD.TREF; -- Рег. номер добавленной записи буфера подобранных
 | ||
|   begin
 | ||
|     /* Подберём платежи */
 | ||
|     for C in (select PN.COMPANY,
 | ||
|                      PN.RN
 | ||
|                 from PROJECTSTAGEPF PSPF,
 | ||
|                      PROJECTSTAGE   PS,
 | ||
|                      PAYNOTES       PN
 | ||
|                where PSPF.RN = NPROJECTSTAGEPF
 | ||
|                  and PSPF.PRN = PS.RN
 | ||
|                  and PSPF.FACEACC = PN.FACEACC
 | ||
|                  and PN.SIGNPLAN = 0
 | ||
|                  and exists (select null
 | ||
|                         from PAYNOTESCLC PNCLC
 | ||
|                        where PNCLC.PRN = PN.RN
 | ||
|                          and PNCLC.FACEACCOUNT = PS.FACEACC)
 | ||
|                  and exists (select null from V_USERPRIV UP where UP.CATALOG = PSPF.CRN)
 | ||
|                  and exists (select null
 | ||
|                         from V_USERPRIV UP
 | ||
|                        where UP.JUR_PERS = PSPF.JUR_PERS
 | ||
|                          and UP.UNITCODE = 'Projects')
 | ||
|                  and exists (select /*+ INDEX(UP I_USERPRIV_CATALOG_ROLEID) */
 | ||
|                        null
 | ||
|                         from USERPRIV UP
 | ||
|                        where UP.CATALOG = PN.CRN
 | ||
|                          and UP.ROLEID in (select /*+ INDEX(UR I_USERROLES_AUTHID_FK) */
 | ||
|                                             UR.ROLEID
 | ||
|                                              from USERROLES UR
 | ||
|                                             where UR.AUTHID = UTILIZER)
 | ||
|                       union all
 | ||
|                       select /*+ INDEX(UP I_USERPRIV_CATALOG_AUTHID) */
 | ||
|                        null
 | ||
|                         from USERPRIV UP
 | ||
|                        where UP.CATALOG = PN.CRN
 | ||
|                          and UP.AUTHID = UTILIZER)
 | ||
|                  and exists (select /*+ INDEX(UP I_USERPRIV_JUR_PERS_ROLEID) */
 | ||
|                        null
 | ||
|                         from USERPRIV UP
 | ||
|                        where UP.JUR_PERS = PN.JUR_PERS
 | ||
|                          and UP.UNITCODE = 'PayNotes'
 | ||
|                          and UP.ROLEID in (select /*+ INDEX(UR I_USERROLES_AUTHID_FK) */
 | ||
|                                             UR.ROLEID
 | ||
|                                              from USERROLES UR
 | ||
|                                             where UR.AUTHID = UTILIZER)
 | ||
|                       union all
 | ||
|                       select /*+ INDEX(UP I_USERPRIV_JUR_PERS_AUTHID) */
 | ||
|                        null
 | ||
|                         from USERPRIV UP
 | ||
|                        where UP.JUR_PERS = PN.JUR_PERS
 | ||
|                          and UP.UNITCODE = 'PayNotes'
 | ||
|                          and UP.AUTHID = UTILIZER))
 | ||
|     loop
 | ||
|       /* Сформируем идентификатор буфера */
 | ||
|       if (NIDENT is null) then
 | ||
|         NIDENT := GEN_IDENT();
 | ||
|       end if;
 | ||
|       /* Добавим подобранное в список отмеченных записей */
 | ||
|       P_SELECTLIST_BASE_INSERT(NIDENT       => NIDENT,
 | ||
|                                NCOMPANY     => C.COMPANY,
 | ||
|                                NDOCUMENT    => C.RN,
 | ||
|                                SUNITCODE    => 'PayNotes',
 | ||
|                                SACTIONCODE  => null,
 | ||
|                                NCRN         => null,
 | ||
|                                NDOCUMENT1   => null,
 | ||
|                                SUNITCODE1   => null,
 | ||
|                                SACTIONCODE1 => null,
 | ||
|                                NRN          => NSELECTLIST);
 | ||
|     end loop;
 | ||
|   end STAGE_CONTRACTS_SELECT_FIN_OUT;
 | ||
| 
 | ||
|   /* Получение состояния финансирования по договору соисполнителя этапа проекта */
 | ||
|   function STAGE_CONTRACTS_GET_CTRL_FIN
 | ||
|   (
 | ||
|     NPROJECTSTAGEPF         in number        -- Рег. номер соисполнителя этапа проекта
 | ||
|   ) return                  number           -- Состояние (null - не определено, 0 - без отклонений, 1 - есть отклонения)
 | ||
|   is
 | ||
|     NTMP                    PKG_STD.TNUMBER; -- Буфер для вызова процедуры расчёта
 | ||
|     NCTRL_FIN               PKG_STD.TNUMBER; -- Буфер для результата
 | ||
|   begin
 | ||
|     /* Получим сведения по договору соисполнителя этапа */
 | ||
|     STAGE_CONTRACTS_GET(NPROJECTSTAGEPF => NPROJECTSTAGEPF,
 | ||
|                         NINC_FIN        => 1,
 | ||
|                         NINC_COEXEC     => 0,
 | ||
|                         NPAY_IN         => NTMP,
 | ||
|                         NFIN_OUT        => NTMP,
 | ||
|                         NPAY_IN_REST    => NTMP,
 | ||
|                         NFIN_REST       => NTMP,
 | ||
|                         NCTRL_FIN       => NCTRL_FIN,
 | ||
|                         NCOEXEC_IN      => NTMP,
 | ||
|                         NCOEXEC_REST    => NTMP,
 | ||
|                         NCTRL_COEXEC    => NTMP);
 | ||
|     /* Вернём результат */
 | ||
|     return NCTRL_FIN;
 | ||
|   end STAGE_CONTRACTS_GET_CTRL_FIN;
 | ||
|   
 | ||
|   /* Получение состояния соисполнения по договору соисполнителя этапа проекта */
 | ||
|   function STAGE_CONTRACTS_GET_CTRL_COEXE
 | ||
|   (
 | ||
|     NPROJECTSTAGEPF         in number        -- Рег. номер соисполнителя этапа проекта
 | ||
|   ) return                  number           -- Состояние (null - не определено, 0 - без отклонений, 1 - есть отклонения)
 | ||
|   is
 | ||
|     NTMP                    PKG_STD.TNUMBER; -- Буфер для вызова процедуры расчёта
 | ||
|     NCTRL_COEXEC            PKG_STD.TNUMBER; -- Буфер для результата
 | ||
|   begin
 | ||
|     /* Получим сведения по договору соисполнителя этапа */
 | ||
|     STAGE_CONTRACTS_GET(NPROJECTSTAGEPF => NPROJECTSTAGEPF,
 | ||
|                         NINC_FIN        => 0,
 | ||
|                         NINC_COEXEC     => 1,
 | ||
|                         NPAY_IN         => NTMP,
 | ||
|                         NFIN_OUT        => NTMP,
 | ||
|                         NPAY_IN_REST    => NTMP,
 | ||
|                         NFIN_REST       => NTMP,
 | ||
|                         NCTRL_FIN       => NTMP,
 | ||
|                         NCOEXEC_IN      => NTMP,
 | ||
|                         NCOEXEC_REST    => NTMP,
 | ||
|                         NCTRL_COEXEC    => NCTRL_COEXEC);
 | ||
|     /* Вернём результат */
 | ||
|     return NCTRL_COEXEC;
 | ||
|   end STAGE_CONTRACTS_GET_CTRL_COEXE;
 | ||
| 
 | ||
|   /* Получение сведений по договору соисполнителя этапа проекта */
 | ||
|   procedure STAGE_CONTRACTS_GET
 | ||
|   (
 | ||
|     NPROJECTSTAGEPF         in number,              -- Рег. номер соисполнителя этапа проекта
 | ||
|     NINC_FIN                in number := 0,         -- Включить сведения о финансировании (0 - нет, 1 - да)
 | ||
|     NINC_COEXEC             in number := 0,         -- Включить сведения о соисполнении (0 - нет, 1 - да)    
 | ||
|     NPAY_IN                 out number,             -- Сведения о финансировании - сумма акцептованных счетов на оплату
 | ||
|     NFIN_OUT                out number,             -- Сведения о финансировании - сумма оплаченных счетов на оплату
 | ||
|     NPAY_IN_REST            out number,             -- Сведения о финансировании - сумма оставшихся к оплате счетов на оплату
 | ||
|     NFIN_REST               out number,             -- Сведения о финансировании - общий остаток к оплате по договору
 | ||
|     NCTRL_FIN               out number,             -- Сведения о финансировании - состояние (null - не определено, 0 - без отклонений, 1 - есть отклонения)
 | ||
|     NCOEXEC_IN              out number,             -- Сведения о соисполнении - получено актов/накладных
 | ||
|     NCOEXEC_REST            out number,             -- Сведения о соисполнении - остаток к актированию/поставке
 | ||
|     NCTRL_COEXEC            out number              -- Сведения о соисполнении - состояние (null - не определено, 0 - без отклонений, 1 - есть отклонения)
 | ||
|   )
 | ||
|   is
 | ||
|     RPSPF                   PROJECTSTAGEPF%rowtype; -- Запись соисполнителя этапа проекта
 | ||
|     RPS                     PROJECTSTAGE%rowtype;   -- Запись родительского этапа проекта
 | ||
|     NDAYS_LEFT              PKG_STD.TNUMBER;        -- Остаток дней до завершения родительского этапа проекта
 | ||
|   begin
 | ||
|     /* Читаем запись соисполнителя этапа проекта */
 | ||
|     RPSPF := STAGE_CONTRACTS_GET_PSPF(NPROJECTSTAGEPF => NPROJECTSTAGEPF);
 | ||
|     /* Читаем записб родительского этапа проекта */
 | ||
|     RPS := STAGES_GET(NRN => RPSPF.PRN);
 | ||
|     /* Инициализируем выходные значения */
 | ||
|     NPAY_IN      := 0;
 | ||
|     NFIN_OUT     := 0;
 | ||
|     NPAY_IN_REST := 0;
 | ||
|     NFIN_REST    := RPSPF.COST_PLAN;
 | ||
|     NCTRL_FIN    := null;
 | ||
|     NCOEXEC_IN   := 0;
 | ||
|     NCOEXEC_REST := RPSPF.COST_PLAN;
 | ||
|     NCTRL_COEXEC := null;
 | ||
|     /* Если ЛС этапа проекта задан */
 | ||
|     if (RPS.FACEACC is not null) then
 | ||
|       /* Если нужны сведения о финансировании */
 | ||
|       if (NINC_FIN = 1) then
 | ||
|         /* Сумма акцептованных счетов на оплату - по ВСО с ЛС соисполнителя этапа проекта, в калькуляции которых присутствует ЛС затрат этапа проекта */
 | ||
|         select sum(PAI.SUMMWITHNDS * PAI.FA_BASECOURS)
 | ||
|           into NPAY_IN
 | ||
|           from PAYACCIN PAI
 | ||
|          where PAI.FACEACC = RPSPF.FACEACC
 | ||
|            and PAI.DOC_STATE = 1
 | ||
|            and exists (select null
 | ||
|                   from PAYACCINSPCLC PCLC
 | ||
|                  where PCLC.PRN in (select PAIS.RN from PAYACCINSPEC PAIS where PAIS.PRN = PAI.RN)
 | ||
|                    and PCLC.FACEACCOUNT = RPS.FACEACC);
 | ||
|         /* Сумма оплаченных счетов на оплату - по расходным факт. ЖП с ЛС соисполнителя этапа проекта, в калькуляции которых присутствует ЛС затрат этапа проекта */
 | ||
|         select sum(PN.PAY_SUM * (PN.CURR_RATE_BASE / PN.CURR_RATE))
 | ||
|           into NFIN_OUT
 | ||
|           from PAYNOTES PN
 | ||
|          where PN.FACEACC = RPSPF.FACEACC
 | ||
|            and PN.SIGNPLAN = 0
 | ||
|            and exists (select null
 | ||
|                   from PAYNOTESCLC PNCLC
 | ||
|                  where PNCLC.PRN = PN.RN
 | ||
|                    and PNCLC.FACEACCOUNT = RPS.FACEACC);
 | ||
|         /* Сумма оставшихся к оплате счетов на оплату */
 | ||
|         NPAY_IN_REST := COALESCE(NPAY_IN, 0) - COALESCE(NFIN_OUT, 0);
 | ||
|         /* Общий остаток к оплате по договору */
 | ||
|         NFIN_REST := RPSPF.COST_PLAN - COALESCE(NFIN_OUT, 0);
 | ||
|         /* Контроль отклонений по финансированию (состояние) */
 | ||
|         if (NPAY_IN is null) then
 | ||
|           NCTRL_FIN := null;
 | ||
|         else
 | ||
|           if (NPAY_IN_REST > 0) then
 | ||
|             NCTRL_FIN := 1;
 | ||
|           else
 | ||
|             NCTRL_FIN := 0;
 | ||
|           end if;
 | ||
|         end if;
 | ||
|         /* Приведение значений */
 | ||
|         NPAY_IN  := COALESCE(NPAY_IN, 0);
 | ||
|         NFIN_OUT := COALESCE(NFIN_OUT, 0);
 | ||
|       end if;
 | ||
|       /* Если нужны сведения о соисполнении */
 | ||
|       if (NINC_COEXEC = 1) then
 | ||
|         /* Получено актов/накладных - по отработанным как факт ПН с ЛС соисполнителя этапа проекта, в калькуляции которых присутствует ЛС затрат этапа проекта */
 | ||
|         select sum(I.SUMMTAX * (I.CURBASECOURS / I.CURCOURS))
 | ||
|           into NCOEXEC_IN
 | ||
|           from ININVOICES I
 | ||
|          where I.FACEACC = RPSPF.FACEACC
 | ||
|            and I.STATUS = 2
 | ||
|            and exists (select null
 | ||
|                   from ININVOICESSPC ICLC
 | ||
|                  where ICLC.PRN in (select ISP.RN from ININVOICESSPECS ISP where ISP.PRN = I.RN)
 | ||
|                    and ICLC.FACEACCOUNT = RPS.FACEACC);
 | ||
|         /* Общий остаток к актированию/поставке */
 | ||
|         NCOEXEC_REST := RPSPF.COST_PLAN - COALESCE(NCOEXEC_IN, 0);
 | ||
|         /* Контроль отклонений по соисполнению (состояние) */
 | ||
|         NDAYS_LEFT := STAGES_GET_DAYS_LEFT(NRN => RPS.RN);
 | ||
|         if (NDAYS_LEFT is null) then
 | ||
|           NCTRL_COEXEC := null;
 | ||
|         else
 | ||
|           if ((NCOEXEC_REST > 0) and (NDAYS_LEFT < NDAYS_LEFT_LIMIT)) then
 | ||
|             NCTRL_COEXEC := 1;
 | ||
|           else
 | ||
|             NCTRL_COEXEC := 0;
 | ||
|           end if;
 | ||
|         end if;
 | ||
|         /* Приведение значений */
 | ||
|         NCOEXEC_IN := COALESCE(NCOEXEC_IN, 0);
 | ||
|       end if;
 | ||
|     end if;
 | ||
|   end STAGE_CONTRACTS_GET;
 | ||
|   
 | ||
|   /* Список договоров этапа проекта */
 | ||
|   procedure STAGE_CONTRACTS_LIST
 | ||
|   (
 | ||
|     NSTAGE                  in number,                             -- Рег. номер этапа проекта
 | ||
|     NPAGE_NUMBER            in number,                             -- Номер страницы (игнорируется при NPAGE_SIZE=0)
 | ||
|     NPAGE_SIZE              in number,                             -- Количество записей на странице (0 - все)
 | ||
|     CFILTERS                in clob,                               -- Фильтры
 | ||
|     CORDERS                 in clob,                               -- Сортировки
 | ||
|     NINCLUDE_DEF            in number,                             -- Признак включения описания колонок таблицы в ответ
 | ||
|     COUT                    out clob                               -- Сериализованная таблица данных
 | ||
|   )
 | ||
|   is
 | ||
|     NCOMPANY                PKG_STD.TREF := GET_SESSION_COMPANY(); -- Организация сеанса
 | ||
|     NIDENT                  PKG_STD.TREF := GEN_IDENT();           -- Идентификатор отбора
 | ||
|     RF                      PKG_P8PANELS_VISUAL.TFILTERS;          -- Фильтры
 | ||
|     RO                      PKG_P8PANELS_VISUAL.TORDERS;           -- Сортировки
 | ||
|     RDG                     PKG_P8PANELS_VISUAL.TDATA_GRID;        -- Описание таблицы
 | ||
|     RDG_ROW                 PKG_P8PANELS_VISUAL.TROW;              -- Строка таблицы
 | ||
|     RCOL_VALS               PKG_P8PANELS_VISUAL.TCOL_VALS;         -- Предопределённые значения столбцов
 | ||
|     NROW_FROM               PKG_STD.TREF;                          -- Номер строки с
 | ||
|     NROW_TO                 PKG_STD.TREF;                          -- Номер строки по
 | ||
|     CSQL                    clob;                                  -- Буфер для запроса
 | ||
|     ICURSOR                 integer;                               -- Курсор для исполнения запроса
 | ||
|     NPROJECTSTAGEPF         PKG_STD.TREF;                          -- Рег. номер соисполнителя этапа проекта    
 | ||
|     NPAY_IN                 PKG_STD.TNUMBER;                       -- Сведения о финансировании - сумма акцептованных счетов на оплату
 | ||
|     NFIN_OUT                PKG_STD.TNUMBER;                       -- Сведения о финансировании - сумма оплаченных счетов на оплату
 | ||
|     NPAY_IN_REST            PKG_STD.TNUMBER;                       -- Сведения о финансировании - сумма оставшихся к оплате счетов на оплату
 | ||
|     NFIN_REST               PKG_STD.TNUMBER;                       -- Сведения о финансировании - общий остаток к оплате по договору
 | ||
|     NCTRL_FIN               PKG_STD.TNUMBER;                       -- Сведения о финансировании - состояние (null - не определено, 0 - без отклонений, 1 - есть отклонения)
 | ||
|     NCOEXEC_IN              PKG_STD.TNUMBER;                       -- Сведения о соисполнении - получено актов/накладных
 | ||
|     NCOEXEC_REST            PKG_STD.TNUMBER;                       -- Сведения о соисполнении - остаток к актированию/поставке
 | ||
|     NCTRL_COEXEC            PKG_STD.TNUMBER;                       -- Сведения о соисполнении - состояние (null - не определено, 0 - без отклонений, 1 - есть отклонения)
 | ||
|   begin
 | ||
|     /* Читаем фильтры */
 | ||
|     RF := PKG_P8PANELS_VISUAL.TFILTERS_FROM_XML(CFILTERS => CFILTERS);
 | ||
|     /* Читем сортировки */
 | ||
|     RO := PKG_P8PANELS_VISUAL.TORDERS_FROM_XML(CORDERS => CORDERS);
 | ||
|     /* Преобразуем номер и размер страницы в номер строк с и по */
 | ||
|     PKG_P8PANELS_VISUAL.UTL_ROWS_LIMITS_CALC(NPAGE_NUMBER => NPAGE_NUMBER,
 | ||
|                                              NPAGE_SIZE   => NPAGE_SIZE,
 | ||
|                                              NROW_FROM    => NROW_FROM,
 | ||
|                                              NROW_TO      => NROW_TO);
 | ||
|     /* Инициализируем таблицу данных */
 | ||
|     RDG := PKG_P8PANELS_VISUAL.TDATA_GRID_MAKE();
 | ||
|     /* Добавляем в таблицу описание колонок */
 | ||
|     PKG_P8PANELS_VISUAL.TDATA_GRID_ADD_COL_DEF(RDATA_GRID => RDG,
 | ||
|                                                SNAME      => 'NRN',
 | ||
|                                                SCAPTION   => 'Рег. номер',
 | ||
|                                                SDATA_TYPE => PKG_P8PANELS_VISUAL.SDATA_TYPE_NUMB,
 | ||
|                                                BVISIBLE   => false);
 | ||
|     PKG_P8PANELS_VISUAL.TDATA_GRID_ADD_COL_DEF(RDATA_GRID => RDG,
 | ||
|                                                SNAME      => 'SDOC_PREF',
 | ||
|                                                SCAPTION   => 'Префикс',
 | ||
|                                                SDATA_TYPE => PKG_P8PANELS_VISUAL.SDATA_TYPE_STR,
 | ||
|                                                SCOND_FROM => 'EDDOC_PREF',
 | ||
|                                                BORDER     => true,
 | ||
|                                                BFILTER    => true);
 | ||
|     PKG_P8PANELS_VISUAL.TDATA_GRID_ADD_COL_DEF(RDATA_GRID => RDG,
 | ||
|                                                SNAME      => 'SLNK_UNIT_SDOC_PREF',
 | ||
|                                                SCAPTION   => 'Префикс (код раздела ссылки)',
 | ||
|                                                SDATA_TYPE => PKG_P8PANELS_VISUAL.SDATA_TYPE_STR,
 | ||
|                                                BVISIBLE   => false);
 | ||
|     PKG_P8PANELS_VISUAL.TDATA_GRID_ADD_COL_DEF(RDATA_GRID => RDG,
 | ||
|                                                SNAME      => 'NLNK_DOCUMENT_SDOC_PREF',
 | ||
|                                                SCAPTION   => 'Префикс (документ ссылки)',
 | ||
|                                                SDATA_TYPE => PKG_P8PANELS_VISUAL.SDATA_TYPE_NUMB,
 | ||
|                                                BVISIBLE   => false);
 | ||
|     PKG_P8PANELS_VISUAL.TDATA_GRID_ADD_COL_DEF(RDATA_GRID => RDG,
 | ||
|                                                SNAME      => 'SDOC_NUMB',
 | ||
|                                                SCAPTION   => 'Номер',
 | ||
|                                                SDATA_TYPE => PKG_P8PANELS_VISUAL.SDATA_TYPE_STR,
 | ||
|                                                SCOND_FROM => 'EDDOC_NUMB',
 | ||
|                                                BORDER     => true,
 | ||
|                                                BFILTER    => true);
 | ||
|     PKG_P8PANELS_VISUAL.TDATA_GRID_ADD_COL_DEF(RDATA_GRID => RDG,
 | ||
|                                                SNAME      => 'SLNK_UNIT_SDOC_NUMB',
 | ||
|                                                SCAPTION   => 'Номер (код раздела ссылки)',
 | ||
|                                                SDATA_TYPE => PKG_P8PANELS_VISUAL.SDATA_TYPE_STR,
 | ||
|                                                BVISIBLE   => false);
 | ||
|     PKG_P8PANELS_VISUAL.TDATA_GRID_ADD_COL_DEF(RDATA_GRID => RDG,
 | ||
|                                                SNAME      => 'NLNK_DOCUMENT_SDOC_NUMB',
 | ||
|                                                SCAPTION   => 'Номер (документ ссылки)',
 | ||
|                                                SDATA_TYPE => PKG_P8PANELS_VISUAL.SDATA_TYPE_NUMB,
 | ||
|                                                BVISIBLE   => false);
 | ||
|     PKG_P8PANELS_VISUAL.TDATA_GRID_ADD_COL_DEF(RDATA_GRID => RDG,
 | ||
|                                                SNAME      => 'DDOC_DATE',
 | ||
|                                                SCAPTION   => 'Дата',
 | ||
|                                                SDATA_TYPE => PKG_P8PANELS_VISUAL.SDATA_TYPE_DATE,
 | ||
|                                                SCOND_FROM => 'EDDOC_DATEFrom',
 | ||
|                                                SCOND_TO   => 'EDDOC_DATETo',
 | ||
|                                                BORDER     => true,
 | ||
|                                                BFILTER    => true);
 | ||
|     PKG_P8PANELS_VISUAL.TDATA_GRID_ADD_COL_DEF(RDATA_GRID => RDG,
 | ||
|                                                SNAME      => 'SEXT_NUMBER',
 | ||
|                                                SCAPTION   => 'Внешний номер',
 | ||
|                                                SDATA_TYPE => PKG_P8PANELS_VISUAL.SDATA_TYPE_STR,
 | ||
|                                                BVISIBLE   => false);
 | ||
|     PKG_P8PANELS_VISUAL.TDATA_GRID_ADD_COL_DEF(RDATA_GRID => RDG,
 | ||
|                                                SNAME      => 'SAGENT',
 | ||
|                                                SCAPTION   => 'Соисполнитель',
 | ||
|                                                SDATA_TYPE => PKG_P8PANELS_VISUAL.SDATA_TYPE_STR,
 | ||
|                                                SCOND_FROM => 'EDAGENT',
 | ||
|                                                BORDER     => true,
 | ||
|                                                BFILTER    => true);
 | ||
|     PKG_P8PANELS_VISUAL.TDATA_GRID_ADD_COL_DEF(RDATA_GRID => RDG,
 | ||
|                                                SNAME      => 'SAGENT_INN',
 | ||
|                                                SCAPTION   => 'ИНН соисполнителя',
 | ||
|                                                SDATA_TYPE => PKG_P8PANELS_VISUAL.SDATA_TYPE_STR,
 | ||
|                                                BVISIBLE   => false);
 | ||
|     PKG_P8PANELS_VISUAL.TDATA_GRID_ADD_COL_DEF(RDATA_GRID => RDG,
 | ||
|                                                SNAME      => 'SAGENT_KPP',
 | ||
|                                                SCAPTION   => 'КПП соисполнителя',
 | ||
|                                                SDATA_TYPE => PKG_P8PANELS_VISUAL.SDATA_TYPE_STR,
 | ||
|                                                BVISIBLE   => false);
 | ||
|     PKG_P8PANELS_VISUAL.TDATA_GRID_ADD_COL_DEF(RDATA_GRID => RDG,
 | ||
|                                                SNAME      => 'SGOVCNTRID',
 | ||
|                                                SCAPTION   => 'ИГК',
 | ||
|                                                SDATA_TYPE => PKG_P8PANELS_VISUAL.SDATA_TYPE_STR,
 | ||
|                                                BVISIBLE   => false);
 | ||
|     PKG_P8PANELS_VISUAL.TDATA_GRID_ADD_COL_DEF(RDATA_GRID => RDG,
 | ||
|                                                SNAME      => 'SCSTAGE',
 | ||
|                                                SCAPTION   => 'Этап',
 | ||
|                                                SDATA_TYPE => PKG_P8PANELS_VISUAL.SDATA_TYPE_STR,
 | ||
|                                                SCOND_FROM => 'EDSTAGE',
 | ||
|                                                BORDER     => true,
 | ||
|                                                BFILTER    => true);
 | ||
|     PKG_P8PANELS_VISUAL.TDATA_GRID_ADD_COL_DEF(RDATA_GRID => RDG,
 | ||
|                                                SNAME      => 'SCSTAGE_DESCRIPTION',
 | ||
|                                                SCAPTION   => 'Описание этапа',
 | ||
|                                                SDATA_TYPE => PKG_P8PANELS_VISUAL.SDATA_TYPE_STR,
 | ||
|                                                BVISIBLE   => false);
 | ||
|     PKG_P8PANELS_VISUAL.TDATA_GRID_ADD_COL_DEF(RDATA_GRID => RDG,
 | ||
|                                                SNAME      => 'DCSTAGE_BEGIN_DATE',
 | ||
|                                                SCAPTION   => 'Дата начала',
 | ||
|                                                SDATA_TYPE => PKG_P8PANELS_VISUAL.SDATA_TYPE_DATE,
 | ||
|                                                SCOND_FROM => 'EDCSTAGE_BEGIN_DATEFrom',
 | ||
|                                                SCOND_TO   => 'EDCSTAGE_BEGIN_DATETo',
 | ||
|                                                BORDER     => true,
 | ||
|                                                BFILTER    => true);
 | ||
|     PKG_P8PANELS_VISUAL.TDATA_GRID_ADD_COL_DEF(RDATA_GRID => RDG,
 | ||
|                                                SNAME      => 'DCSTAGE_END_DATE',
 | ||
|                                                SCAPTION   => 'Дата окончания',
 | ||
|                                                SDATA_TYPE => PKG_P8PANELS_VISUAL.SDATA_TYPE_DATE,
 | ||
|                                                SCOND_FROM => 'EDCSTAGE_END_DATEFrom',
 | ||
|                                                SCOND_TO   => 'EDCSTAGE_END_DATETo',
 | ||
|                                                BORDER     => true,
 | ||
|                                                BFILTER    => true);
 | ||
|     PKG_P8PANELS_VISUAL.TDATA_GRID_ADD_COL_DEF(RDATA_GRID => RDG,
 | ||
|                                                SNAME      => 'NSUMM',
 | ||
|                                                SCAPTION   => 'Сумма',
 | ||
|                                                SDATA_TYPE => PKG_P8PANELS_VISUAL.SDATA_TYPE_NUMB,
 | ||
|                                                BVISIBLE   => false);
 | ||
|     PKG_P8PANELS_VISUAL.TDATA_GRID_ADD_COL_DEF(RDATA_GRID => RDG,
 | ||
|                                                SNAME      => 'SCURR',
 | ||
|                                                SCAPTION   => 'Валюта',
 | ||
|                                                SDATA_TYPE => PKG_P8PANELS_VISUAL.SDATA_TYPE_STR,
 | ||
|                                                BVISIBLE   => false);
 | ||
|     PKG_P8PANELS_VISUAL.TDATA_GRID_ADD_COL_DEF(RDATA_GRID => RDG,
 | ||
|                                                SNAME      => 'SCOST_ART',
 | ||
|                                                SCAPTION   => 'Статья затрат',
 | ||
|                                                SDATA_TYPE => PKG_P8PANELS_VISUAL.SDATA_TYPE_STR,
 | ||
|                                                SCOND_FROM => 'EDSCOST_ART',
 | ||
|                                                BORDER     => true,
 | ||
|                                                BFILTER    => true);
 | ||
|     PKG_P8PANELS_VISUAL.TDATA_GRID_ADD_COL_DEF(RDATA_GRID => RDG,
 | ||
|                                                SNAME      => 'NPAY_IN',
 | ||
|                                                SCAPTION   => 'Акцептовано счетов на оплату',
 | ||
|                                                SDATA_TYPE => PKG_P8PANELS_VISUAL.SDATA_TYPE_NUMB,
 | ||
|                                                BVISIBLE   => false);
 | ||
|     PKG_P8PANELS_VISUAL.TDATA_GRID_ADD_COL_DEF(RDATA_GRID => RDG,
 | ||
|                                                SNAME      => 'NFIN_OUT',
 | ||
|                                                SCAPTION   => 'Оплачено счетов',
 | ||
|                                                SDATA_TYPE => PKG_P8PANELS_VISUAL.SDATA_TYPE_NUMB,
 | ||
|                                                BVISIBLE   => false);
 | ||
|     PKG_P8PANELS_VISUAL.TDATA_GRID_ADD_COL_DEF(RDATA_GRID => RDG,
 | ||
|                                                SNAME      => 'NPAY_IN_REST',
 | ||
|                                                SCAPTION   => 'Осталось оплатить счетов',
 | ||
|                                                SDATA_TYPE => PKG_P8PANELS_VISUAL.SDATA_TYPE_NUMB,
 | ||
|                                                BVISIBLE   => false);
 | ||
|     PKG_P8PANELS_VISUAL.TCOL_VALS_ADD(RCOL_VALS => RCOL_VALS, NVALUE => 0, BCLEAR => true);
 | ||
|     PKG_P8PANELS_VISUAL.TCOL_VALS_ADD(RCOL_VALS => RCOL_VALS, NVALUE => 1);                                               
 | ||
|     PKG_P8PANELS_VISUAL.TDATA_GRID_ADD_COL_DEF(RDATA_GRID => RDG,
 | ||
|                                                SNAME      => 'NCTRL_FIN',
 | ||
|                                                SCAPTION   => 'Фин-е (исх.)',
 | ||
|                                                SDATA_TYPE => PKG_P8PANELS_VISUAL.SDATA_TYPE_NUMB,
 | ||
|                                                SCOND_FROM => 'EDCTRL_FIN',                                               
 | ||
|                                                BORDER     => false,
 | ||
|                                                BFILTER    => true,
 | ||
|                                                RCOL_VALS  => RCOL_VALS,
 | ||
|                                                SHINT      => '<b>Финансирование (исходящее)</b> - контроль оплаты счетов, выставленных соисполнителем в рамках договора.<br>' ||
 | ||
|                                                              '<b style="color:red">Требует внимания</b> - не все выставленные соисполнителем акцептованные счета оплачены.<br>' ||
 | ||
|                                                              '<b style="color:green">В норме</b> - нет описанных выше отклонений.<br>' ||
 | ||
|                                                              '<b style="color:gray">Пусто</b> - в Системе не хватает данных для рассчёта. Убедитесь, что для договора с соисполнителем аккуратно ведётся учёт первичных документов оперативного учёта (входящих счетов на оплату).');
 | ||
|     PKG_P8PANELS_VISUAL.TDATA_GRID_ADD_COL_DEF(RDATA_GRID => RDG,
 | ||
|                                                SNAME      => 'NFIN_REST',
 | ||
|                                                SCAPTION   => 'Общий остаток к оплате по договору',
 | ||
|                                                SDATA_TYPE => PKG_P8PANELS_VISUAL.SDATA_TYPE_NUMB,
 | ||
|                                                BVISIBLE   => false);
 | ||
|     PKG_P8PANELS_VISUAL.TDATA_GRID_ADD_COL_DEF(RDATA_GRID => RDG,
 | ||
|                                                SNAME      => 'NCOEXEC_IN',
 | ||
|                                                SCAPTION   => 'Получено актов/накладных',
 | ||
|                                                SDATA_TYPE => PKG_P8PANELS_VISUAL.SDATA_TYPE_NUMB,
 | ||
|                                                BVISIBLE   => false);
 | ||
|     PKG_P8PANELS_VISUAL.TDATA_GRID_ADD_COL_DEF(RDATA_GRID => RDG,
 | ||
|                                                SNAME      => 'NCOEXEC_REST',
 | ||
|                                                SCAPTION   => 'Остаток к актированию/поставке',
 | ||
|                                                SDATA_TYPE => PKG_P8PANELS_VISUAL.SDATA_TYPE_NUMB,
 | ||
|                                                BVISIBLE   => false);
 | ||
|     PKG_P8PANELS_VISUAL.TDATA_GRID_ADD_COL_DEF(RDATA_GRID => RDG,
 | ||
|                                                SNAME      => 'NCTRL_COEXEC',
 | ||
|                                                SCAPTION   => 'Соисполнение',
 | ||
|                                                SDATA_TYPE => PKG_P8PANELS_VISUAL.SDATA_TYPE_NUMB,
 | ||
|                                                SCOND_FROM => 'EDCTRL_COEXEC',
 | ||
|                                                BORDER     => false,
 | ||
|                                                BFILTER    => true,
 | ||
|                                                RCOL_VALS  => RCOL_VALS,
 | ||
|                                                SHINT      => '<b>Соисполнение</b> - контроль исполнения обязательств по договору с соисполнителем.<br>' ||
 | ||
|                                                              '<b style="color:red">Требует внимания</b> - до окончания этапа проекта, в рамках которого действует соисполнение, осталось менее ' || TO_CHAR(NDAYS_LEFT_LIMIT) ||
 | ||
|                                                              ' дней, при этом зафиксирован положительный остаток к поставке/актированию по договору.<br>' ||
 | ||
|                                                              '<b style="color:green">В норме</b> - нет описанных выше отклонений.<br>' ||
 | ||
|                                                              '<b style="color:gray">Пусто</b> - в Системе не хватает данных для рассчёта. Убедитесь, что для связанного этапа проекта задана плановая дата окончания, ' ||
 | ||
|                                                              'а по договору с соисполнителем аккуратно ведётся учёт первичных документов оперативного учёта (приходных накладных).');
 | ||
|     /* Обходим данные */
 | ||
|     begin
 | ||
|       /* Собираем запрос */
 | ||
|       CSQL := 'select *
 | ||
|             from (select D.*,
 | ||
|                          ROWNUM NROW
 | ||
|                     from (select PSPF.RN NRN,
 | ||
|                                  trim(CN.DOC_PREF) SDOC_PREF,
 | ||
|                                  ''Contracts'' SLNK_UNIT_SDOC_PREF,
 | ||
|                                  CN.RN NLNK_DOCUMENT_SDOC_PREF,
 | ||
|                                  trim(CN.DOC_NUMB) SDOC_NUMB,
 | ||
|                                  ''Contracts'' SLNK_UNIT_SDOC_NUMB,
 | ||
|                                  CN.RN NLNK_DOCUMENT_SDOC_NUMB,
 | ||
|                                  CN.DOC_DATE DDOC_DATE,
 | ||
|                                  CN.EXT_NUMBER SEXT_NUMBER,
 | ||
|                                  AG.AGNNAME SAGENT,
 | ||
|                                  AG.AGNIDNUMB SAGENT_INN,
 | ||
|                                  AG.REASON_CODE SAGENT_KPP,
 | ||
|                                  GC.CODE SGOVCNTRID,
 | ||
|                                  trim(ST.NUMB) SCSTAGE,
 | ||
|                                  ST.DESCRIPTION SCSTAGE_DESCRIPTION,
 | ||
|                                  ST.BEGIN_DATE DCSTAGE_BEGIN_DATE,
 | ||
|                                  ST.END_DATE DCSTAGE_END_DATE,
 | ||
|                                  PSPF.COST_PLAN NSUMM,
 | ||
|                                  CUR.INTCODE SCURR,
 | ||
|                                  ART.CODE SCOST_ART
 | ||
|                             from PROJECTSTAGEPF PSPF,
 | ||
|                                  STAGES         ST,
 | ||
|                                  CONTRACTS      CN,
 | ||
|                                  AGNLIST        AG,
 | ||
|                                  CURNAMES       CUR,
 | ||
|                                  FPDARTCL       ART,
 | ||
|                                  GOVCNTRID      GC
 | ||
|                            where PSPF.FACEACC = ST.FACEACC
 | ||
|                              and ST.PRN = CN.RN
 | ||
|                              and PSPF.PERFORMER = AG.RN
 | ||
|                              and CN.CURRENCY = CUR.RN
 | ||
|                              and PSPF.COST_ARTICLE = ART.RN(+)
 | ||
|                              and CN.GOVCNTRID = GC.RN(+)
 | ||
|                              and exists (select null from V_USERPRIV UP where UP.CATALOG = PSPF.CRN)
 | ||
|                              and exists (select null from V_USERPRIV UP where UP.JUR_PERS = PSPF.JUR_PERS and UP.UNITCODE = ''Projects'')
 | ||
|                              and exists (select null from V_USERPRIV UP where UP.CATALOG = ST.CRN)
 | ||
|                              and exists (select null from V_USERPRIV UP where UP.JUR_PERS = ST.JUR_PERS and UP.UNITCODE = ''Contracts'')
 | ||
|                              and PSPF.RN in (select ID from COND_BROKER_IDSMART where IDENT = :NIDENT) %ORDER_BY%) D) F
 | ||
|            where F.NROW between :NROW_FROM and :NROW_TO';
 | ||
|       /* Учтём сортировки */
 | ||
|       PKG_P8PANELS_VISUAL.TORDERS_SET_QUERY(RDATA_GRID => RDG, RORDERS => RO, SPATTERN => '%ORDER_BY%', CSQL => CSQL);
 | ||
|       /* Учтём фильтры */
 | ||
|       PKG_P8PANELS_VISUAL.TFILTERS_SET_QUERY(NIDENT     => NIDENT,
 | ||
|                                              NCOMPANY   => NCOMPANY,
 | ||
|                                              NPARENT    => NSTAGE,
 | ||
|                                              SUNIT      => 'ProjectsStagesPerformers',
 | ||
|                                              SPROCEDURE => 'PKG_P8PANELS_PROJECTS.STAGE_CONTRACTS_COND',
 | ||
|                                              RDATA_GRID => RDG,
 | ||
|                                              RFILTERS   => RF);
 | ||
|       /* Разбираем его */
 | ||
|       ICURSOR := PKG_SQL_DML.OPEN_CURSOR(SWHAT => 'SELECT');
 | ||
|       PKG_SQL_DML.PARSE(ICURSOR => ICURSOR, SQUERY => CSQL);
 | ||
|       /* Делаем подстановку параметров */
 | ||
|       PKG_SQL_DML.BIND_VARIABLE_NUM(ICURSOR => ICURSOR, SNAME => 'NIDENT', NVALUE => NIDENT);
 | ||
|       PKG_SQL_DML.BIND_VARIABLE_NUM(ICURSOR => ICURSOR, SNAME => 'NROW_FROM', NVALUE => NROW_FROM);
 | ||
|       PKG_SQL_DML.BIND_VARIABLE_NUM(ICURSOR => ICURSOR, SNAME => 'NROW_TO', NVALUE => NROW_TO);
 | ||
|       /* Описываем структуру записи курсора */
 | ||
|       PKG_SQL_DML.DEFINE_COLUMN_NUM(ICURSOR => ICURSOR, IPOSITION => 1);
 | ||
|       PKG_SQL_DML.DEFINE_COLUMN_STR(ICURSOR => ICURSOR, IPOSITION => 2);
 | ||
|       PKG_SQL_DML.DEFINE_COLUMN_STR(ICURSOR => ICURSOR, IPOSITION => 3);
 | ||
|       PKG_SQL_DML.DEFINE_COLUMN_NUM(ICURSOR => ICURSOR, IPOSITION => 4);
 | ||
|       PKG_SQL_DML.DEFINE_COLUMN_STR(ICURSOR => ICURSOR, IPOSITION => 5);
 | ||
|       PKG_SQL_DML.DEFINE_COLUMN_STR(ICURSOR => ICURSOR, IPOSITION => 6);
 | ||
|       PKG_SQL_DML.DEFINE_COLUMN_NUM(ICURSOR => ICURSOR, IPOSITION => 7);
 | ||
|       PKG_SQL_DML.DEFINE_COLUMN_DATE(ICURSOR => ICURSOR, IPOSITION => 8);
 | ||
|       PKG_SQL_DML.DEFINE_COLUMN_STR(ICURSOR => ICURSOR, IPOSITION => 9);
 | ||
|       PKG_SQL_DML.DEFINE_COLUMN_STR(ICURSOR => ICURSOR, IPOSITION => 10);
 | ||
|       PKG_SQL_DML.DEFINE_COLUMN_STR(ICURSOR => ICURSOR, IPOSITION => 11);
 | ||
|       PKG_SQL_DML.DEFINE_COLUMN_STR(ICURSOR => ICURSOR, IPOSITION => 12);
 | ||
|       PKG_SQL_DML.DEFINE_COLUMN_STR(ICURSOR => ICURSOR, IPOSITION => 13);
 | ||
|       PKG_SQL_DML.DEFINE_COLUMN_STR(ICURSOR => ICURSOR, IPOSITION => 14);
 | ||
|       PKG_SQL_DML.DEFINE_COLUMN_STR(ICURSOR => ICURSOR, IPOSITION => 15);
 | ||
|       PKG_SQL_DML.DEFINE_COLUMN_DATE(ICURSOR => ICURSOR, IPOSITION => 16);
 | ||
|       PKG_SQL_DML.DEFINE_COLUMN_DATE(ICURSOR => ICURSOR, IPOSITION => 17);
 | ||
|       PKG_SQL_DML.DEFINE_COLUMN_NUM(ICURSOR => ICURSOR, IPOSITION => 18);
 | ||
|       PKG_SQL_DML.DEFINE_COLUMN_STR(ICURSOR => ICURSOR, IPOSITION => 19);
 | ||
|       PKG_SQL_DML.DEFINE_COLUMN_STR(ICURSOR => ICURSOR, IPOSITION => 20);
 | ||
|       /* Делаем выборку */
 | ||
|       if (PKG_SQL_DML.EXECUTE(ICURSOR => ICURSOR) = 0) then
 | ||
|         null;
 | ||
|       end if;
 | ||
|       /* Обходим выбранные записи */
 | ||
|       while (PKG_SQL_DML.FETCH_ROWS(ICURSOR => ICURSOR) > 0)
 | ||
|       loop
 | ||
|         /* Добавляем колонки с данными */
 | ||
|         PKG_SQL_DML.COLUMN_VALUE_NUM(ICURSOR => ICURSOR, IPOSITION => 1, NVALUE => NPROJECTSTAGEPF);
 | ||
|         PKG_P8PANELS_VISUAL.TROW_ADD_COL(RROW => RDG_ROW, SNAME => 'NRN', NVALUE => NPROJECTSTAGEPF, BCLEAR => true);
 | ||
|         PKG_P8PANELS_VISUAL.TROW_ADD_CUR_COLS(RROW      => RDG_ROW,
 | ||
|                                               SNAME     => 'SDOC_PREF',
 | ||
|                                               ICURSOR   => ICURSOR,
 | ||
|                                               NPOSITION => 2);
 | ||
|         PKG_P8PANELS_VISUAL.TROW_ADD_CUR_COLS(RROW      => RDG_ROW,
 | ||
|                                               SNAME     => 'SLNK_UNIT_SDOC_PREF',
 | ||
|                                               ICURSOR   => ICURSOR,
 | ||
|                                               NPOSITION => 3);
 | ||
|         PKG_P8PANELS_VISUAL.TROW_ADD_CUR_COLN(RROW      => RDG_ROW,
 | ||
|                                               SNAME     => 'NLNK_DOCUMENT_SDOC_PREF',
 | ||
|                                               ICURSOR   => ICURSOR,
 | ||
|                                               NPOSITION => 4);
 | ||
|         PKG_P8PANELS_VISUAL.TROW_ADD_CUR_COLS(RROW      => RDG_ROW,
 | ||
|                                               SNAME     => 'SDOC_NUMB',
 | ||
|                                               ICURSOR   => ICURSOR,
 | ||
|                                               NPOSITION => 5);
 | ||
|         PKG_P8PANELS_VISUAL.TROW_ADD_CUR_COLS(RROW      => RDG_ROW,
 | ||
|                                               SNAME     => 'SLNK_UNIT_SDOC_NUMB',
 | ||
|                                               ICURSOR   => ICURSOR,
 | ||
|                                               NPOSITION => 6);
 | ||
|         PKG_P8PANELS_VISUAL.TROW_ADD_CUR_COLN(RROW      => RDG_ROW,
 | ||
|                                               SNAME     => 'NLNK_DOCUMENT_SDOC_NUMB',
 | ||
|                                               ICURSOR   => ICURSOR,
 | ||
|                                               NPOSITION => 7);
 | ||
|         PKG_P8PANELS_VISUAL.TROW_ADD_CUR_COLD(RROW      => RDG_ROW,
 | ||
|                                               SNAME     => 'DDOC_DATE',
 | ||
|                                               ICURSOR   => ICURSOR,
 | ||
|                                               NPOSITION => 8);
 | ||
|         PKG_P8PANELS_VISUAL.TROW_ADD_CUR_COLS(RROW      => RDG_ROW,
 | ||
|                                               SNAME     => 'SEXT_NUMBER',
 | ||
|                                               ICURSOR   => ICURSOR,
 | ||
|                                               NPOSITION => 9);
 | ||
|         PKG_P8PANELS_VISUAL.TROW_ADD_CUR_COLS(RROW => RDG_ROW, SNAME => 'SAGENT', ICURSOR => ICURSOR, NPOSITION => 10);
 | ||
|         PKG_P8PANELS_VISUAL.TROW_ADD_CUR_COLS(RROW      => RDG_ROW,
 | ||
|                                               SNAME     => 'SAGENT_INN',
 | ||
|                                               ICURSOR   => ICURSOR,
 | ||
|                                               NPOSITION => 11);
 | ||
|         PKG_P8PANELS_VISUAL.TROW_ADD_CUR_COLS(RROW      => RDG_ROW,
 | ||
|                                               SNAME     => 'SAGENT_KPP',
 | ||
|                                               ICURSOR   => ICURSOR,
 | ||
|                                               NPOSITION => 12);
 | ||
|         PKG_P8PANELS_VISUAL.TROW_ADD_CUR_COLS(RROW      => RDG_ROW,
 | ||
|                                               SNAME     => 'SGOVCNTRID',
 | ||
|                                               ICURSOR   => ICURSOR,
 | ||
|                                               NPOSITION => 13);
 | ||
|         PKG_P8PANELS_VISUAL.TROW_ADD_CUR_COLS(RROW => RDG_ROW, SNAME => 'SCSTAGE', ICURSOR => ICURSOR, NPOSITION => 14);
 | ||
|         PKG_P8PANELS_VISUAL.TROW_ADD_CUR_COLS(RROW      => RDG_ROW,
 | ||
|                                               SNAME     => 'SCSTAGE_DESCRIPTION',
 | ||
|                                               ICURSOR   => ICURSOR,
 | ||
|                                               NPOSITION => 15);
 | ||
|         PKG_P8PANELS_VISUAL.TROW_ADD_CUR_COLD(RROW      => RDG_ROW,
 | ||
|                                               SNAME     => 'DCSTAGE_BEGIN_DATE',
 | ||
|                                               ICURSOR   => ICURSOR,
 | ||
|                                               NPOSITION => 16);
 | ||
|         PKG_P8PANELS_VISUAL.TROW_ADD_CUR_COLD(RROW      => RDG_ROW,
 | ||
|                                               SNAME     => 'DCSTAGE_END_DATE',
 | ||
|                                               ICURSOR   => ICURSOR,
 | ||
|                                               NPOSITION => 17);
 | ||
|         PKG_P8PANELS_VISUAL.TROW_ADD_CUR_COLN(RROW => RDG_ROW, SNAME => 'NSUMM', ICURSOR => ICURSOR, NPOSITION => 18);
 | ||
|         PKG_P8PANELS_VISUAL.TROW_ADD_CUR_COLS(RROW => RDG_ROW, SNAME => 'SCURR', ICURSOR => ICURSOR, NPOSITION => 19);
 | ||
|         PKG_P8PANELS_VISUAL.TROW_ADD_CUR_COLS(RROW      => RDG_ROW,
 | ||
|                                               SNAME     => 'SCOST_ART',
 | ||
|                                               ICURSOR   => ICURSOR,
 | ||
|                                               NPOSITION => 20);
 | ||
|         STAGE_CONTRACTS_GET(NPROJECTSTAGEPF => NPROJECTSTAGEPF,
 | ||
|                             NINC_FIN        => 1,
 | ||
|                             NINC_COEXEC     => 1,
 | ||
|                             NPAY_IN         => NPAY_IN,
 | ||
|                             NFIN_OUT        => NFIN_OUT,
 | ||
|                             NPAY_IN_REST    => NPAY_IN_REST,
 | ||
|                             NFIN_REST       => NFIN_REST,
 | ||
|                             NCTRL_FIN       => NCTRL_FIN,
 | ||
|                             NCOEXEC_IN      => NCOEXEC_IN,
 | ||
|                             NCOEXEC_REST    => NCOEXEC_REST,
 | ||
|                             NCTRL_COEXEC    => NCTRL_COEXEC);
 | ||
|         PKG_P8PANELS_VISUAL.TROW_ADD_COL(RROW => RDG_ROW, SNAME => 'NPAY_IN', NVALUE => NPAY_IN);
 | ||
|         PKG_P8PANELS_VISUAL.TROW_ADD_COL(RROW => RDG_ROW, SNAME => 'NFIN_OUT', NVALUE => NFIN_OUT);
 | ||
|         PKG_P8PANELS_VISUAL.TROW_ADD_COL(RROW => RDG_ROW, SNAME => 'NPAY_IN_REST', NVALUE => NPAY_IN_REST);
 | ||
|         PKG_P8PANELS_VISUAL.TROW_ADD_COL(RROW => RDG_ROW, SNAME => 'NCTRL_FIN', NVALUE => NCTRL_FIN);
 | ||
|         PKG_P8PANELS_VISUAL.TROW_ADD_COL(RROW => RDG_ROW, SNAME => 'NFIN_REST', NVALUE => NFIN_REST);
 | ||
|         PKG_P8PANELS_VISUAL.TROW_ADD_COL(RROW => RDG_ROW, SNAME => 'NCOEXEC_IN', NVALUE => NCOEXEC_IN);
 | ||
|         PKG_P8PANELS_VISUAL.TROW_ADD_COL(RROW => RDG_ROW, SNAME => 'NCOEXEC_REST', NVALUE => NCOEXEC_REST);
 | ||
|         PKG_P8PANELS_VISUAL.TROW_ADD_COL(RROW => RDG_ROW, SNAME => 'NCTRL_COEXEC', NVALUE => NCTRL_COEXEC);
 | ||
|         /* Добавляем строку в таблицу */
 | ||
|         PKG_P8PANELS_VISUAL.TDATA_GRID_ADD_ROW(RDATA_GRID => RDG, RROW => RDG_ROW);
 | ||
|       end loop;
 | ||
|       /* Освобождаем курсор */
 | ||
|       PKG_SQL_DML.CLOSE_CURSOR(ICURSOR => ICURSOR);
 | ||
|     exception
 | ||
|       when others then
 | ||
|         PKG_SQL_DML.CLOSE_CURSOR(ICURSOR => ICURSOR);
 | ||
|         raise;
 | ||
|     end;
 | ||
|     /* Сериализуем описание */
 | ||
|     COUT := PKG_P8PANELS_VISUAL.TDATA_GRID_TO_XML(RDATA_GRID => RDG, NINCLUDE_DEF => NINCLUDE_DEF);
 | ||
|   end STAGE_CONTRACTS_LIST;
 | ||
|   
 | ||
|   /* Считывание записи работы проекта */
 | ||
|   function JOBS_GET
 | ||
|   (
 | ||
|     NRN                     in number           -- Рег. номер работы проекта
 | ||
|   ) return                  PROJECTJOB%rowtype  -- Запись работы проекта
 | ||
|   is
 | ||
|     RRES                    PROJECTJOB%rowtype; -- Буфер для результата
 | ||
|   begin
 | ||
|     select PS.* into RRES from PROJECTJOB PS where PS.RN = NRN;
 | ||
|     return RRES;
 | ||
|   exception
 | ||
|     when NO_DATA_FOUND then
 | ||
|       PKG_MSG.RECORD_NOT_FOUND(NFLAG_SMART => 0, NDOCUMENT => NRN, SUNIT_TABLE => 'PROJECTJOB');
 | ||
|   end JOBS_GET;
 | ||
|   
 | ||
|   /* Получение даты начала периода балансировки */
 | ||
|   function JB_GET_BEG
 | ||
|   (
 | ||
|     NIDENT                  in number       -- Идентификатор процесса
 | ||
|   ) return                  date            -- Дата начала периода балансировки
 | ||
|   is
 | ||
|     DRES                    PKG_STD.TLDATE; -- Буфер для результата
 | ||
|   begin
 | ||
|     select min(D.DMIN_BEG_PLAN)
 | ||
|       into DRES
 | ||
|       from (select min(P.BEGPLAN) DMIN_BEG_PLAN
 | ||
|               from PROJECT P
 | ||
|              where P.RN in (select T.PROJECT from P8PNL_JB_PRJCTS T where T.IDENT = NIDENT)
 | ||
|             union all
 | ||
|             select min(PS.BEGPLAN) DMIN_BEG_PLAN
 | ||
|               from PROJECTSTAGE PS
 | ||
|              where PS.PRN in (select T.PROJECT from P8PNL_JB_PRJCTS T where T.IDENT = NIDENT)
 | ||
|             union all
 | ||
|             select min(PJ.BEGPLAN) DMIN_BEG_PLAN
 | ||
|               from PROJECTJOB PJ
 | ||
|              where PJ.PRN in (select T.PROJECT from P8PNL_JB_PRJCTS T where T.IDENT = NIDENT)) D;
 | ||
|     /* Проверим, что хоть что-то нашли */
 | ||
|     if (DRES is null) then
 | ||
|       P_EXCEPTION(0,
 | ||
|                   'Не удалось определить дату начала периода балансировки. Убедитесь, что для проектов, этапов и работ заданы плановые сроки начала.');
 | ||
|     end if;
 | ||
|     /* Вернём результат - первый день минимального месяца */
 | ||
|     return TRUNC(DRES, 'mm');
 | ||
|   end JB_GET_BEG;
 | ||
|   
 | ||
|   /* Получение даты окончания периода балансировки */
 | ||
|   function JB_GET_END
 | ||
|   (
 | ||
|     NIDENT                  in number       -- Идентификатор процесса
 | ||
|   ) return                  date            -- Дата окончания периода балансировки
 | ||
|   is
 | ||
|     DRES                    PKG_STD.TLDATE; -- Буфер для результата
 | ||
|   begin
 | ||
|     select max(D.DMAX_END_PLAN)
 | ||
|       into DRES
 | ||
|       from (select max(P.ENDPLAN) DMAX_END_PLAN
 | ||
|               from PROJECT P
 | ||
|              where P.RN in (select T.PROJECT from P8PNL_JB_PRJCTS T where T.IDENT = NIDENT)
 | ||
|             union all
 | ||
|             select max(PS.ENDPLAN) DMAX_END_PLAN
 | ||
|               from PROJECTSTAGE PS
 | ||
|              where PS.PRN in (select T.PROJECT from P8PNL_JB_PRJCTS T where T.IDENT = NIDENT)
 | ||
|             union all
 | ||
|             select max(PJ.ENDPLAN) DMAX_END_PLAN
 | ||
|               from PROJECTJOB PJ
 | ||
|              where PJ.PRN in (select T.PROJECT from P8PNL_JB_PRJCTS T where T.IDENT = NIDENT)) D;
 | ||
|     /* Проверим, что хоть что-то нашли */
 | ||
|     if (DRES is null) then
 | ||
|       P_EXCEPTION(0,
 | ||
|                   'Не удалось определить дату окончания периода балансировки. Убедитесь, что для проектов, этапов и работ заданы плановые сроки окончания.');
 | ||
|     end if;
 | ||
|     /* Вернём результат - последний день максимального месяца */
 | ||
|     return LAST_DAY(DRES);
 | ||
|   end JB_GET_END;  
 | ||
|   
 | ||
|   /* Считывание записи проекта из буфера балансировки работ */
 | ||
|   function JB_PRJCTS_GET
 | ||
|   (
 | ||
|     NJB_PRJCTS              in number                -- Рег. номер записи списка балансируемых проектов
 | ||
|   ) return                  P8PNL_JB_PRJCTS%rowtype  -- Запись проекта
 | ||
|   is
 | ||
|     RRES                    P8PNL_JB_PRJCTS%rowtype; -- Буфер для результата
 | ||
|   begin
 | ||
|     select P.* into RRES from P8PNL_JB_PRJCTS P where P.RN = NJB_PRJCTS;
 | ||
|     return RRES;
 | ||
|   exception
 | ||
|     when NO_DATA_FOUND then
 | ||
|       PKG_MSG.RECORD_NOT_FOUND(NFLAG_SMART => 0, NDOCUMENT => NJB_PRJCTS, SUNIT_TABLE => 'P8PNL_JB_PRJCTS');
 | ||
|   end JB_PRJCTS_GET;
 | ||
| 
 | ||
|   /* Базовое добавление проекта для балансировки работ */
 | ||
|   procedure JB_PRJCTS_BASE_INSERT
 | ||
|   (
 | ||
|     NIDENT                  in number,  -- Идентификатор процесса
 | ||
|     NPROJECT                in number,  -- Рег. номер проекта
 | ||
|     NJOBS                   in number,  -- Признак наличия плана-графика (0 - нет, 1 - да)
 | ||
|     NEDITABLE               in number,  -- Признак возможности редактирования (0 - нет, 1 - да)
 | ||
|     NCHANGED                in number,  -- Признак наличия изменений, требующих сохранения (0 - нет, 1 - да)  
 | ||
|     NJB_PRJCTS              out number  -- Рег. номер записи списка балансируемых проектов
 | ||
|   )
 | ||
|   is
 | ||
|   begin
 | ||
|     /* Сформируем рег. номер записи */
 | ||
|     NJB_PRJCTS := GEN_ID();
 | ||
|     /* Добавим запись */
 | ||
|     insert into P8PNL_JB_PRJCTS
 | ||
|       (RN, IDENT, PROJECT, JOBS, EDITABLE, CHANGED)
 | ||
|     values
 | ||
|       (NJB_PRJCTS, NIDENT, NPROJECT, NJOBS, NEDITABLE, NCHANGED);
 | ||
|   end JB_PRJCTS_BASE_INSERT;
 | ||
|   
 | ||
|   /* Установка признака наличия изменений проекта, требующих сохранения */
 | ||
|   procedure JB_PRJCTS_SET_CHANGED
 | ||
|   (
 | ||
|     NJB_PRJCTS              in number,  -- Рег. номер записи списка балансируемых проектов
 | ||
|     NCHANGED                in number   -- Признак наличия изменений, требующих сохранения (0 - нет, 1 - да)  
 | ||
|   )
 | ||
|   is
 | ||
|   begin
 | ||
|     /* Установим признак */
 | ||
|     update P8PNL_JB_PRJCTS T set T.CHANGED = NCHANGED where T.RN = NJB_PRJCTS;
 | ||
|   end JB_PRJCTS_SET_CHANGED;
 | ||
|   
 | ||
|   /* Получение списка проектов */
 | ||
|   procedure JB_PRJCTS_LIST
 | ||
|   (
 | ||
|     NIDENT                  in number,  -- Идентификатор процесса
 | ||
|     COUT                    out clob    -- Список проектов
 | ||
|   )
 | ||
|   is
 | ||
|   begin
 | ||
|     /* Начинаем формирование XML */
 | ||
|     PKG_XFAST.PROLOGUE(ITYPE => PKG_XFAST.CONTENT_);
 | ||
|     /* Открываем корень */
 | ||
|     PKG_XFAST.DOWN_NODE(SNAME => 'XDATA');
 | ||
|     /* Обходим буфер балансировки */
 | ||
|     for C in (select T.RN       NRN,
 | ||
|                      T.PROJECT  NPROJECT,
 | ||
|                      P.NAME_USL SNAME,
 | ||
|                      T.JOBS     NJOBS,
 | ||
|                      T.EDITABLE NEDITABLE,
 | ||
|                      T.CHANGED  NCHANGED
 | ||
|                 from P8PNL_JB_PRJCTS T,
 | ||
|                      PROJECT         P
 | ||
|                where T.IDENT = NIDENT
 | ||
|                  and T.PROJECT = P.RN
 | ||
|                  and exists (select null from V_USERPRIV UP where UP.CATALOG = P.CRN)
 | ||
|                  and exists (select null
 | ||
|                         from V_USERPRIV UP
 | ||
|                        where UP.JUR_PERS = P.JUR_PERS
 | ||
|                          and UP.UNITCODE = 'Projects')
 | ||
|                order by T.RN)
 | ||
|     loop
 | ||
|       /* Открываем проект */
 | ||
|       PKG_XFAST.DOWN_NODE(SNAME => 'XPROJECTS');
 | ||
|       /* Описываем проект */
 | ||
|       PKG_XFAST.ATTR(SNAME => 'NRN', NVALUE => C.NRN);
 | ||
|       PKG_XFAST.ATTR(SNAME => 'NPROJECT', NVALUE => C.NPROJECT);
 | ||
|       PKG_XFAST.ATTR(SNAME => 'SNAME', SVALUE => C.SNAME);
 | ||
|       PKG_XFAST.ATTR(SNAME => 'NJOBS', NVALUE => C.NJOBS);
 | ||
|       PKG_XFAST.ATTR(SNAME => 'NEDITABLE', NVALUE => C.NEDITABLE);
 | ||
|       PKG_XFAST.ATTR(SNAME => 'NCHANGED', NVALUE => C.NCHANGED);
 | ||
|       /* Закрываем проект */
 | ||
|       PKG_XFAST.UP();
 | ||
|     end loop;
 | ||
|     /* Закрываем корень */
 | ||
|     PKG_XFAST.UP();
 | ||
|     /* Сериализуем */
 | ||
|     COUT := PKG_XFAST.SERIALIZE_TO_CLOB();
 | ||
|     /* Завершаем формирование XML */
 | ||
|     PKG_XFAST.EPILOGUE();
 | ||
|   exception
 | ||
|     when others then
 | ||
|       /* Завершаем формирование XML */
 | ||
|       PKG_XFAST.EPILOGUE();
 | ||
|       /* Вернем ошибку */
 | ||
|       PKG_STATE.DIAGNOSTICS_STACKED();
 | ||
|       P_EXCEPTION(0, PKG_STATE.SQL_ERRM());
 | ||
|   end JB_PRJCTS_LIST;
 | ||
|   
 | ||
|   /* Считывание записи работы/этапа из буфера балансировки работ */
 | ||
|   function JB_JOBS_GET
 | ||
|   (
 | ||
|     NJB_JOBS                in number              -- Рег. номер записи работы/этапа в буфере балансировки работ
 | ||
|   ) return                  P8PNL_JB_JOBS%rowtype  -- Найденная запись
 | ||
|   is
 | ||
|     RRES                    P8PNL_JB_JOBS%rowtype; -- Буфер для результата
 | ||
|   begin
 | ||
|     select P.* into RRES from P8PNL_JB_JOBS P where P.RN = NJB_JOBS;
 | ||
|     return RRES;
 | ||
|   exception
 | ||
|     when NO_DATA_FOUND then
 | ||
|       PKG_MSG.RECORD_NOT_FOUND(NFLAG_SMART => 0, NDOCUMENT => NJB_JOBS, SUNIT_TABLE => 'P8PNL_JB_JOBS');
 | ||
|   end JB_JOBS_GET;
 | ||
|   
 | ||
|   /* Поиск записи работы/этапа в списке балансировки по этапу/работе проекта */
 | ||
|   function JB_JOBS_GET_BY_SOURCE
 | ||
|   (
 | ||
|     NIDENT                  in number,             -- Идентификатор процесса
 | ||
|     NPRN                    in number,             -- Рег. номер родителя
 | ||
|     NSOURCE                 in number              -- Рег. номер источника (работы/этапа проекта)
 | ||
|   ) return                  P8PNL_JB_JOBS%rowtype  -- Найденная запись
 | ||
|   is
 | ||
|     RRES                    P8PNL_JB_JOBS%rowtype; -- Буфер для результата
 | ||
|   begin
 | ||
|     select T.*
 | ||
|       into RRES
 | ||
|       from P8PNL_JB_JOBS T
 | ||
|      where T.IDENT = NIDENT
 | ||
|        and T.PRN = NPRN
 | ||
|        and T.SOURCE = NSOURCE;
 | ||
|     return RRES;
 | ||
|   exception
 | ||
|     when NO_DATA_FOUND then
 | ||
|       P_EXCEPTION(0,
 | ||
|                   'Запись работы/этапа (RN-источника: %s) не определена в буфере балансировки.',
 | ||
|                   COALESCE(TO_CHAR(NSOURCE), '<НЕ УКАЗАН>'));
 | ||
|   end JB_JOBS_GET_BY_SOURCE;
 | ||
|   
 | ||
|   /* Базовое добавление работы/этапа для балансировки работ */
 | ||
|   procedure JB_JOBS_BASE_INSERT
 | ||
|   (
 | ||
|     NIDENT                  in number,   -- Идентификатор процесса
 | ||
|     NPRN                    in number,   -- Рег. номер родителя
 | ||
|     NHRN                    in number,   -- Рег. номер родительской записи в иерархии работ/этапов
 | ||
|     NSOURCE                 in number,   -- Рег. номер источника (работы/этапа проекта)
 | ||
|     SNUMB                   in varchar2, -- Номер
 | ||
|     SNAME                   in varchar2, -- Наименование
 | ||
|     DDATE_FROM              in date,     -- Начало
 | ||
|     DDATE_TO                in date,     -- Окончание
 | ||
|     NDURATION               in number,   -- Длительность
 | ||
|     SEXECUTOR               in varchar2, -- Исполнитель
 | ||
|     NSTAGE                  in number,   -- Признак этапа (0 - нет, 1 - да)
 | ||
|     NEDITABLE               in number,   -- Признак возможности редактирования (0 - нет, 1 - да)
 | ||
|     NJB_JOBS                out number   -- Рег. номер записи балансируемой работы/этапа
 | ||
|   )
 | ||
|   is
 | ||
|   begin
 | ||
|     /* Сформируем рег. номер записи */
 | ||
|     NJB_JOBS := GEN_ID();
 | ||
|     /* Добавим запись */
 | ||
|     insert into P8PNL_JB_JOBS
 | ||
|       (RN, IDENT, PRN, HRN, source, NUMB, name, DATE_FROM, DATE_TO, DURATION, EXECUTOR, STAGE, EDITABLE)
 | ||
|     values
 | ||
|       (NJB_JOBS, NIDENT, NPRN, NHRN, NSOURCE, SNUMB, SNAME, DDATE_FROM, DDATE_TO, NDURATION, SEXECUTOR, NSTAGE, NEDITABLE);
 | ||
|   end JB_JOBS_BASE_INSERT;
 | ||
|   
 | ||
|   /* Изменение сроков работы в буфере балансировки */
 | ||
|   procedure JB_JOBS_MODIFY_PERIOD
 | ||
|   (
 | ||
|     NJB_JOBS                in number,               -- Рег. номер записи балансируемой работы/этапа
 | ||
|     DDATE_FROM              in date,                 -- Новая дата начала
 | ||
|     DDATE_TO                in date,                 -- Новая дата окончания
 | ||
|     DBEGIN                  in date,                 -- Дата начала периода мониторинга загрузки ресурсов
 | ||
|     NRESOURCE_STATUS        out number               -- Состояние ресурсов (0 - без отклонений, 1 - есть отклонения)
 | ||
|   )
 | ||
|   is
 | ||
|     RJB_J                   P8PNL_JB_JOBS%rowtype;   -- Запись работы в буфере балансировки
 | ||
|     RJB_P                   P8PNL_JB_PRJCTS%rowtype; -- Запись родительского проекта в буфере балансировки
 | ||
|   begin
 | ||
|     /* Считаем работу из буфера */
 | ||
|     RJB_J := JB_JOBS_GET(NJB_JOBS => NJB_JOBS);
 | ||
|     /* Считаем проект из буфера */
 | ||
|     RJB_P := JB_PRJCTS_GET(NJB_PRJCTS => RJB_J.PRN);
 | ||
|     /* Изменим работу */
 | ||
|     update P8PNL_JB_JOBS T
 | ||
|        set T.DATE_FROM = DDATE_FROM,
 | ||
|            T.DATE_TO   = DDATE_TO
 | ||
|      where T.RN = RJB_J.RN;
 | ||
|     /* Выставим признак изменений в проекте */
 | ||
|     JB_PRJCTS_SET_CHANGED(NJB_PRJCTS => RJB_P.RN, NCHANGED => 1);
 | ||
|     /* Выполним пересчёт монитора */
 | ||
|     JB_PERIODS_RECALC(NIDENT => RJB_P.IDENT, DBEGIN => DBEGIN, NINITIAL => 0, NRESOURCE_STATUS => NRESOURCE_STATUS);
 | ||
|   end JB_JOBS_MODIFY_PERIOD;
 | ||
|   
 | ||
|   /* Получение списка работ проектов для диаграммы Ганта */
 | ||
|   procedure JB_JOBS_LIST
 | ||
|   (
 | ||
|     NIDENT                  in number,                                -- Идентификатор процесса
 | ||
|     NPRN                    in number,                                -- Рег. номер родителя
 | ||
|     NINCLUDE_DEF            in number,                                -- Признак включения описания диаграммы в ответ
 | ||
|     COUT                    out clob                                  -- Список проектов
 | ||
|   )
 | ||
|   is
 | ||
|     /* Константы */
 | ||
|     SBG_COLOR_DANGER        constant PKG_STD.TSTRING := '#ff4d4d';    -- Цвет заливки проблемных задач
 | ||
|     SBG_COLOR_WARN          constant PKG_STD.TSTRING := 'orange';     -- Цвет заливки задач с предупреждениями
 | ||
|     SBG_COLOR_OK            constant PKG_STD.TSTRING := 'lightgreen'; -- Цвет заливки беспроблемных задач
 | ||
|     SBG_COLOR_DISABLED      constant PKG_STD.TSTRING := 'darkgrey';   -- Цвет заливки невыполняемых задач
 | ||
|     SBG_COLOR_STAGE         constant PKG_STD.TSTRING := 'cadetblue';  -- Цвет заливки этапов
 | ||
|     STEXT_COLOR_DANGER      constant PKG_STD.TSTRING := 'blue';       -- Цвет текста задач с предупреждениями
 | ||
| 
 | ||
|     /* Переменные */
 | ||
|     RJB_PRJ                 P8PNL_JB_PRJCTS%rowtype;                  -- Родительская запись буфера балансировки
 | ||
|     RPRJ                    PROJECT%rowtype;                          -- Запись проекта
 | ||
|     RSTG                    PROJECTSTAGE%rowtype;                     -- Запись этапа
 | ||
|     RJOB                    PROJECTJOB%rowtype;                       -- Запись работы
 | ||
|     RG                      PKG_P8PANELS_VISUAL.TGANTT;               -- Описание диаграммы Ганта
 | ||
|     RGT                     PKG_P8PANELS_VISUAL.TGANTT_TASK;          -- Описание задачи для диаграммы    
 | ||
|     STITLE                  PKG_STD.TSTRING;                          -- Общий заголовок
 | ||
|     BREAD_ONLY              boolean := false;                         -- Флаг доступности проекта только для чтения
 | ||
|     BTASK_READ_ONLY         boolean;                                  -- Флаг доступности задачи только для чтения
 | ||
|     STASK_BG_COLOR          PKG_STD.TSTRING;                          -- Цвет фона задачи
 | ||
|     STASK_TEXT_COLOR        PKG_STD.TSTRING;                          -- Цвет текста задачи
 | ||
|     STASK_CAPTION           PKG_STD.TSTRING;                          -- Заголовок задачи    
 | ||
|     NTASK_STATE             PKG_STD.TNUMBER;                          -- Состояние задачи
 | ||
|     NTASK_PROGRESS          PKG_STD.TNUMBER;                          -- Прогресс выполнения задачи    
 | ||
|     STASK_RESP              PKG_STD.TSTRING;                          -- Ответственный за исполнение задачи
 | ||
|   begin
 | ||
|     /* Читаем родительскую запись буфера балансировки */
 | ||
|     RJB_PRJ := JB_PRJCTS_GET(NJB_PRJCTS => NPRN);
 | ||
|     /* Читаем запись проекта */
 | ||
|     RPRJ := GET(NRN => RJB_PRJ.PROJECT);
 | ||
|     /* Определимся с возможностью изменения данных проекта */
 | ||
|     if (RJB_PRJ.EDITABLE = 0) then
 | ||
|       BREAD_ONLY := true;
 | ||
|     end if;
 | ||
|     /* Сформируем общий заголовок */
 | ||
|     STITLE := RPRJ.NAME_USL || ' - ' || RPRJ.NAME;
 | ||
|     if ((RPRJ.EXT_CUST is not null) or ((RPRJ.BEGPLAN is not null) and (RPRJ.ENDPLAN is not null))) then
 | ||
|       STITLE := STITLE || ' (';
 | ||
|       if (RPRJ.EXT_CUST is not null) then
 | ||
|         STITLE := STITLE || 'заказчик: "' ||
 | ||
|                   COALESCE(GET_AGNLIST_AGNABBR_ID(NFLAG_SMART => 1, NRN => RPRJ.EXT_CUST), '<НЕ ОПРЕДЕЛЁН>') || '", ';
 | ||
|       end if;
 | ||
|       if ((RPRJ.BEGPLAN is not null) and (RPRJ.ENDPLAN is not null)) then
 | ||
|         STITLE := STITLE || 'с ' || TO_CHAR(RPRJ.BEGPLAN, 'dd.mm.yyyy') || ' по ' ||
 | ||
|                   TO_CHAR(RPRJ.ENDPLAN, 'dd.mm.yyyy');
 | ||
|       end if;
 | ||
|       STITLE := STITLE || ')';
 | ||
|     end if;
 | ||
|     /* Инициализируем диаграмму Ганта */
 | ||
|     RG := PKG_P8PANELS_VISUAL.TGANTT_MAKE(STITLE     => STITLE,
 | ||
|                                           NZOOM      => PKG_P8PANELS_VISUAL.NGANTT_ZOOM_MONTH,
 | ||
|                                           BREAD_ONLY => BREAD_ONLY);
 | ||
|     /* Добавим динамические атрибуты к задачам */
 | ||
|     PKG_P8PANELS_VISUAL.TGANTT_ADD_TASK_ATTR(RGANTT => RG, SNAME => 'type', SCAPTION => 'Тип');
 | ||
|     PKG_P8PANELS_VISUAL.TGANTT_ADD_TASK_ATTR(RGANTT => RG, SNAME => 'state', SCAPTION => 'Состояние');
 | ||
|     PKG_P8PANELS_VISUAL.TGANTT_ADD_TASK_ATTR(RGANTT => RG, SNAME => 'resp', SCAPTION => 'Ответственный');
 | ||
|     /* Добавим описание цветов задач */
 | ||
|     PKG_P8PANELS_VISUAL.TGANTT_ADD_TASK_COLOR(RGANTT      => RG,
 | ||
|                                               SBG_COLOR   => SBG_COLOR_DANGER,
 | ||
|                                               STEXT_COLOR => STEXT_COLOR_DANGER,
 | ||
|                                               SDESC       => 'Для задач в состоянии "Не начата" - срыв срока начала, есть угроза срыва сроков окончания задачи. ' ||
 | ||
|                                                              'Для задач в состоянии "Выполняется", "Остановлена" - срыв срока окончания, есть угроза срыва срока окончания этапа/проекта.');
 | ||
|     PKG_P8PANELS_VISUAL.TGANTT_ADD_TASK_COLOR(RGANTT    => RG,
 | ||
|                                               SBG_COLOR => SBG_COLOR_WARN,
 | ||
|                                               SDESC     => 'Для задач в состоянии "Не начата" - приближается срок начала, важно обеспечить своевременное выполнение работ. ' ||
 | ||
|                                                            'Для задач в состоянии "Выполняется", "Остановлена" - приближается срок окончания, важно обеспечить своевременное завершение работ.');
 | ||
|     PKG_P8PANELS_VISUAL.TGANTT_ADD_TASK_COLOR(RGANTT    => RG,
 | ||
|                                               SBG_COLOR => SBG_COLOR_OK,
 | ||
|                                               SDESC     => 'Сроки исполнения задачи не вызывают опасений.');
 | ||
|     PKG_P8PANELS_VISUAL.TGANTT_ADD_TASK_COLOR(RGANTT    => RG,
 | ||
|                                               SBG_COLOR => SBG_COLOR_DISABLED,
 | ||
|                                               SDESC     => 'Задача не выполняется (она в состоянии "Выполнена" или "Отменена").');
 | ||
|     PKG_P8PANELS_VISUAL.TGANTT_ADD_TASK_COLOR(RGANTT    => RG,
 | ||
|                                               SBG_COLOR => SBG_COLOR_STAGE,
 | ||
|                                               SDESC     => 'Этим цветом выделены этапы.');
 | ||
|     /* Обходим работы */
 | ||
|     for C in (select JB.*
 | ||
|                 from P8PNL_JB_JOBS   JB,
 | ||
|                      P8PNL_JB_PRJCTS PB,
 | ||
|                      PROJECT         P
 | ||
|                where JB.IDENT = NIDENT
 | ||
|                  and JB.PRN = NPRN
 | ||
|                  and JB.PRN = PB.RN
 | ||
|                  and PB.PROJECT = P.RN
 | ||
|                  and exists (select null from V_USERPRIV UP where UP.CATALOG = P.CRN)
 | ||
|                  and exists (select null
 | ||
|                         from V_USERPRIV UP
 | ||
|                        where UP.JUR_PERS = P.JUR_PERS
 | ||
|                          and UP.UNITCODE = 'Projects')
 | ||
|                order by JB.RN)
 | ||
|     loop
 | ||
|       /* Считаем источник - этап или работу проекта, здесь же найдём ответственного */
 | ||
|       STASK_RESP := null;
 | ||
|       if (C.STAGE = 1) then
 | ||
|         RSTG := STAGES_GET(NRN => C.SOURCE);
 | ||
|         if (RSTG.RESPONSIBLE is not null) then
 | ||
|           STASK_RESP := GET_AGNLIST_AGNABBR_ID(NFLAG_SMART => 1, NRN => RSTG.RESPONSIBLE);
 | ||
|         elsif (RSTG.SUBDIV_RESP is not null) then
 | ||
|           STASK_RESP := UTL_INS_DEPARTMENT_GET_NAME(NRN => RSTG.SUBDIV_RESP);
 | ||
|         end if;
 | ||
|       else
 | ||
|         RJOB := JOBS_GET(NRN => C.SOURCE);
 | ||
|         if (RJOB.PERFORM is not null) then
 | ||
|           STASK_RESP := GET_AGNLIST_AGNABBR_ID(NFLAG_SMART => 1, NRN => RJOB.PERFORM);
 | ||
|         elsif (RJOB.SUBDIV is not null) then
 | ||
|           STASK_RESP := UTL_INS_DEPARTMENT_GET_NAME(NRN => RJOB.SUBDIV);
 | ||
|         end if;
 | ||
|       end if;
 | ||
|       /* Определимся с состоянием */
 | ||
|       if (C.STAGE = 1) then
 | ||
|         NTASK_STATE := RSTG.STATE;
 | ||
|       else
 | ||
|         NTASK_STATE := RJOB.STATE;
 | ||
|       end if;
 | ||
|       /* Определимся с форматированием */
 | ||
|       if (C.STAGE = 1) then
 | ||
|         /* Этапы всегда одинаково красим */        
 | ||
|         STASK_BG_COLOR  := SBG_COLOR_STAGE;
 | ||
|       else
 | ||
|         /* Сбросим цвета от предыдущей работы (на всякий случай) */
 | ||
|         STASK_BG_COLOR   := null;
 | ||
|         STASK_TEXT_COLOR := null;
 | ||
|         /* Работы - от статуса ("Не начата") */
 | ||
|         if (RJOB.STATE = 0) then
 | ||
|           if (C.DATE_FROM <= sysdate) then
 | ||
|             STASK_BG_COLOR   := SBG_COLOR_DANGER;
 | ||
|             STASK_TEXT_COLOR := STEXT_COLOR_DANGER;
 | ||
|           elsif (C.DATE_FROM <= sysdate + NDAYS_LEFT_LIMIT) then
 | ||
|             STASK_BG_COLOR := SBG_COLOR_WARN;
 | ||
|           else
 | ||
|             STASK_BG_COLOR := SBG_COLOR_OK;
 | ||
|           end if;
 | ||
|         end if;
 | ||
|         /* Работы - от статуса ("Выполняется", "Остановлена") */
 | ||
|         if (RJOB.STATE in (1, 3)) then
 | ||
|           if (C.DATE_TO <= sysdate) then
 | ||
|             STASK_BG_COLOR   := SBG_COLOR_DANGER;
 | ||
|             STASK_TEXT_COLOR := STEXT_COLOR_DANGER;
 | ||
|           elsif (C.DATE_TO <= sysdate + NDAYS_LEFT_LIMIT) then
 | ||
|             STASK_BG_COLOR := SBG_COLOR_WARN;
 | ||
|           else
 | ||
|             STASK_BG_COLOR := SBG_COLOR_OK;
 | ||
|           end if;
 | ||
|         end if;
 | ||
|         /* Работы - от статуса ("Выполнена", "Отменена") */
 | ||
|         if (RJOB.STATE in (2, 4)) then
 | ||
|           /* Всегда тёмные */
 | ||
|           STASK_BG_COLOR := SBG_COLOR_DISABLED;
 | ||
|         end if;
 | ||
|       end if;
 | ||
|       /* Определимся с возможностью редактирования */
 | ||
|       BTASK_READ_ONLY := false;
 | ||
|       if (C.EDITABLE = 0) then
 | ||
|         BTASK_READ_ONLY := true;
 | ||
|       end if;
 | ||
|       /* Сформируем заголовок для выдачи в диаграмме */
 | ||
|       STASK_CAPTION := trim(C.NUMB) || ' - ' || C.NAME;
 | ||
|       if (LENGTH(STASK_CAPTION) > NGANTT_TASK_CAPTION_LEN) then
 | ||
|         STASK_CAPTION := SUBSTR(STASK_CAPTION, 1, NGANTT_TASK_CAPTION_LEN) || '...';
 | ||
|       end if;
 | ||
|       /* Определим прогресс (только для работ в статусах "Выполняется" и "Остановлена") */
 | ||
|       if ((C.STAGE = 0) and (RJOB.STATE in (1, 3)) and (RJOB.LAB_PLAN > 0)) then
 | ||
|         NTASK_PROGRESS := RJOB.LAB_FACT / RJOB.LAB_PLAN * 100;
 | ||
|       else
 | ||
|         NTASK_PROGRESS := null;
 | ||
|       end if;
 | ||
|       /* Сформируем работу */
 | ||
|       RGT := PKG_P8PANELS_VISUAL.TGANTT_TASK_MAKE(NRN                 => C.RN,
 | ||
|                                                   SNUMB               => C.NUMB,
 | ||
|                                                   SCAPTION            => STASK_CAPTION,
 | ||
|                                                   SNAME               => C.NAME,
 | ||
|                                                   DSTART              => C.DATE_FROM,
 | ||
|                                                   DEND                => C.DATE_TO,
 | ||
|                                                   NPROGRESS           => NTASK_PROGRESS,
 | ||
|                                                   SBG_COLOR           => STASK_BG_COLOR,
 | ||
|                                                   STEXT_COLOR         => STASK_TEXT_COLOR,
 | ||
|                                                   BREAD_ONLY          => BTASK_READ_ONLY,
 | ||
|                                                   BREAD_ONLY_PROGRESS => true);
 | ||
|       PKG_P8PANELS_VISUAL.TGANTT_TASK_ADD_ATTR_VAL(RGANTT => RG,
 | ||
|                                                    RTASK  => RGT,
 | ||
|                                                    SNAME  => 'type',
 | ||
|                                                    SVALUE => C.STAGE,
 | ||
|                                                    BCLEAR => true);
 | ||
|       PKG_P8PANELS_VISUAL.TGANTT_TASK_ADD_ATTR_VAL(RGANTT => RG, RTASK => RGT, SNAME => 'state', SVALUE => NTASK_STATE);
 | ||
|       PKG_P8PANELS_VISUAL.TGANTT_TASK_ADD_ATTR_VAL(RGANTT => RG, RTASK => RGT, SNAME => 'resp', SVALUE => STASK_RESP);
 | ||
|       /* Определимся с предшествующими работами */
 | ||
|       for CP in (select JP.JB_JOBS
 | ||
|                    from P8PNL_JB_JOBSPREV JP
 | ||
|                   where JP.IDENT = NIDENT
 | ||
|                     and JP.PRN = C.RN)
 | ||
|       loop
 | ||
|         PKG_P8PANELS_VISUAL.TGANTT_TASK_ADD_DEPENDENCY(RTASK => RGT, NDEPENDENCY => CP.JB_JOBS);
 | ||
|       end loop;
 | ||
|       /* Добавляем работу в диаграмму */
 | ||
|       PKG_P8PANELS_VISUAL.TGANTT_ADD_TASK(RGANTT => RG, RTASK => RGT);
 | ||
|     end loop;
 | ||
|     /* Формируем список */
 | ||
|     COUT := PKG_P8PANELS_VISUAL.TGANTT_TO_XML(RGANTT => RG, NINCLUDE_DEF => NINCLUDE_DEF);
 | ||
|   end JB_JOBS_LIST;
 | ||
|   
 | ||
|   /* Базовое добавление предшествующей работы/этапа для балансировки работ */
 | ||
|   procedure JB_JOBSPREV_BASE_INSERT
 | ||
|   (    
 | ||
|     NIDENT                  in number, -- Идентификатор процесса
 | ||
|     NPRN                    in number, -- Рег. номер родителя
 | ||
|     NJB_JOBS                in number, -- Рег. номер предшествующей работы/этапа
 | ||
|     NJB_JOBSPREV            out number -- Рег. номер записи предшествующей балансируемой работы/этапа
 | ||
|   )
 | ||
|   is
 | ||
|   begin
 | ||
|     /* Сформируем рег. номер записи */
 | ||
|     NJB_JOBSPREV := GEN_ID();
 | ||
|     /* Добавим запись */
 | ||
|     insert into P8PNL_JB_JOBSPREV (RN, IDENT, PRN, JB_JOBS) values (NJB_JOBSPREV, NIDENT, NPRN, NJB_JOBS);
 | ||
|   end JB_JOBSPREV_BASE_INSERT;
 | ||
|   
 | ||
|   /* Считывание записи периода из буфера балансировки работ */
 | ||
|   function JB_PERIODS_GET
 | ||
|   (
 | ||
|     NJB_PERIODS             in number                 -- Рег. номер записи периода в буфере балансировки
 | ||
|   ) return                  P8PNL_JB_PERIODS%rowtype  -- Запись периода
 | ||
|   is
 | ||
|     RRES                    P8PNL_JB_PERIODS%rowtype; -- Буфер для результата
 | ||
|   begin
 | ||
|     select P.* into RRES from P8PNL_JB_PERIODS P where P.RN = NJB_PERIODS;
 | ||
|     return RRES;
 | ||
|   exception
 | ||
|     when NO_DATA_FOUND then
 | ||
|       PKG_MSG.RECORD_NOT_FOUND(NFLAG_SMART => 0, NDOCUMENT => NJB_PERIODS, SUNIT_TABLE => 'P8PNL_JB_PERIODS');
 | ||
|   end JB_PERIODS_GET;
 | ||
|   
 | ||
|   /* Получение списка для детализации трудоёмкости по ФОТ периода балансировки */
 | ||
|   procedure JB_PERIODS_LIST_PLAN_FOT
 | ||
|   (
 | ||
|     NJB_PERIODS             in number,                             -- Рег. номер записи периода в буфере балансировки
 | ||
|     NPAGE_NUMBER            in number,                             -- Номер страницы (игнорируется при NPAGE_SIZE=0)
 | ||
|     NPAGE_SIZE              in number,                             -- Количество записей на странице (0 - все)
 | ||
|     CORDERS                 in clob,                               -- Сортировки    
 | ||
|     NINCLUDE_DEF            in number,                             -- Признак включения описания колонок таблицы в ответ
 | ||
|     COUT                    out clob                               -- Сериализованная таблица данных
 | ||
|   )
 | ||
|   is
 | ||
|     NCOMPANY                PKG_STD.TREF := GET_SESSION_COMPANY(); -- Организация сеанса
 | ||
|     RPRD                    P8PNL_JB_PERIODS%rowtype;              -- Запись детализируемого периода
 | ||
|     RO                      PKG_P8PANELS_VISUAL.TORDERS;           -- Сортировки
 | ||
|     RDG                     PKG_P8PANELS_VISUAL.TDATA_GRID;        -- Описание таблицы
 | ||
|     RDG_ROW                 PKG_P8PANELS_VISUAL.TROW;              -- Строка таблицы
 | ||
|     CSQL                    clob;                                  -- Буфер для запроса
 | ||
|     ICURSOR                 integer;                               -- Курсор для исполнения запроса
 | ||
|     NROW_FROM               PKG_STD.TREF;                          -- Номер строки с
 | ||
|     NROW_TO                 PKG_STD.TREF;                          -- Номер строки по    
 | ||
|   begin
 | ||
|     /* Считаем детализируемую запись периода */
 | ||
|     RPRD := JB_PERIODS_GET(NJB_PERIODS => NJB_PERIODS);
 | ||
|     /* Читем сортировки */
 | ||
|     RO := PKG_P8PANELS_VISUAL.TORDERS_FROM_XML(CORDERS => CORDERS);
 | ||
|     /* Преобразуем номер и размер страницы в номер строк с и по */
 | ||
|     PKG_P8PANELS_VISUAL.UTL_ROWS_LIMITS_CALC(NPAGE_NUMBER => NPAGE_NUMBER,
 | ||
|                                              NPAGE_SIZE   => NPAGE_SIZE,
 | ||
|                                              NROW_FROM    => NROW_FROM,
 | ||
|                                              NROW_TO      => NROW_TO);
 | ||
|     /* Инициализируем таблицу данных */
 | ||
|     RDG := PKG_P8PANELS_VISUAL.TDATA_GRID_MAKE();
 | ||
|     /* Добавляем в таблицу описание колонок */
 | ||
|     PKG_P8PANELS_VISUAL.TDATA_GRID_ADD_COL_DEF(RDATA_GRID => RDG,
 | ||
|                                                SNAME      => 'NRN',
 | ||
|                                                SCAPTION   => 'Рег. номер',
 | ||
|                                                SDATA_TYPE => PKG_P8PANELS_VISUAL.SDATA_TYPE_NUMB,
 | ||
|                                                BVISIBLE   => false);
 | ||
|     PKG_P8PANELS_VISUAL.TDATA_GRID_ADD_COL_DEF(RDATA_GRID => RDG,
 | ||
|                                                SNAME      => 'SPERSON',
 | ||
|                                                SCAPTION   => 'Сотрудник',
 | ||
|                                                SDATA_TYPE => PKG_P8PANELS_VISUAL.SDATA_TYPE_STR,
 | ||
|                                                BORDER     => true,
 | ||
|                                                BFILTER    => false);
 | ||
|     PKG_P8PANELS_VISUAL.TDATA_GRID_ADD_COL_DEF(RDATA_GRID => RDG,
 | ||
|                                                SNAME      => 'NLAB_PLAN_FOT',
 | ||
|                                                SCAPTION   => 'Трудоёмкость',
 | ||
|                                                SDATA_TYPE => PKG_P8PANELS_VISUAL.SDATA_TYPE_NUMB,
 | ||
|                                                BORDER     => false,
 | ||
|                                                BFILTER    => false);
 | ||
|     /* Обходим данные */
 | ||
|     begin
 | ||
|       /* Собираем запрос */
 | ||
|       CSQL := 'select *
 | ||
|                  from (select D.*,
 | ||
|                               ROWNUM NROW
 | ||
|                          from (select FM.RN NRN,
 | ||
|                                       PERS.CODE SPERSON,
 | ||
|                                       SH.AVG_HOURS NLAB_PLAN_FOT
 | ||
|                                  from CLNPSPFM   FM,
 | ||
|                                       CLNPERSONS PERS,
 | ||
|                                       CLNPSDEP   PSD,
 | ||
|                                       PRPROF     PROF,
 | ||
|                                       CLNPSPFMHS FMH,
 | ||
|                                       SLSCHEDULE SH
 | ||
|                                 where FM.COMPANY = :NCOMPANY
 | ||
|                                   and FM.PERSRN = PERS.RN
 | ||
|                                   and FM.DEPTRN = :NINS_DEPARTMENT
 | ||
|                                   and FM.PSDEPRN = PSD.RN
 | ||
|                                   and PSD.PRPROF = PROF.RN
 | ||
|                                   and PROF.RN in (select MP.PRPROF from FCMANPOWER MP where MP.RN = :NFCMANPOWER)
 | ||
|                                   and ((FM.BEGENG between :DDATE_FROM and :DDATE_TO) or (FM.ENDENG between :DDATE_FROM and :DDATE_TO) or
 | ||
|                                       ((FM.BEGENG < :DDATE_FROM) and (COALESCE(FM.ENDENG, :DDATE_TO + 1) > :DDATE_TO)))
 | ||
|                                   and FM.RN = FMH.PRN
 | ||
|                                   and ((FMH.DO_ACT_FROM between :DDATE_FROM and :DDATE_TO) or (FMH.DO_ACT_TO between :DDATE_FROM and :DDATE_TO) or
 | ||
|                                       ((FMH.DO_ACT_FROM < :DDATE_FROM) and (COALESCE(FMH.DO_ACT_TO, :DDATE_TO + 1) > :DDATE_TO)))
 | ||
|                                   and FMH.SCHEDULE = SH.RN %ORDER_BY%) D) F
 | ||
|                 where F.NROW between :NROW_FROM and :NROW_TO';
 | ||
|       /* Учтём сортировки */
 | ||
|       PKG_P8PANELS_VISUAL.TORDERS_SET_QUERY(RDATA_GRID => RDG, RORDERS => RO, SPATTERN => '%ORDER_BY%', CSQL => CSQL);
 | ||
|       /* Разбираем его */
 | ||
|       ICURSOR := PKG_SQL_DML.OPEN_CURSOR(SWHAT => 'SELECT');
 | ||
|       PKG_SQL_DML.PARSE(ICURSOR => ICURSOR, SQUERY => CSQL);
 | ||
|       /* Делаем подстановку параметров */
 | ||
|       PKG_SQL_DML.BIND_VARIABLE_NUM(ICURSOR => ICURSOR, SNAME => 'NCOMPANY', NVALUE => NCOMPANY);
 | ||
|       PKG_SQL_DML.BIND_VARIABLE_NUM(ICURSOR => ICURSOR, SNAME => 'NINS_DEPARTMENT', NVALUE => RPRD.INS_DEPARTMENT);
 | ||
|       PKG_SQL_DML.BIND_VARIABLE_NUM(ICURSOR => ICURSOR, SNAME => 'NFCMANPOWER', NVALUE => RPRD.FCMANPOWER);      
 | ||
|       PKG_SQL_DML.BIND_VARIABLE_DATE(ICURSOR => ICURSOR, SNAME => 'DDATE_FROM', DVALUE => RPRD.DATE_FROM);
 | ||
|       PKG_SQL_DML.BIND_VARIABLE_DATE(ICURSOR => ICURSOR, SNAME => 'DDATE_TO', DVALUE => RPRD.DATE_TO);      
 | ||
|       PKG_SQL_DML.BIND_VARIABLE_NUM(ICURSOR => ICURSOR, SNAME => 'NROW_FROM', NVALUE => NROW_FROM);
 | ||
|       PKG_SQL_DML.BIND_VARIABLE_NUM(ICURSOR => ICURSOR, SNAME => 'NROW_TO', NVALUE => NROW_TO);      
 | ||
|       /* Описываем структуру записи курсора */
 | ||
|       PKG_SQL_DML.DEFINE_COLUMN_NUM(ICURSOR => ICURSOR, IPOSITION => 1);
 | ||
|       PKG_SQL_DML.DEFINE_COLUMN_STR(ICURSOR => ICURSOR, IPOSITION => 2);
 | ||
|       PKG_SQL_DML.DEFINE_COLUMN_NUM(ICURSOR => ICURSOR, IPOSITION => 3);
 | ||
|       /* Делаем выборку */
 | ||
|       if (PKG_SQL_DML.EXECUTE(ICURSOR => ICURSOR) = 0) then
 | ||
|         null;
 | ||
|       end if;
 | ||
|       /* Обходим выбранные записи */
 | ||
|       while (PKG_SQL_DML.FETCH_ROWS(ICURSOR => ICURSOR) > 0)
 | ||
|       loop
 | ||
|         /* Добавляем колонки с данными */
 | ||
|         PKG_P8PANELS_VISUAL.TROW_ADD_CUR_COLN(RROW      => RDG_ROW,
 | ||
|                                               SNAME     => 'NRN',
 | ||
|                                               ICURSOR   => ICURSOR,
 | ||
|                                               NPOSITION => 1,
 | ||
|                                               BCLEAR    => true);
 | ||
|         PKG_P8PANELS_VISUAL.TROW_ADD_CUR_COLS(RROW => RDG_ROW, SNAME => 'SPERSON', ICURSOR => ICURSOR, NPOSITION => 2);
 | ||
|         PKG_P8PANELS_VISUAL.TROW_ADD_CUR_COLN(RROW      => RDG_ROW,
 | ||
|                                               SNAME     => 'NLAB_PLAN_FOT',
 | ||
|                                               ICURSOR   => ICURSOR,
 | ||
|                                               NPOSITION => 3);
 | ||
|         /* Добавляем строку в таблицу */
 | ||
|         PKG_P8PANELS_VISUAL.TDATA_GRID_ADD_ROW(RDATA_GRID => RDG, RROW => RDG_ROW);
 | ||
|       end loop;
 | ||
|       /* Освобождаем курсор */
 | ||
|       PKG_SQL_DML.CLOSE_CURSOR(ICURSOR => ICURSOR);
 | ||
|     exception
 | ||
|       when others then
 | ||
|         PKG_SQL_DML.CLOSE_CURSOR(ICURSOR => ICURSOR);
 | ||
|         raise;
 | ||
|     end;
 | ||
|     /* Сериализуем описание */
 | ||
|     COUT := PKG_P8PANELS_VISUAL.TDATA_GRID_TO_XML(RDATA_GRID => RDG, NINCLUDE_DEF => NINCLUDE_DEF);
 | ||
|   end JB_PERIODS_LIST_PLAN_FOT;
 | ||
|   
 | ||
|   /* Получение плановой трудоёмкости по ФОТ для периода балансировки (в часах) */
 | ||
|   function JB_PERIODS_GET_PLAN_FOT
 | ||
|   (
 | ||
|     NCOMPANY                in number,       -- Рег. номер организации
 | ||
|     DDATE_FROM              in date,         -- Начало
 | ||
|     DDATE_TO                in date,         -- Окончание
 | ||
|     NINS_DEPARTMENT         in number,       -- Рег. номер штатного подразделения
 | ||
|     NFCMANPOWER             in number        -- Рег. номер трудового ресурса
 | ||
|   ) return                  number           -- Плановая трудоёмкость по ФОТ (в часах)
 | ||
|   is
 | ||
|     NRES                    PKG_STD.TNUMBER; -- Плановая трудоёмкость по ФОТ
 | ||
|   begin
 | ||
|     /* Обойдем подходящие исполнения и просуммируем среднемесячную численность часов */
 | ||
|     select sum(SH.AVG_HOURS)
 | ||
|       into NRES
 | ||
|       from CLNPSPFM   FM,
 | ||
|            CLNPSDEP   PSD,
 | ||
|            PRPROF     PROF,
 | ||
|            CLNPSPFMHS FMH,
 | ||
|            SLSCHEDULE SH
 | ||
|      where FM.COMPANY = NCOMPANY
 | ||
|        and FM.DEPTRN = NINS_DEPARTMENT
 | ||
|        and FM.PSDEPRN = PSD.RN
 | ||
|        and PSD.PRPROF = PROF.RN
 | ||
|        and PROF.RN in (select MP.PRPROF from FCMANPOWER MP where MP.RN = NFCMANPOWER)
 | ||
|        and ((FM.BEGENG between DDATE_FROM and DDATE_TO) or (FM.ENDENG between DDATE_FROM and DDATE_TO) or
 | ||
|            ((FM.BEGENG < DDATE_FROM) and (COALESCE(FM.ENDENG, DDATE_TO + 1) > DDATE_TO)))
 | ||
|        and FM.RN = FMH.PRN
 | ||
|        and ((FMH.DO_ACT_FROM between DDATE_FROM and DDATE_TO) or (FMH.DO_ACT_TO between DDATE_FROM and DDATE_TO) or
 | ||
|            ((FMH.DO_ACT_FROM < DDATE_FROM) and (COALESCE(FMH.DO_ACT_TO, DDATE_TO + 1) > DDATE_TO)))
 | ||
|        and FMH.SCHEDULE = SH.RN;
 | ||
|     /* Вернём собранный результат */
 | ||
|     return COALESCE(NRES, 0);
 | ||
|   end JB_PERIODS_GET_PLAN_FOT;
 | ||
|   
 | ||
|   /* Получение списка для детализации трудоёмкости периода балансировки по текущему состоянию графика */
 | ||
|   procedure JB_PERIODS_LIST_PLAN_JOBS
 | ||
|   (
 | ||
|     NJB_PERIODS             in number,                             -- Рег. номер записи периода в буфере балансировки
 | ||
|     NPAGE_NUMBER            in number,                             -- Номер страницы (игнорируется при NPAGE_SIZE=0)
 | ||
|     NPAGE_SIZE              in number,                             -- Количество записей на странице (0 - все)
 | ||
|     CORDERS                 in clob,                               -- Сортировки    
 | ||
|     NINCLUDE_DEF            in number,                             -- Признак включения описания колонок таблицы в ответ
 | ||
|     COUT                    out clob                               -- Сериализованная таблица данных
 | ||
|   )
 | ||
|   is
 | ||
|     NCOMPANY                PKG_STD.TREF := GET_SESSION_COMPANY(); -- Организация сеанса
 | ||
|     RPRD                    P8PNL_JB_PERIODS%rowtype;              -- Запись детализируемого периода
 | ||
|     RO                      PKG_P8PANELS_VISUAL.TORDERS;           -- Сортировки
 | ||
|     RDG                     PKG_P8PANELS_VISUAL.TDATA_GRID;        -- Описание таблицы
 | ||
|     RDG_ROW                 PKG_P8PANELS_VISUAL.TROW;              -- Строка таблицы
 | ||
|     CSQL                    clob;                                  -- Буфер для запроса
 | ||
|     ICURSOR                 integer;                               -- Курсор для исполнения запроса
 | ||
|     NROW_FROM               PKG_STD.TREF;                          -- Номер строки с
 | ||
|     NROW_TO                 PKG_STD.TREF;                          -- Номер строки по
 | ||
|     DBEG                    PKG_STD.TLDATE;                        -- Дата начала для расчёта трудоёмкости текущей работы
 | ||
|     DEND                    PKG_STD.TLDATE;                        -- Дата окончания для расчёта трудоёмкости текущей работы
 | ||
|     DJOB_BEG                PKG_STD.TLDATE;                        -- Дата начала текущей работы согласно плану-груфику
 | ||
|     DJOB_END                PKG_STD.TLDATE;                        -- Дата окончания текущей работы согласно плану-груфику
 | ||
|     NJOB_DUR                PKG_STD.TNUMBER;                       -- Длительнось текущей работы согласно плану-груфику
 | ||
|     NMP_LAB                 PKG_STD.TNUMBER;                       -- Трудоёмкость трудового ресурса в текущей работе согласно проекта
 | ||
|     NMP_LAB_ONE             PKG_STD.TNUMBER;                       -- Трудоёмкость (за единицу длительности) трудового ресурса в текущей работе согласно проекта
 | ||
|     NMP_LAB_PLAN            PKG_STD.TNUMBER;                       -- Трудоёмкость трудового ресурса в текущей работе согласно плана-графика
 | ||
|   begin
 | ||
|     /* Считаем детализируемую запись периода */
 | ||
|     RPRD := JB_PERIODS_GET(NJB_PERIODS => NJB_PERIODS);
 | ||
|     /* Читем сортировки */
 | ||
|     RO := PKG_P8PANELS_VISUAL.TORDERS_FROM_XML(CORDERS => CORDERS);
 | ||
|     /* Преобразуем номер и размер страницы в номер строк с и по */
 | ||
|     PKG_P8PANELS_VISUAL.UTL_ROWS_LIMITS_CALC(NPAGE_NUMBER => NPAGE_NUMBER,
 | ||
|                                              NPAGE_SIZE   => NPAGE_SIZE,
 | ||
|                                              NROW_FROM    => NROW_FROM,
 | ||
|                                              NROW_TO      => NROW_TO);
 | ||
|     /* Инициализируем таблицу данных */
 | ||
|     RDG := PKG_P8PANELS_VISUAL.TDATA_GRID_MAKE();
 | ||
|     /* Добавляем в таблицу описание колонок */
 | ||
|     PKG_P8PANELS_VISUAL.TDATA_GRID_ADD_COL_DEF(RDATA_GRID => RDG,
 | ||
|                                                SNAME      => 'NRN',
 | ||
|                                                SCAPTION   => 'Рег. номер',
 | ||
|                                                SDATA_TYPE => PKG_P8PANELS_VISUAL.SDATA_TYPE_NUMB,
 | ||
|                                                BVISIBLE   => false);
 | ||
|     PKG_P8PANELS_VISUAL.TDATA_GRID_ADD_COL_DEF(RDATA_GRID => RDG,
 | ||
|                                                SNAME      => 'NPROJECT',
 | ||
|                                                SCAPTION   => 'Рег. номер проекта',
 | ||
|                                                SDATA_TYPE => PKG_P8PANELS_VISUAL.SDATA_TYPE_NUMB,
 | ||
|                                                BVISIBLE   => false);
 | ||
|     PKG_P8PANELS_VISUAL.TDATA_GRID_ADD_COL_DEF(RDATA_GRID => RDG,
 | ||
|                                                SNAME      => 'NJB_PRJCTS',
 | ||
|                                                SCAPTION   => 'Рег. номер буфера балансировки проекта',
 | ||
|                                                SDATA_TYPE => PKG_P8PANELS_VISUAL.SDATA_TYPE_NUMB,
 | ||
|                                                BVISIBLE   => false);
 | ||
|     PKG_P8PANELS_VISUAL.TDATA_GRID_ADD_COL_DEF(RDATA_GRID => RDG,
 | ||
|                                                SNAME      => 'SPRJ',
 | ||
|                                                SCAPTION   => 'Проект',
 | ||
|                                                SDATA_TYPE => PKG_P8PANELS_VISUAL.SDATA_TYPE_STR,
 | ||
|                                                BORDER     => true,
 | ||
|                                                BFILTER    => false);
 | ||
|     PKG_P8PANELS_VISUAL.TDATA_GRID_ADD_COL_DEF(RDATA_GRID => RDG,
 | ||
|                                                SNAME      => 'SSTG_JOB',
 | ||
|                                                SCAPTION   => 'Этап-работа',
 | ||
|                                                SDATA_TYPE => PKG_P8PANELS_VISUAL.SDATA_TYPE_STR,
 | ||
|                                                BORDER     => true,
 | ||
|                                                BFILTER    => false);
 | ||
|     PKG_P8PANELS_VISUAL.TDATA_GRID_ADD_COL_DEF(RDATA_GRID => RDG,
 | ||
|                                                SNAME      => 'SJOB_NAME',
 | ||
|                                                SCAPTION   => 'Наим. работы',
 | ||
|                                                SDATA_TYPE => PKG_P8PANELS_VISUAL.SDATA_TYPE_STR,
 | ||
|                                                BORDER     => true,
 | ||
|                                                BFILTER    => false);
 | ||
|     PKG_P8PANELS_VISUAL.TDATA_GRID_ADD_COL_DEF(RDATA_GRID => RDG,
 | ||
|                                                SNAME      => 'NJOB_STATE',
 | ||
|                                                SCAPTION   => 'Сост. работы',
 | ||
|                                                SDATA_TYPE => PKG_P8PANELS_VISUAL.SDATA_TYPE_NUMB,
 | ||
|                                                BORDER     => true,
 | ||
|                                                BFILTER    => false);
 | ||
|     PKG_P8PANELS_VISUAL.TDATA_GRID_ADD_COL_DEF(RDATA_GRID => RDG,
 | ||
|                                                SNAME      => 'DJOB_BEG',
 | ||
|                                                SCAPTION   => 'Начало работы',
 | ||
|                                                SDATA_TYPE => PKG_P8PANELS_VISUAL.SDATA_TYPE_DATE,
 | ||
|                                                BORDER     => true,
 | ||
|                                                BFILTER    => false);
 | ||
|     PKG_P8PANELS_VISUAL.TDATA_GRID_ADD_COL_DEF(RDATA_GRID => RDG,
 | ||
|                                                SNAME      => 'DJOB_END',
 | ||
|                                                SCAPTION   => 'Окончание работы',
 | ||
|                                                SDATA_TYPE => PKG_P8PANELS_VISUAL.SDATA_TYPE_DATE,
 | ||
|                                                BORDER     => true,
 | ||
|                                                BFILTER    => false);
 | ||
|     PKG_P8PANELS_VISUAL.TDATA_GRID_ADD_COL_DEF(RDATA_GRID => RDG,
 | ||
|                                                SNAME      => 'NJOB_DUR',
 | ||
|                                                SCAPTION   => 'Длительн. работы',
 | ||
|                                                SDATA_TYPE => PKG_P8PANELS_VISUAL.SDATA_TYPE_NUMB,
 | ||
|                                                BORDER     => false,
 | ||
|                                                BFILTER    => false);
 | ||
|     PKG_P8PANELS_VISUAL.TDATA_GRID_ADD_COL_DEF(RDATA_GRID => RDG,
 | ||
|                                                SNAME      => 'NMP_LAB',
 | ||
|                                                SCAPTION   => 'Труд.',
 | ||
|                                                SDATA_TYPE => PKG_P8PANELS_VISUAL.SDATA_TYPE_NUMB,
 | ||
|                                                BORDER     => false,
 | ||
|                                                BFILTER    => false);
 | ||
|     PKG_P8PANELS_VISUAL.TDATA_GRID_ADD_COL_DEF(RDATA_GRID => RDG,
 | ||
|                                                SNAME      => 'NMP_LAB_ONE',
 | ||
|                                                SCAPTION   => 'Труд. (в ед. длит.)',
 | ||
|                                                SDATA_TYPE => PKG_P8PANELS_VISUAL.SDATA_TYPE_NUMB,
 | ||
|                                                BORDER     => false,
 | ||
|                                                BFILTER    => false);
 | ||
|     PKG_P8PANELS_VISUAL.TDATA_GRID_ADD_COL_DEF(RDATA_GRID => RDG,
 | ||
|                                                SNAME      => 'NMP_LAB_PLAN',
 | ||
|                                                SCAPTION   => 'Труд. (план, график)',
 | ||
|                                                SDATA_TYPE => PKG_P8PANELS_VISUAL.SDATA_TYPE_NUMB,
 | ||
|                                                BORDER     => false,
 | ||
|                                                BFILTER    => false);
 | ||
|     /* Обходим данные */
 | ||
|     begin
 | ||
|       /* Собираем запрос */
 | ||
|       CSQL := 'select *
 | ||
|                  from (select D.*,
 | ||
|                               ROWNUM NROW
 | ||
|                          from (select JB.RN NRN,                                      
 | ||
|                                       P.RN NPROJECT,
 | ||
|                                       JBP.RN NJB_PRJCTS,
 | ||
|                                       P.CODE || ''-'' || P.NAME_USL SPRJ,
 | ||
|                                       trim(PS.NUMB) || ''-'' || trim(PJ.NUMB) SSTG_JOB,
 | ||
|                                       PJ.NAME SJOB_NAME,
 | ||
|                                       PJ.STATE NJOB_STATE,
 | ||
|                                       JB.DATE_FROM DJOB_BEG,
 | ||
|                                       JB.DATE_TO DJOB_END,
 | ||
|                                       PJMP.LABOUR_P NLABOUR_P                                      
 | ||
|                                  from P8PNL_JB_JOBS    JB,
 | ||
|                                       P8PNL_JB_PRJCTS  JBP,
 | ||
|                                       PROJECTJOB       PJ,
 | ||
|                                       PROJECTJOBMANPOW PJMP,
 | ||
|                                       PROJECT          P,
 | ||
|                                       PROJECTSTAGE     PS
 | ||
|                                 where JB.IDENT = :NIDENT
 | ||
|                                   and JB.STAGE = 0
 | ||
|                                   and JB.PRN = JBP.RN
 | ||
|                                   and JB.SOURCE = PJ.RN                                  
 | ||
|                                   and PJ.COMPANY = :NCOMPANY
 | ||
|                                   and PJ.PRN = P.RN
 | ||
|                                   and PJ.PROJECTSTAGE = PS.RN(+)
 | ||
|                                   and PJ.RN = PJMP.PRN
 | ||
|                                   and PJMP.FCMANPOWER = :NFCMANPOWER
 | ||
|                                   and PJMP.SUBDIV = :NINS_DEPARTMENT
 | ||
|                                   and ((JB.DATE_FROM between :DDATE_FROM and :DDATE_TO) or (JB.DATE_TO between :DDATE_FROM and :DDATE_TO) or
 | ||
|                                       ((JB.DATE_FROM < :DDATE_FROM) and (JB.DATE_TO > :DDATE_TO))) %ORDER_BY%) D) F
 | ||
|                 where F.NROW between :NROW_FROM and :NROW_TO';
 | ||
|       /* Учтём сортировки */
 | ||
|       PKG_P8PANELS_VISUAL.TORDERS_SET_QUERY(RDATA_GRID => RDG, RORDERS => RO, SPATTERN => '%ORDER_BY%', CSQL => CSQL);
 | ||
|       /* Разбираем его */
 | ||
|       ICURSOR := PKG_SQL_DML.OPEN_CURSOR(SWHAT => 'SELECT');
 | ||
|       PKG_SQL_DML.PARSE(ICURSOR => ICURSOR, SQUERY => CSQL);
 | ||
|       /* Делаем подстановку параметров */
 | ||
|       PKG_SQL_DML.BIND_VARIABLE_NUM(ICURSOR => ICURSOR, SNAME => 'NCOMPANY', NVALUE => NCOMPANY);
 | ||
|       PKG_SQL_DML.BIND_VARIABLE_NUM(ICURSOR => ICURSOR, SNAME => 'NIDENT', NVALUE => RPRD.IDENT);
 | ||
|       PKG_SQL_DML.BIND_VARIABLE_NUM(ICURSOR => ICURSOR, SNAME => 'NINS_DEPARTMENT', NVALUE => RPRD.INS_DEPARTMENT);
 | ||
|       PKG_SQL_DML.BIND_VARIABLE_NUM(ICURSOR => ICURSOR, SNAME => 'NFCMANPOWER', NVALUE => RPRD.FCMANPOWER);
 | ||
|       PKG_SQL_DML.BIND_VARIABLE_DATE(ICURSOR => ICURSOR, SNAME => 'DDATE_FROM', DVALUE => RPRD.DATE_FROM);
 | ||
|       PKG_SQL_DML.BIND_VARIABLE_DATE(ICURSOR => ICURSOR, SNAME => 'DDATE_TO', DVALUE => RPRD.DATE_TO);
 | ||
|       PKG_SQL_DML.BIND_VARIABLE_NUM(ICURSOR => ICURSOR, SNAME => 'NROW_FROM', NVALUE => NROW_FROM);
 | ||
|       PKG_SQL_DML.BIND_VARIABLE_NUM(ICURSOR => ICURSOR, SNAME => 'NROW_TO', NVALUE => NROW_TO);
 | ||
|       /* Описываем структуру записи курсора */
 | ||
|       PKG_SQL_DML.DEFINE_COLUMN_NUM(ICURSOR => ICURSOR, IPOSITION => 1);
 | ||
|       PKG_SQL_DML.DEFINE_COLUMN_NUM(ICURSOR => ICURSOR, IPOSITION => 2);
 | ||
|       PKG_SQL_DML.DEFINE_COLUMN_NUM(ICURSOR => ICURSOR, IPOSITION => 3);
 | ||
|       PKG_SQL_DML.DEFINE_COLUMN_STR(ICURSOR => ICURSOR, IPOSITION => 4);
 | ||
|       PKG_SQL_DML.DEFINE_COLUMN_STR(ICURSOR => ICURSOR, IPOSITION => 5);
 | ||
|       PKG_SQL_DML.DEFINE_COLUMN_STR(ICURSOR => ICURSOR, IPOSITION => 6);
 | ||
|       PKG_SQL_DML.DEFINE_COLUMN_NUM(ICURSOR => ICURSOR, IPOSITION => 7);
 | ||
|       PKG_SQL_DML.DEFINE_COLUMN_DATE(ICURSOR => ICURSOR, IPOSITION => 8);
 | ||
|       PKG_SQL_DML.DEFINE_COLUMN_DATE(ICURSOR => ICURSOR, IPOSITION => 9);
 | ||
|       PKG_SQL_DML.DEFINE_COLUMN_NUM(ICURSOR => ICURSOR, IPOSITION => 10);
 | ||
|       /* Делаем выборку */
 | ||
|       if (PKG_SQL_DML.EXECUTE(ICURSOR => ICURSOR) = 0) then
 | ||
|         null;
 | ||
|       end if;
 | ||
|       /* Обходим выбранные записи */
 | ||
|       while (PKG_SQL_DML.FETCH_ROWS(ICURSOR => ICURSOR) > 0)
 | ||
|       loop
 | ||
|         /* Вычислим трудоёмкость в датлизируемом периоде по буферу балансировки */
 | ||
|         PKG_SQL_DML.COLUMN_VALUE_DATE(ICURSOR => ICURSOR, IPOSITION => 8, DVALUE => DJOB_BEG);
 | ||
|         PKG_SQL_DML.COLUMN_VALUE_DATE(ICURSOR => ICURSOR, IPOSITION => 9, DVALUE => DJOB_END);
 | ||
|         PKG_SQL_DML.COLUMN_VALUE_NUM(ICURSOR => ICURSOR, IPOSITION => 10, NVALUE => NMP_LAB);
 | ||
|         P_PROJECTJOB_GET_DURATION(NCOMPANY       => NCOMPANY,
 | ||
|                                   DBEG_DATE      => DJOB_BEG,
 | ||
|                                   DEND_DATE      => DJOB_END,
 | ||
|                                   NDURATION_MEAS => NJB_DURATION_MEAS,
 | ||
|                                   NDURATION      => NJOB_DUR);
 | ||
|         DBEG := RPRD.DATE_FROM;
 | ||
|         if (DJOB_BEG > RPRD.DATE_FROM) then
 | ||
|           DBEG := DJOB_BEG;
 | ||
|         end if;
 | ||
|         DEND := RPRD.DATE_TO;
 | ||
|         if (DJOB_END < RPRD.DATE_TO) then
 | ||
|           DEND := DJOB_END;
 | ||
|         end if;
 | ||
|         if (DJOB_END - DJOB_BEG <> 0) then
 | ||
|           NMP_LAB_ONE := NMP_LAB / (DJOB_END - DJOB_BEG);
 | ||
|         else
 | ||
|           NMP_LAB_ONE := NMP_LAB;
 | ||
|         end if;
 | ||
|       
 | ||
|         NMP_LAB_PLAN := (DEND - DBEG) * NMP_LAB_ONE;
 | ||
|         /* Добавляем колонки с данными */
 | ||
|         PKG_P8PANELS_VISUAL.TROW_ADD_CUR_COLN(RROW      => RDG_ROW,
 | ||
|                                               SNAME     => 'NRN',
 | ||
|                                               ICURSOR   => ICURSOR,
 | ||
|                                               NPOSITION => 1,
 | ||
|                                               BCLEAR    => true);
 | ||
|         PKG_P8PANELS_VISUAL.TROW_ADD_CUR_COLN(RROW => RDG_ROW, SNAME => 'NPROJECT', ICURSOR => ICURSOR, NPOSITION => 2);
 | ||
|         PKG_P8PANELS_VISUAL.TROW_ADD_CUR_COLN(RROW      => RDG_ROW,
 | ||
|                                               SNAME     => 'NJB_PRJCTS',
 | ||
|                                               ICURSOR   => ICURSOR,
 | ||
|                                               NPOSITION => 3);
 | ||
|         PKG_P8PANELS_VISUAL.TROW_ADD_CUR_COLS(RROW => RDG_ROW, SNAME => 'SPRJ', ICURSOR => ICURSOR, NPOSITION => 4);
 | ||
|         PKG_P8PANELS_VISUAL.TROW_ADD_CUR_COLS(RROW => RDG_ROW, SNAME => 'SSTG_JOB', ICURSOR => ICURSOR, NPOSITION => 5);
 | ||
|         PKG_P8PANELS_VISUAL.TROW_ADD_CUR_COLS(RROW      => RDG_ROW,
 | ||
|                                               SNAME     => 'SJOB_NAME',
 | ||
|                                               ICURSOR   => ICURSOR,
 | ||
|                                               NPOSITION => 6);
 | ||
|         PKG_P8PANELS_VISUAL.TROW_ADD_CUR_COLN(RROW      => RDG_ROW,
 | ||
|                                               SNAME     => 'NJOB_STATE',
 | ||
|                                               ICURSOR   => ICURSOR,
 | ||
|                                               NPOSITION => 7);
 | ||
|         PKG_P8PANELS_VISUAL.TROW_ADD_COL(RROW => RDG_ROW, SNAME => 'DJOB_BEG', DVALUE => DJOB_BEG);
 | ||
|         PKG_P8PANELS_VISUAL.TROW_ADD_COL(RROW => RDG_ROW, SNAME => 'DJOB_END', DVALUE => DJOB_END);
 | ||
|         PKG_P8PANELS_VISUAL.TROW_ADD_COL(RROW => RDG_ROW, SNAME => 'NJOB_DUR', NVALUE => NJOB_DUR);
 | ||
|         PKG_P8PANELS_VISUAL.TROW_ADD_COL(RROW => RDG_ROW, SNAME => 'NMP_LAB', NVALUE => NMP_LAB);
 | ||
|         PKG_P8PANELS_VISUAL.TROW_ADD_COL(RROW => RDG_ROW, SNAME => 'NMP_LAB_ONE', NVALUE => NMP_LAB_ONE);
 | ||
|         PKG_P8PANELS_VISUAL.TROW_ADD_COL(RROW => RDG_ROW, SNAME => 'NMP_LAB_PLAN', NVALUE => NMP_LAB_PLAN);
 | ||
|         /* Добавляем строку в таблицу */
 | ||
|         PKG_P8PANELS_VISUAL.TDATA_GRID_ADD_ROW(RDATA_GRID => RDG, RROW => RDG_ROW);
 | ||
|       end loop;
 | ||
|       /* Освобождаем курсор */
 | ||
|       PKG_SQL_DML.CLOSE_CURSOR(ICURSOR => ICURSOR);
 | ||
|     exception
 | ||
|       when others then
 | ||
|         PKG_SQL_DML.CLOSE_CURSOR(ICURSOR => ICURSOR);
 | ||
|         raise;
 | ||
|     end;
 | ||
|     /* Сериализуем описание */
 | ||
|     COUT := PKG_P8PANELS_VISUAL.TDATA_GRID_TO_XML(RDATA_GRID => RDG, NINCLUDE_DEF => NINCLUDE_DEF);
 | ||
|   end JB_PERIODS_LIST_PLAN_JOBS;
 | ||
|   
 | ||
|   /* Получение плановой трудоёскости по текущему состоянию графиков в буфере балансировки для периода балансировки */
 | ||
|   function JB_PERIODS_GET_PLAN_JOBS
 | ||
|   (
 | ||
|     NIDENT                  in number,       -- Идентификатор процесса
 | ||
|     DDATE_FROM              in date,         -- Начало
 | ||
|     DDATE_TO                in date,         -- Окончание
 | ||
|     NINS_DEPARTMENT         in number,       -- Рег. номер штатного подразделения
 | ||
|     NFCMANPOWER             in number        -- Рег. номер трудового ресурса
 | ||
|   ) return                  number           -- Плановая трудоёмкость по текущему состоянию графиков в буфере балансировки
 | ||
|   is
 | ||
|     NRES                    PKG_STD.TNUMBER; -- Буфер для результата
 | ||
|     NPLAN_JOB               PKG_STD.TNUMBER; -- Плановая трудоёмкость текущей работы согласно графика
 | ||
|     DBEG                    PKG_STD.TLDATE;  -- Дата начала для расчёта трудоёмкости текущей работы
 | ||
|     DEND                    PKG_STD.TLDATE;  -- Дата окончания для расчёта трудоёмкости текущей работы
 | ||
|   begin
 | ||
|     /* Обходим все работы в буфере подходящие по условиям */
 | ||
|     for C in (select JB.*,
 | ||
|                      PJMP.LABOUR_P
 | ||
|                 from P8PNL_JB_JOBS    JB,
 | ||
|                      PROJECTJOB       PJ,
 | ||
|                      PROJECTJOBMANPOW PJMP
 | ||
|                where JB.IDENT = NIDENT
 | ||
|                  and JB.STAGE = 0
 | ||
|                  and JB.SOURCE = PJ.RN
 | ||
|                  and PJ.RN = PJMP.PRN
 | ||
|                  and PJMP.FCMANPOWER = NFCMANPOWER
 | ||
|                  and PJMP.SUBDIV = NINS_DEPARTMENT
 | ||
|                  and ((JB.DATE_FROM between DDATE_FROM and DDATE_TO) or (JB.DATE_TO between DDATE_FROM and DDATE_TO) or
 | ||
|                      ((JB.DATE_FROM < DDATE_FROM) and (JB.DATE_TO > DDATE_TO))))
 | ||
|     loop
 | ||
|       /* Вычислим трудоёмкость по графику для попавшейся работы */
 | ||
|       DBEG := DDATE_FROM;
 | ||
|       if (C.DATE_FROM > DDATE_FROM) then
 | ||
|         DBEG := C.DATE_FROM;
 | ||
|       end if;
 | ||
|       DEND := DDATE_TO;
 | ||
|       if (C.DATE_TO < DDATE_TO) then
 | ||
|         DEND := C.DATE_TO;
 | ||
|       end if;
 | ||
|       if (C.LABOUR_P <> 0) then
 | ||
|         if (C.DATE_TO - C.DATE_FROM <> 0) then
 | ||
|           NPLAN_JOB := (DEND - DBEG) * (C.LABOUR_P / (C.DATE_TO - C.DATE_FROM));
 | ||
|         else
 | ||
|           NPLAN_JOB := (DEND - DBEG) * C.LABOUR_P;
 | ||
|         end if;
 | ||
|       else
 | ||
|         NPLAN_JOB := 0;
 | ||
|       end if;
 | ||
|       /* Накопим сумму в буфере результата */
 | ||
|       NRES := COALESCE(NRES, 0) + NPLAN_JOB;
 | ||
|     end loop;
 | ||
|     /* Вернём собранный результат */
 | ||
|     return COALESCE(NRES, 0);
 | ||
|   end JB_PERIODS_GET_PLAN_JOBS;
 | ||
|   
 | ||
|   /* Базовое добавление периода балансировки работ */
 | ||
|   procedure JB_PERIODS_BASE_INSERT
 | ||
|   (
 | ||
|     NIDENT                  in number,      -- Идентификатор процесса
 | ||
|     DDATE_FROM              in date,        -- Начало
 | ||
|     DDATE_TO                in date,        -- Окончание
 | ||
|     NINS_DEPARTMENT         in number,      -- Рег. номер штатного подразделения
 | ||
|     NFCMANPOWER             in number,      -- Рег. номер трудового ресурса
 | ||
|     NLAB_PLAN_FOT           in number := 0, -- Трудоёмкость (план, по ФОТ)
 | ||
|     NLAB_FACT_RPT           in number := 0, -- Трудоёмкость (факт, по отчёту)
 | ||
|     NLAB_PLAN_JOBS          in number :=0,  -- Трудоёмкость (план, по графику)
 | ||
|     NJB_PERIODS             out number      -- Рег. номер записи периода балансировки
 | ||
|   )
 | ||
|   is
 | ||
|   begin
 | ||
|     /* Сформируем рег. номер записи */
 | ||
|     NJB_PERIODS := GEN_ID();
 | ||
|     /* Добавим запись */
 | ||
|     insert into P8PNL_JB_PERIODS
 | ||
|       (RN,
 | ||
|        IDENT,
 | ||
|        DATE_FROM,
 | ||
|        DATE_TO,
 | ||
|        INS_DEPARTMENT,
 | ||
|        FCMANPOWER,
 | ||
|        LAB_PLAN_FOT,
 | ||
|        LAB_FACT_RPT,
 | ||
|        LAB_PLAN_JOBS)
 | ||
|     values
 | ||
|       (NJB_PERIODS,
 | ||
|        NIDENT,
 | ||
|        DDATE_FROM,
 | ||
|        DDATE_TO,
 | ||
|        NINS_DEPARTMENT,
 | ||
|        NFCMANPOWER,
 | ||
|        NLAB_PLAN_FOT,
 | ||
|        NLAB_FACT_RPT,
 | ||
|        NLAB_PLAN_JOBS);
 | ||
|   end JB_PERIODS_BASE_INSERT;
 | ||
|   
 | ||
|   /* Очистка периодов балансировки */
 | ||
|   procedure JB_PERIODS_CLEAN
 | ||
|   (
 | ||
|     NIDENT                  in number   -- Идентификатор процесса
 | ||
|   )
 | ||
|   is
 | ||
|   begin
 | ||
|     /* Удаляем периоды балансировки */
 | ||
|     delete from P8PNL_JB_PERIODS T where T.IDENT = NIDENT;
 | ||
|   end JB_PERIODS_CLEAN;
 | ||
|   
 | ||
|   /* Пересчёт периодов балансировки */
 | ||
|   procedure JB_PERIODS_RECALC
 | ||
|   (
 | ||
|     NIDENT                  in number,                             -- Идентификатор процесса
 | ||
|     DBEGIN                  in date,                               -- Дата начала периода мониторинга загрузки ресурсов
 | ||
|     NINITIAL                in number,                             -- Признак первоначального рассчёта (0 - пересчёт, 1 - первоначальный рассчёт)
 | ||
|     NRESOURCE_STATUS        out number                             -- Состояние ресурсов (0 - без отклонений, 1 - есть отклонения)
 | ||
|   )
 | ||
|   is
 | ||
|     NCOMPANY                PKG_STD.TREF := GET_SESSION_COMPANY(); -- Организация сеанса
 | ||
|     DJB_BEG                 PKG_STD.TLDATE;                        -- Дата начала периода балансировки
 | ||
|     DJB_END                 PKG_STD.TLDATE;                        -- Дата окончания периода балансировки
 | ||
|     DBEG                    PKG_STD.TLDATE;                        -- Дата начала текущего месяца периода балансировки
 | ||
|     DEND                    PKG_STD.TLDATE;                        -- Дата окончания текущего месяца периода балансировки
 | ||
|     NJB_PERIODS             PKG_STD.TREF;                          -- Рег. номер добавленного периода балансировки
 | ||
|     NLAB_PLAN_FOT           PKG_STD.TNUMBER;                       -- Плановая трудоёмкость по ФОТ для текущего месяца периода балансировки
 | ||
|     NLAB_PLAN_JOBS          PKG_STD.TNUMBER;                       -- Плановая трудоёмкость по плану-графику в буфере для текущего месяца периода балансировки
 | ||
|   begin    
 | ||
|     /* Подчистка при перерасчёте */
 | ||
|     if (NINITIAL = 0) then
 | ||
|       JB_PERIODS_CLEAN(NIDENT => NIDENT);
 | ||
|     end if;
 | ||
|     /* Скажем, что нет отклонений */
 | ||
|     NRESOURCE_STATUS := 0;
 | ||
|     /* Определим период балансировки */
 | ||
|     DJB_BEG := DBEGIN;
 | ||
|     DJB_END := JB_GET_END(NIDENT => NIDENT);
 | ||
|     /* Сформируем записи периодов балансировки */
 | ||
|     for I in 0 .. FLOOR(MONTHS_BETWEEN(DJB_END, DJB_BEG))
 | ||
|     loop
 | ||
|       DBEG := TRUNC(ADD_MONTHS(DJB_BEG, I), 'mm');
 | ||
|       DEND := LAST_DAY(DBEG);
 | ||
|       /* Определим подразделения, занятые в работах в этом месяце */
 | ||
|       for D in (select JMP.FCMANPOWER,
 | ||
|                        JMP.SUBDIV
 | ||
|                   from P8PNL_JB_JOBS    JB,
 | ||
|                        PROJECTJOB       J,
 | ||
|                        PROJECTJOBMANPOW JMP
 | ||
|                  where JB.IDENT = NIDENT
 | ||
|                    and JB.STAGE = 0
 | ||
|                    and ((JB.DATE_FROM between DBEG and DEND) or (JB.DATE_TO between DBEG and DEND) or
 | ||
|                        ((JB.DATE_FROM < DBEG) and (JB.DATE_TO > DEND)))
 | ||
|                    and JB.SOURCE = J.RN
 | ||
|                    and J.RN = JMP.PRN
 | ||
|                    and JMP.SUBDIV is not null
 | ||
|                  group by JMP.FCMANPOWER,
 | ||
|                           JMP.SUBDIV)
 | ||
|       loop
 | ||
|         /* Рассчитаем трудоёмкость по ФОТ (в часах) */
 | ||
|         NLAB_PLAN_FOT := JB_PERIODS_GET_PLAN_FOT(NCOMPANY        => NCOMPANY,
 | ||
|                                                  DDATE_FROM      => DBEG,
 | ||
|                                                  DDATE_TO        => DEND,
 | ||
|                                                  NINS_DEPARTMENT => D.SUBDIV,
 | ||
|                                                  NFCMANPOWER     => D.FCMANPOWER);
 | ||
|         /* Рассчитаем трудоёмкость по работам графика */
 | ||
|         NLAB_PLAN_JOBS := JB_PERIODS_GET_PLAN_JOBS(NIDENT          => NIDENT,
 | ||
|                                                    DDATE_FROM      => DBEG,
 | ||
|                                                    DDATE_TO        => DEND,
 | ||
|                                                    NINS_DEPARTMENT => D.SUBDIV,
 | ||
|                                                    NFCMANPOWER     => D.FCMANPOWER);
 | ||
|         /* Добавим запись периода балансировки */
 | ||
|         JB_PERIODS_BASE_INSERT(NIDENT          => NIDENT,
 | ||
|                                DDATE_FROM      => DBEG,
 | ||
|                                DDATE_TO        => DEND,
 | ||
|                                NINS_DEPARTMENT => D.SUBDIV,
 | ||
|                                NFCMANPOWER     => D.FCMANPOWER,
 | ||
|                                NLAB_PLAN_FOT   => NLAB_PLAN_FOT,
 | ||
|                                NLAB_FACT_RPT   => 0,
 | ||
|                                NLAB_PLAN_JOBS  => NLAB_PLAN_JOBS,
 | ||
|                                NJB_PERIODS     => NJB_PERIODS);
 | ||
|         /* Если плановая трудоёмкость по работам графика превысила ФОТ - значит с ресурсами всё плохо */
 | ||
|         if (NLAB_PLAN_JOBS > NLAB_PLAN_FOT) then
 | ||
|           NRESOURCE_STATUS := 1;
 | ||
|         end if;
 | ||
|       end loop;
 | ||
|     end loop;
 | ||
|   end JB_PERIODS_RECALC;
 | ||
|   
 | ||
|   /* Список периодов балансировки */
 | ||
|   procedure JB_PERIODS_LIST
 | ||
|   (
 | ||
|     NIDENT                  in number,                      -- Идентификатор процесса
 | ||
|     NPAGE_NUMBER            in number,                      -- Номер страницы (игнорируется при NPAGE_SIZE=0)
 | ||
|     NPAGE_SIZE              in number,                      -- Количество записей на странице (0 - все)
 | ||
|     CORDERS                 in clob,                        -- Сортировки    
 | ||
|     NINCLUDE_DEF            in number,                      -- Признак включения описания колонок таблицы в ответ
 | ||
|     COUT                    out clob                        -- Сериализованная таблица данных
 | ||
|   )
 | ||
|   is
 | ||
|     RO                      PKG_P8PANELS_VISUAL.TORDERS;    -- Сортировки
 | ||
|     RDG                     PKG_P8PANELS_VISUAL.TDATA_GRID; -- Описание таблицы
 | ||
|     RDG_ROW                 PKG_P8PANELS_VISUAL.TROW;       -- Строка таблицы
 | ||
|     CSQL                    clob;                           -- Буфер для запроса
 | ||
|     ICURSOR                 integer;                        -- Курсор для исполнения запроса
 | ||
|     NROW_FROM               PKG_STD.TREF;                   -- Номер строки с
 | ||
|     NROW_TO                 PKG_STD.TREF;                   -- Номер строки по
 | ||
|   begin
 | ||
|     /* Читем сортировки */
 | ||
|     RO := PKG_P8PANELS_VISUAL.TORDERS_FROM_XML(CORDERS => CORDERS);
 | ||
|     /* Преобразуем номер и размер страницы в номер строк с и по */
 | ||
|     PKG_P8PANELS_VISUAL.UTL_ROWS_LIMITS_CALC(NPAGE_NUMBER => NPAGE_NUMBER,
 | ||
|                                              NPAGE_SIZE   => NPAGE_SIZE,
 | ||
|                                              NROW_FROM    => NROW_FROM,
 | ||
|                                              NROW_TO      => NROW_TO);
 | ||
|     /* Инициализируем таблицу данных */
 | ||
|     RDG := PKG_P8PANELS_VISUAL.TDATA_GRID_MAKE();
 | ||
|     /* Добавляем в таблицу описание колонок */
 | ||
|     PKG_P8PANELS_VISUAL.TDATA_GRID_ADD_COL_DEF(RDATA_GRID => RDG,
 | ||
|                                                SNAME      => 'NRN',
 | ||
|                                                SCAPTION   => 'Рег. номер',
 | ||
|                                                SDATA_TYPE => PKG_P8PANELS_VISUAL.SDATA_TYPE_NUMB,
 | ||
|                                                BVISIBLE   => false);
 | ||
|     PKG_P8PANELS_VISUAL.TDATA_GRID_ADD_COL_DEF(RDATA_GRID => RDG,
 | ||
|                                                SNAME      => 'SPERIOD',
 | ||
|                                                SCAPTION   => 'Период',
 | ||
|                                                SDATA_TYPE => PKG_P8PANELS_VISUAL.SDATA_TYPE_STR,
 | ||
|                                                BORDER     => true,
 | ||
|                                                BFILTER    => false);
 | ||
|     PKG_P8PANELS_VISUAL.TDATA_GRID_ADD_COL_DEF(RDATA_GRID => RDG,
 | ||
|                                                SNAME      => 'SINS_DEPARTMENT',
 | ||
|                                                SCAPTION   => 'Подразделение',
 | ||
|                                                SDATA_TYPE => PKG_P8PANELS_VISUAL.SDATA_TYPE_STR,
 | ||
|                                                BORDER     => true,
 | ||
|                                                BFILTER    => false);
 | ||
|     PKG_P8PANELS_VISUAL.TDATA_GRID_ADD_COL_DEF(RDATA_GRID => RDG,
 | ||
|                                                SNAME      => 'SFCMANPOWER',
 | ||
|                                                SCAPTION   => 'Ресурс',
 | ||
|                                                SDATA_TYPE => PKG_P8PANELS_VISUAL.SDATA_TYPE_STR,
 | ||
|                                                BORDER     => true,
 | ||
|                                                BFILTER    => false);
 | ||
|     PKG_P8PANELS_VISUAL.TDATA_GRID_ADD_COL_DEF(RDATA_GRID => RDG,
 | ||
|                                                SNAME      => 'NLAB_PLAN_FOT',
 | ||
|                                                SCAPTION   => 'Труд. (план, ФОТ)',
 | ||
|                                                SDATA_TYPE => PKG_P8PANELS_VISUAL.SDATA_TYPE_NUMB,
 | ||
|                                                BORDER     => true,
 | ||
|                                                BFILTER    => false);
 | ||
|     PKG_P8PANELS_VISUAL.TDATA_GRID_ADD_COL_DEF(RDATA_GRID => RDG,
 | ||
|                                                SNAME      => 'NLAB_FACT_RPT',
 | ||
|                                                SCAPTION   => 'Труд. (факт, отчёт)',
 | ||
|                                                SDATA_TYPE => PKG_P8PANELS_VISUAL.SDATA_TYPE_NUMB,
 | ||
|                                                BVISIBLE   => false,
 | ||
|                                                BORDER     => true,
 | ||
|                                                BFILTER    => false);
 | ||
|     PKG_P8PANELS_VISUAL.TDATA_GRID_ADD_COL_DEF(RDATA_GRID => RDG,
 | ||
|                                                SNAME      => 'NLAB_DIFF_RPT_FOT',
 | ||
|                                                SCAPTION   => 'Отклон. (факт-план)',
 | ||
|                                                SDATA_TYPE => PKG_P8PANELS_VISUAL.SDATA_TYPE_NUMB,
 | ||
|                                                BVISIBLE   => false,
 | ||
|                                                BORDER     => true,
 | ||
|                                                BFILTER    => false);
 | ||
|     PKG_P8PANELS_VISUAL.TDATA_GRID_ADD_COL_DEF(RDATA_GRID => RDG,
 | ||
|                                                SNAME      => 'NLAB_PLAN_JOBS',
 | ||
|                                                SCAPTION   => 'Труд. (план, график)',
 | ||
|                                                SDATA_TYPE => PKG_P8PANELS_VISUAL.SDATA_TYPE_NUMB,
 | ||
|                                                BORDER     => true,
 | ||
|                                                BFILTER    => false);
 | ||
|     PKG_P8PANELS_VISUAL.TDATA_GRID_ADD_COL_DEF(RDATA_GRID => RDG,
 | ||
|                                                SNAME      => 'NLAB_DIFF_JOBS_FOT',
 | ||
|                                                SCAPTION   => 'Отклон. (график-план)',
 | ||
|                                                SDATA_TYPE => PKG_P8PANELS_VISUAL.SDATA_TYPE_NUMB,
 | ||
|                                                BORDER     => true,
 | ||
|                                                BFILTER    => false);
 | ||
|     /* Обходим данные */
 | ||
|     begin
 | ||
|       /* Собираем запрос */
 | ||
|       CSQL := 'select *
 | ||
|                  from (select D.*,
 | ||
|                               ROWNUM NROW
 | ||
|                          from (select P.RN NRN,
 | ||
|                                       TO_CHAR(P.DATE_FROM, ''YYYY.MM'') SPERIOD,
 | ||
|                                       INSD.CODE SINS_DEPARTMENT,
 | ||
|                                       MP.CODE SFCMANPOWER,
 | ||
|                                       P.LAB_PLAN_FOT NLAB_PLAN_FOT,
 | ||
|                                       P.LAB_FACT_RPT NLAB_FACT_RPT,
 | ||
|                                       P.LAB_FACT_RPT - P.LAB_PLAN_FOT NLAB_DIFF_RPT_FOT,
 | ||
|                                       P.LAB_PLAN_JOBS NLAB_PLAN_JOBS,
 | ||
|                                       P.LAB_PLAN_JOBS - P.LAB_PLAN_FOT NLAB_DIFF_JOBS_FOT
 | ||
|                                  from P8PNL_JB_PERIODS P,
 | ||
|                                       INS_DEPARTMENT   INSD,
 | ||
|                                       FCMANPOWER       MP
 | ||
|                                 where P.IDENT = :NIDENT
 | ||
|                                   and P.INS_DEPARTMENT = INSD.RN
 | ||
|                                   and P.FCMANPOWER = MP.RN %ORDER_BY%) D) F
 | ||
|                 where F.NROW between :NROW_FROM and :NROW_TO';
 | ||
|       /* Учтём сортировки */
 | ||
|       PKG_P8PANELS_VISUAL.TORDERS_SET_QUERY(RDATA_GRID => RDG, RORDERS => RO, SPATTERN => '%ORDER_BY%', CSQL => CSQL);
 | ||
|       /* Разбираем его */
 | ||
|       ICURSOR := PKG_SQL_DML.OPEN_CURSOR(SWHAT => 'SELECT');
 | ||
|       PKG_SQL_DML.PARSE(ICURSOR => ICURSOR, SQUERY => CSQL);
 | ||
|       /* Делаем подстановку параметров */
 | ||
|       PKG_SQL_DML.BIND_VARIABLE_NUM(ICURSOR => ICURSOR, SNAME => 'NIDENT', NVALUE => NIDENT);
 | ||
|       PKG_SQL_DML.BIND_VARIABLE_NUM(ICURSOR => ICURSOR, SNAME => 'NROW_FROM', NVALUE => NROW_FROM);
 | ||
|       PKG_SQL_DML.BIND_VARIABLE_NUM(ICURSOR => ICURSOR, SNAME => 'NROW_TO', NVALUE => NROW_TO);
 | ||
|       /* Описываем структуру записи курсора */
 | ||
|       PKG_SQL_DML.DEFINE_COLUMN_NUM(ICURSOR => ICURSOR, IPOSITION => 1);
 | ||
|       PKG_SQL_DML.DEFINE_COLUMN_STR(ICURSOR => ICURSOR, IPOSITION => 2);
 | ||
|       PKG_SQL_DML.DEFINE_COLUMN_STR(ICURSOR => ICURSOR, IPOSITION => 3);
 | ||
|       PKG_SQL_DML.DEFINE_COLUMN_STR(ICURSOR => ICURSOR, IPOSITION => 4);
 | ||
|       PKG_SQL_DML.DEFINE_COLUMN_NUM(ICURSOR => ICURSOR, IPOSITION => 5);
 | ||
|       PKG_SQL_DML.DEFINE_COLUMN_NUM(ICURSOR => ICURSOR, IPOSITION => 6);
 | ||
|       PKG_SQL_DML.DEFINE_COLUMN_NUM(ICURSOR => ICURSOR, IPOSITION => 7);
 | ||
|       PKG_SQL_DML.DEFINE_COLUMN_NUM(ICURSOR => ICURSOR, IPOSITION => 8);
 | ||
|       PKG_SQL_DML.DEFINE_COLUMN_NUM(ICURSOR => ICURSOR, IPOSITION => 9);
 | ||
|       /* Делаем выборку */
 | ||
|       if (PKG_SQL_DML.EXECUTE(ICURSOR => ICURSOR) = 0) then
 | ||
|         null;
 | ||
|       end if;
 | ||
|       /* Обходим выбранные записи */
 | ||
|       while (PKG_SQL_DML.FETCH_ROWS(ICURSOR => ICURSOR) > 0)
 | ||
|       loop
 | ||
|         /* Добавляем колонки с данными */
 | ||
|         PKG_P8PANELS_VISUAL.TROW_ADD_CUR_COLN(RROW      => RDG_ROW,
 | ||
|                                               SNAME     => 'NRN',
 | ||
|                                               ICURSOR   => ICURSOR,
 | ||
|                                               NPOSITION => 1,
 | ||
|                                               BCLEAR    => true);
 | ||
|         PKG_P8PANELS_VISUAL.TROW_ADD_CUR_COLS(RROW => RDG_ROW, SNAME => 'SPERIOD', ICURSOR => ICURSOR, NPOSITION => 2);
 | ||
|         PKG_P8PANELS_VISUAL.TROW_ADD_CUR_COLS(RROW      => RDG_ROW,
 | ||
|                                               SNAME     => 'SINS_DEPARTMENT',
 | ||
|                                               ICURSOR   => ICURSOR,
 | ||
|                                               NPOSITION => 3);
 | ||
|         PKG_P8PANELS_VISUAL.TROW_ADD_CUR_COLS(RROW      => RDG_ROW,
 | ||
|                                               SNAME     => 'SFCMANPOWER',
 | ||
|                                               ICURSOR   => ICURSOR,
 | ||
|                                               NPOSITION => 4);
 | ||
|         PKG_P8PANELS_VISUAL.TROW_ADD_CUR_COLN(RROW      => RDG_ROW,
 | ||
|                                               SNAME     => 'NLAB_PLAN_FOT',
 | ||
|                                               ICURSOR   => ICURSOR,
 | ||
|                                               NPOSITION => 5);
 | ||
|         PKG_P8PANELS_VISUAL.TROW_ADD_CUR_COLN(RROW      => RDG_ROW,
 | ||
|                                               SNAME     => 'NLAB_FACT_RPT',
 | ||
|                                               ICURSOR   => ICURSOR,
 | ||
|                                               NPOSITION => 6);
 | ||
|         PKG_P8PANELS_VISUAL.TROW_ADD_CUR_COLN(RROW      => RDG_ROW,
 | ||
|                                               SNAME     => 'NLAB_DIFF_RPT_FOT',
 | ||
|                                               ICURSOR   => ICURSOR,
 | ||
|                                               NPOSITION => 7);
 | ||
|         PKG_P8PANELS_VISUAL.TROW_ADD_CUR_COLN(RROW      => RDG_ROW,
 | ||
|                                               SNAME     => 'NLAB_PLAN_JOBS',
 | ||
|                                               ICURSOR   => ICURSOR,
 | ||
|                                               NPOSITION => 8);
 | ||
|         PKG_P8PANELS_VISUAL.TROW_ADD_CUR_COLN(RROW      => RDG_ROW,
 | ||
|                                               SNAME     => 'NLAB_DIFF_JOBS_FOT',
 | ||
|                                               ICURSOR   => ICURSOR,
 | ||
|                                               NPOSITION => 9);
 | ||
|         /* Добавляем строку в таблицу */
 | ||
|         PKG_P8PANELS_VISUAL.TDATA_GRID_ADD_ROW(RDATA_GRID => RDG, RROW => RDG_ROW);
 | ||
|       end loop;
 | ||
|       /* Освобождаем курсор */
 | ||
|       PKG_SQL_DML.CLOSE_CURSOR(ICURSOR => ICURSOR);
 | ||
|     exception
 | ||
|       when others then
 | ||
|         PKG_SQL_DML.CLOSE_CURSOR(ICURSOR => ICURSOR);
 | ||
|         raise;
 | ||
|     end;
 | ||
|     /* Сериализуем описание */
 | ||
|     COUT := PKG_P8PANELS_VISUAL.TDATA_GRID_TO_XML(RDATA_GRID => RDG, NINCLUDE_DEF => NINCLUDE_DEF);
 | ||
|   end JB_PERIODS_LIST;
 | ||
|   
 | ||
|   /* Очистка данных балансировки */
 | ||
|   procedure JB_CLEAN
 | ||
|   (
 | ||
|     NIDENT                  in number   -- Идентификатор буфера сформированных данных
 | ||
|   )
 | ||
|   is
 | ||
|   begin
 | ||
|     /* Удаляем список предшествующих работ */
 | ||
|     delete from P8PNL_JB_JOBSPREV T where T.IDENT = NIDENT;
 | ||
|     /* Удаляем список работ */
 | ||
|     for C in (select T.RN
 | ||
|                 from P8PNL_JB_JOBS T
 | ||
|                where T.IDENT = NIDENT
 | ||
|               connect by prior T.RN = T.HRN
 | ||
|                start with T.HRN is null
 | ||
|                order by level desc)
 | ||
|     loop
 | ||
|       delete from P8PNL_JB_JOBS T where T.RN = C.RN;
 | ||
|     end loop;
 | ||
|     /* Удаляем список проектов */
 | ||
|     delete from P8PNL_JB_PRJCTS T where T.IDENT = NIDENT;
 | ||
|     /* Удаляем периоды балансировки */
 | ||
|     JB_PERIODS_CLEAN(NIDENT => NIDENT);
 | ||
|   end JB_CLEAN;
 | ||
|   
 | ||
|   /* Формирование исходных данных для балансировки планов-графиков работ */
 | ||
|   procedure JB_INIT
 | ||
|   (
 | ||
|     DBEGIN                  in out date,                           -- Дата начала периода мониторинга загрузки ресурсов
 | ||
|     DFACT                   in out date,                           -- Факт по состоянию на
 | ||
|     NDURATION_MEAS          in out number,                         -- Единица измерения длительности (0 - день, 1 - неделя, 2 - декада, 3 - месяц, 4 - квартал, 5 - год)
 | ||
|     SLAB_MEAS               in out varchar2,                       -- Единица измерения трудоёмкости
 | ||
|     NIDENT                  in out number,                         -- Идентификатор буфера сформированных данных (null - сгенерировать новый, !null - удалить старые данные и пересоздать с указанным идентификатором)
 | ||
|     NRESOURCE_STATUS        out number                             -- Состояние ресурсов (0 - без отклонений, 1 - есть отклонения)
 | ||
|   )
 | ||
|   is
 | ||
|     NCOMPANY                PKG_STD.TREF := GET_SESSION_COMPANY(); -- Организация сеанса
 | ||
|     SUTILIZER               PKG_STD.TSTRING := UTILIZER();         -- Пользователь сеанса
 | ||
|     NUTILIZER_AGENT         PKG_STD.TREF;                          -- Рег. номер контрагента текущего пользователя
 | ||
|     NJB_PRJCTS              PKG_STD.TREF;                          -- Рег. номер проекта в списке для балансировки
 | ||
|     NJB_JOBS_STAGE          PKG_STD.TREF;                          -- Рег. номер этапа проекта в списке для балансировки
 | ||
|     NJB_JOBS_JOB            PKG_STD.TREF;                          -- Рег. номер работы проекта в списке для балансировки
 | ||
|     NJB_JOBS_JOBPREV        PKG_STD.TREF;                          -- Рег. номер предшествующей работы проекта в списке для балансировки
 | ||
|     RH_JB_JOBS              P8PNL_JB_JOBS%rowtype;                 -- Запись родительской работы/этапа в иехархии балансируемых
 | ||
|     RH_JB_JOBS_PREV         P8PNL_JB_JOBS%rowtype;                 -- Запись предшествующей работы в иехархии балансируемых    
 | ||
|     NDURATION               P8PNL_JB_JOBS.DURATION%type;           -- Длительност текущей работы/этапа
 | ||
|     NEDITABLE               PKG_STD.TREF;                          -- Признак возможности редактирования работы
 | ||
|     NLAB_MEAS               PKG_STD.TREF;                          -- Рег. номер выбранной для рассчётов единицы измерения трудоёмкости    
 | ||
|   begin
 | ||
|     /* Обработаем дату начала периода мониторинга загрузки ресурсов */
 | ||
|     if (DBEGIN is null) then
 | ||
|       DBEGIN := TRUNC(sysdate, 'yyyy');
 | ||
|     else
 | ||
|       DBEGIN := TRUNC(DBEGIN, 'yyyy');
 | ||
|     end if;
 | ||
|     /* Обработаем единицу измерения длительности (пока - она всегда должна быть "день", по умолчанию) */
 | ||
|     NDURATION_MEAS := NJB_DURATION_MEAS;
 | ||
|     /* Обработаем единицу измерения трудоёмкости (пока - она всегда должна быть "ч/ч", по умолчанию) */
 | ||
|     SLAB_MEAS := SJB_LAB_MEAS;
 | ||
|     FIND_DICMUNTS_BY_MNEMO(NFLAG_SMART => 0, NCOMPANY => NCOMPANY, SMEAS_MNEMO => SLAB_MEAS, NRN => NLAB_MEAS);
 | ||
|     /* Отработаем идентификатор буфера */
 | ||
|     if (NIDENT is null) then
 | ||
|       NIDENT := GEN_IDENT();
 | ||
|     else
 | ||
|       JB_CLEAN(NIDENT => NIDENT);
 | ||
|     end if;
 | ||
|     /* Найдем контрагента, соответствующего текущему пользователю */
 | ||
|     FIND_AGNLIST_AUTHID(NFLAG_OPTION => 1, NCOMPANY => NCOMPANY, SPERS_AUTHID => SUTILIZER, NAGENT => NUTILIZER_AGENT);
 | ||
|     /* Обходим проекты */
 | ||
|     for PRJ in (select P.RN NRN,
 | ||
|                        COALESCE((select 1
 | ||
|                                   from PROJECTJOB   PJ,
 | ||
|                                        PROJECTSTAGE PS
 | ||
|                                  where PJ.PRN = P.RN
 | ||
|                                    and PJ.BEGPLAN is not null
 | ||
|                                    and PJ.ENDPLAN is not null
 | ||
|                                    and PJ.PROJECTSTAGE = PS.RN
 | ||
|                                    and PS.BEGPLAN is not null
 | ||
|                                    and PS.ENDPLAN is not null
 | ||
|                                    and ROWNUM <= 1),
 | ||
|                                 0) NJOBS,
 | ||
|                        COALESCE((select 1
 | ||
|                                   from AGNLIST AG
 | ||
|                                  where AG.RN = P.RESPONSIBLE
 | ||
|                                    and AG.RN = NUTILIZER_AGENT),
 | ||
|                                 0) NEDITABLE,
 | ||
|                        P.BEGPLAN DBEGPLAN,
 | ||
|                        P.ENDPLAN DENDPLAN
 | ||
|                   from PROJECT P
 | ||
|                  where P.COMPANY = NCOMPANY
 | ||
|                    and P.STATE not in (3, 5)
 | ||
|                    and exists (select null from V_USERPRIV UP where UP.CATALOG = P.CRN)
 | ||
|                    and exists (select null
 | ||
|                           from V_USERPRIV UP
 | ||
|                          where UP.JUR_PERS = P.JUR_PERS
 | ||
|                            and UP.UNITCODE = 'Projects')
 | ||
|                  order by P.NAME_USL)
 | ||
|     loop
 | ||
|       /* Помещаем проект в список балансируемых */
 | ||
|       JB_PRJCTS_BASE_INSERT(NIDENT     => NIDENT,
 | ||
|                             NPROJECT   => PRJ.NRN,
 | ||
|                             NJOBS      => PRJ.NJOBS,
 | ||
|                             NEDITABLE  => PRJ.NEDITABLE,
 | ||
|                             NCHANGED   => 0,
 | ||
|                             NJB_PRJCTS => NJB_PRJCTS);
 | ||
|       /* Обходим этапы проекта в порядке иерархии */
 | ||
|       for STG in (select PS.COMPANY NCOMPANY,
 | ||
|                          PS.RN NRN,
 | ||
|                          PS.HRN NHRN,
 | ||
|                          trim(PS.NUMB) SNUMB,
 | ||
|                          PS.NAME SNAME,
 | ||
|                          PS.BEGPLAN DBEGPLAN,
 | ||
|                          PS.ENDPLAN DENDPLAN,
 | ||
|                          COALESCE(AG.AGNABBR, DP.CODE) SEXECUTOR
 | ||
|                     from PROJECTSTAGE   PS,
 | ||
|                          AGNLIST        AG,
 | ||
|                          INS_DEPARTMENT DP
 | ||
|                    where PS.PRN = PRJ.NRN
 | ||
|                      and PS.BEGPLAN is not null
 | ||
|                      and PS.ENDPLAN is not null
 | ||
|                      and PS.RESPONSIBLE = AG.RN(+)
 | ||
|                      and PS.SUBDIV_RESP = DP.RN(+)
 | ||
|                   connect by prior PS.RN = PS.HRN
 | ||
|                    start with PS.HRN is null
 | ||
|                    order by level,
 | ||
|                             PS.NUMB,
 | ||
|                             PS.BEGPLAN)
 | ||
|       loop
 | ||
|         /* Найдём родительский этап в списке балансировки */
 | ||
|         if (STG.NHRN is not null) then
 | ||
|           RH_JB_JOBS := JB_JOBS_GET_BY_SOURCE(NIDENT => NIDENT, NPRN => NJB_PRJCTS, NSOURCE => STG.NHRN);
 | ||
|         else
 | ||
|           RH_JB_JOBS := null;
 | ||
|         end if;
 | ||
|         /* Определим длительность этапа */
 | ||
|         P_PROJECTJOB_GET_DURATION(NCOMPANY       => STG.NCOMPANY,
 | ||
|                                   DBEG_DATE      => STG.DBEGPLAN,
 | ||
|                                   DEND_DATE      => STG.DENDPLAN,
 | ||
|                                   NDURATION_MEAS => NDURATION_MEAS,
 | ||
|                                   NDURATION      => NDURATION);
 | ||
|         /* Помещаем этап в список балансировки */
 | ||
|         JB_JOBS_BASE_INSERT(NIDENT     => NIDENT,
 | ||
|                             NPRN       => NJB_PRJCTS,
 | ||
|                             NHRN       => RH_JB_JOBS.RN,
 | ||
|                             NSOURCE    => STG.NRN,
 | ||
|                             SNUMB      => STG.SNUMB,
 | ||
|                             SNAME      => STG.SNAME,
 | ||
|                             DDATE_FROM => STG.DBEGPLAN,
 | ||
|                             DDATE_TO   => STG.DENDPLAN,
 | ||
|                             NDURATION  => COALESCE(NDURATION, 0),
 | ||
|                             SEXECUTOR  => STG.SEXECUTOR,
 | ||
|                             NSTAGE     => 1,
 | ||
|                             NEDITABLE  => 0,
 | ||
|                             NJB_JOBS   => NJB_JOBS_STAGE);
 | ||
|         /* Обходим работы этапа */
 | ||
|         for PJ in (select J.COMPANY NCOMPANY,
 | ||
|                           J.RN NRN,
 | ||
|                           trim(J.NUMB) SNUMB,
 | ||
|                           J.NAME SNAME,
 | ||
|                           J.BEGPLAN DBEGPLAN,
 | ||
|                           J.ENDPLAN DENDPLAN,
 | ||
|                           COALESCE(COALESCE(DP.CODE, AG.AGNABBR), STG.SEXECUTOR) SEXECUTOR,
 | ||
|                           J.STATE NSTATE
 | ||
|                      from PROJECTJOB     J,
 | ||
|                           AGNLIST        AG,
 | ||
|                           INS_DEPARTMENT DP
 | ||
|                     where J.PRN = PRJ.NRN
 | ||
|                       and J.PROJECTSTAGE = STG.NRN
 | ||
|                       and J.BEGPLAN is not null
 | ||
|                       and J.ENDPLAN is not null
 | ||
|                       and J.SUBDIV = DP.RN(+)
 | ||
|                       and J.PERFORM = AG.RN(+)
 | ||
|                     order by J.NUMB,
 | ||
|                              J.BEGPLAN)
 | ||
|         loop
 | ||
|           /* Определим возможность редактирования работы */
 | ||
|           NEDITABLE := 1;
 | ||
|           if ((PRJ.NEDITABLE = 0) or (PJ.NSTATE not in (0, 1))) then
 | ||
|             NEDITABLE := 0;
 | ||
|           end if;
 | ||
|           /* Определим длительность работы */
 | ||
|           P_PROJECTJOB_GET_DURATION(NCOMPANY       => PJ.NCOMPANY,
 | ||
|                                     DBEG_DATE      => PJ.DBEGPLAN,
 | ||
|                                     DEND_DATE      => PJ.DENDPLAN,
 | ||
|                                     NDURATION_MEAS => NDURATION_MEAS,
 | ||
|                                     NDURATION      => NDURATION);
 | ||
|           /* Помещаем работу в список балансировки */
 | ||
|           JB_JOBS_BASE_INSERT(NIDENT     => NIDENT,
 | ||
|                               NPRN       => NJB_PRJCTS,
 | ||
|                               NHRN       => NJB_JOBS_STAGE,
 | ||
|                               NSOURCE    => PJ.NRN,
 | ||
|                               SNUMB      => PJ.SNUMB,
 | ||
|                               SNAME      => PJ.SNAME,
 | ||
|                               DDATE_FROM => PJ.DBEGPLAN,
 | ||
|                               DDATE_TO   => PJ.DENDPLAN,
 | ||
|                               NDURATION  => COALESCE(NDURATION, 0),
 | ||
|                               SEXECUTOR  => PJ.SEXECUTOR,
 | ||
|                               NSTAGE     => 0,
 | ||
|                               NEDITABLE  => NEDITABLE,
 | ||
|                               NJB_JOBS   => NJB_JOBS_JOB);
 | ||
|         end loop;
 | ||
|       end loop;
 | ||
|       /* Обходим работы проекта ещё раз, для наполнения списка предшествующих в буфере балансировки */
 | ||
|       for PJ in (select J.RN NRN from PROJECTJOB J where J.PRN = PRJ.NRN)
 | ||
|       loop
 | ||
|         RH_JB_JOBS := JB_JOBS_GET_BY_SOURCE(NIDENT => NIDENT, NPRN => NJB_PRJCTS, NSOURCE => PJ.NRN);
 | ||
|         /* Помещаем предшествующие работы в буфер балансировки */
 | ||
|         for PJPREV in (select JP.PROJECTJOB NPROJECTJOB from PROJECTJOBPREV JP where JP.PRN = PJ.NRN)
 | ||
|         loop
 | ||
|           RH_JB_JOBS_PREV := JB_JOBS_GET_BY_SOURCE(NIDENT => NIDENT, NPRN => NJB_PRJCTS, NSOURCE => PJPREV.NPROJECTJOB);
 | ||
|           JB_JOBSPREV_BASE_INSERT(NIDENT       => NIDENT,
 | ||
|                                   NPRN         => RH_JB_JOBS.RN,
 | ||
|                                   NJB_JOBS     => RH_JB_JOBS_PREV.RN,
 | ||
|                                   NJB_JOBSPREV => NJB_JOBS_JOBPREV);
 | ||
|         end loop;
 | ||
|       end loop;
 | ||
|     end loop;
 | ||
|     /* Сформируем данные монитора загрузки ресурсов */
 | ||
|     JB_PERIODS_RECALC(NIDENT => NIDENT, DBEGIN => DBEGIN, NINITIAL => 1, NRESOURCE_STATUS => NRESOURCE_STATUS);
 | ||
|   end JB_INIT;
 | ||
| 
 | ||
| end PKG_P8PANELS_PROJECTS;
 | ||
| /
 |